← Back to Gilbert

Document Gilbert_doc_eaa9eee7ad

Full Text

City of Gilbert, Iowa REQUEST FOR BIDS for Red Buchman Community Center Renovation RFB # 2021-004 The purpose of this Request for Bids (RFB) is to solicit bid applications which will enable the City of Gilbert to select the most qualified Applicant to provide a variety of skilled work associated with general oversight, maintenance and emergency repair of City of Gilbert’s water and/or wastewater systems. Project and Contract Period The project period shall be from November 2021 to April 30, 2022. Scope of Services Remove overhead garage door, close opening in wall including trim work, painting of entire west wall, installing two windows, insulation and install siding on exterior to match existing. See attached document for additional information on scope of services. Walk-through of area can be arranged by scheduling with City Hall. Post RFB City of Gilbert will post the RFB on the city webpage at: www.cityofgilbertiowa.org The RFP will remain posted through the Bid Application Due date. Bid Application due November 12, 2021. Bid applications must be submitted to the City of Gilbert, Iowa by 12:00 p.m. (local Iowa time) 11/12/21. Attempted submission of a completed application after stated due date and time will not be accepted Select Successful Applicant/Post Notice of Intent to Award November 16, 2021 Applicants will be notified of their standing beginning on November 16, 2021 through November 19, 2021. City of Gilbert contact Name: Sonia Arellano Sundberg Email: [EMAIL REDACTED] Phone: (515) 233-2670 ---PAGE BREAK--- Notes: Incomplete bid applications will not be reviewed for consideration. Application must include the following information: 1. Organization/Company name and address 2. Primary point of contact (name and phone number) 3. Quote per Scope of Services listed in RFB. If awarded: 1. Expenditure variance amounts are allowed up to a maximum of 5% of the approved budget amount. The Contractor shall submit a written justification and request for a budget amendment to the City prior to the obligation of an expense which will exceed the allowed 5% cumulative variance. The Contractor shall submit a written justification and request for a budget amendment when expenditures not previously approved are anticipated. ---PAGE BREAK--- Full Scope of Services Needed Red Buchman Community Room Renovation Garage door along west wall must be removed including all hardware. West wall must be closed in with insulation and drywall. Two windows approximately 30”x12” installed 2 feet from ceiling. Match trim along base of wall. Match cork/wood around northwest corner. Paint entire west wall to match existing color. Match outside siding in type and color, or paint to match existing colors. Garage door to be removed and hardware ---PAGE BREAK--- ---PAGE BREAK--- ---PAGE BREAK--- Example of color matching for siding ---PAGE BREAK--- X Application to Request for Bids for Water and/or Waste Water Affidavit Operator(s) RFB # 2021-004 Company/Organization: Company Address: Primary Contact Name: Email: Phone: Secondary Contact Name: Email: Phone: Quote per Scope of Services listed in RFB #2021-004 $ Notes/Comments: Signature: I have signed this document with the full understanding of the requested scope of services needed by the City of Gilbert. I understand an inquiry with the Iowa DNR will be completed to guarantee certification status. I also acknowledge a bid cannot be awarded until it has been approved by the Gilbert City Council.