← Back to Gilbert

Document Gilbert_doc_466e5eb376

Full Text

City of Gilbert 105 S.E. 2nd St. Gilbert, IA 50105 Phone: [PHONE REDACTED] Fax: 515.233.802 May 2021 FOR INSPECTIONS CONTACT: SAFE BUILDING @ [PHONE REDACTED] Building Permit Application New construction, addition, garage and projects over 1,000 square feet Complete ALL Information Requested and Include SITE PLAN & BUILDING PLAN Project Zoning: □ R1 □ R1A □ R2 □ R3 □ R4 □ C1 □ C2 □ C3 □ M1 □ P/I Project Project Square Project Valuation (Required) Note: This project valuation shall include total value of work, including materials and labor, for which the permit is being issued, including electrical, gas, mechanical, plumbing equipment, and permanent systems. If, in the opinion of the Building Official, the valuation is underestimated on the application, the final building permit valuation shall be set by the Building Official. Applicant is: Property Owner Tenant Contractor Architect Engineer Mailing If contractor, please provide owner/tenant If contractor, please provide State of Iowa Contractor Registration Subcontractors who will also work on this project: Plumbing Mechanical I hereby certify that I have read and examined this application and know the same to be true and correct. I have read the reverse of this page and understand that it is my responsibility to schedule required inspections. All provisions of laws and ordinances governing this type of work will be compiled with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction of the performance of construction. I, the undersigned, understand that I am responsible for correctly locating the property lines. Signature of Applicant Printed Name: *The final determination of value for calculating the permit fee will be made by the building official. FOR OFFICE USE Building Official Notes: Approved By Date: Permit ---PAGE BREAK--- IOWA ONE CALL 1-[PHONE REDACTED] or 811 provides contractors, homeowners, and others who may be excavating, digging or trenching with a single toll-free number to call for locating and marking underground facilities. Iowa law states that if you are excavating, including digging, you MUST call Iowa One Call at least 48 hours in advance (of your digging) in order to minimize the risk of damaging any type of underground facilities (electric, gas, telecommuting, cable television, water and sewer). The service is free, and so is the phone call. Call 1-[PHONE REDACTED] or 811. All work must conform to the applicable building code and/or City Ordinances. Work must not commence until all associated fees are paid and an approved building permit issued. A pre-construction conference with the building plan reviewer may be required prior to the issuance of the permit. When all requirements have been met, a permit will be issued. A permit is valid for 1 year and work must commence within 180 days of issuance. Required Inspections: (some circumstances may require additional inspections) 1 business day notice is required on all inspections. Prior to pouring concrete. Foundation……………………….. Prior to pouring concrete. Foundation Insulation………. Prior to backfill. Groundwork Plumbing……... Wet test required prior to pouring concrete, weather permitting. Plumbing………………………….. Prior to interior wall finish. Wet test required, weather permitting. Electrical…..………………….….. Temporary pole, prior to meter release. Prior to insulation and rough-in. Mechanical.……………………… Prior to insulation. Prior to permanent meter release. Prior to insulation. Insulation….……………………… Prior to drywall when prescriptive or trade-off compliance methods are used. Work must not be completed beyond the point indicated in each inspection without first obtaining the approval of the building inspector. Any portions that do not comply must be corrected and not covered or concealed until authorized. The building inspector can require construction to be removed if the appropriate inspections were not completed. Below are the required setbacks for each zoning district: R1 & R1A – Single Family Residential Front Yard – 25 feet Side Yard – 6 feet on each side Rear Yard – 25 feet (R1), 20 feet (R1A) Lot Coverage – 30% max (R1), 35% max (R1A) Height – shall not exceed 2.5 stories or 35 feet R2 – Two Family Residential Front Yard – 25 feet Side Yard – 6 feet on each side Rear Yard – 25 feet Lot Coverage – 40% max Height – shall not exceed 2.5 stories or 35 feet R3 – Multi-Family District Front Yard – 20 feet Side Yard – 10 feet on each side Rear Yard – 20 feet Lot Coverage – 50% max Height – shall not exceed 3 stories or 45 feet R4 – Multi-Family District Front Yard – 10 feet Side Yard – 7.5 feet on each side Rear Yard – 20 feet Lot Coverage – 50% max Height – shall not exceed 3 stories or 45 feet C1 – Commercial District No minimum yard requirements Height – shall not exceed 3 stories or 45 feet C2 – Arterial Commercial District Front Yard – no minimum established Side Yard – 5 feet on each side Rear Yard – no minimum established Height – shall not exceed 8 stories or 100 feet C3 – Mixed Use Commercial Front Yard – no minimum established Side Yard – 5 feet on each side Rear Yard – no minimum established