Full Text
CITY OF FONTANA Department of Engineering 8353 Sierra Avenue, Fontana CA 92335 Phone (909) 350-7610 ENGINEER PUBLIC IMPROVEMENT PLAN CHECK APPLICATION PROJECT INFORMATION MASTER CASE No. (MCN, TTM, TPM, ASP, DRP, BPC No.) Staff Use Only [EMAIL REDACTED] ENGINEERING PC No.: Company Name: Project Location & Specific Plan: Assessor's Parcel No & Address: Description of Project: LEGAL PROPERTY OWNER Contact Person: Phone: Mobile: Email: Contact Person: Company Name: Phone: Mobile: Email: Address: Address: Phone: Mobile: Email: APPLICANT Contact Person: Company Name: Address: REVISED 9/12/19 - AT/RG Page 1 of 4 ---PAGE BREAK--- OWNER / APPLICANT CERTIFICATION information is true and correct. Company Name: I certify that I am presently the legal owner of the above-described property or can act as an agent Address: on their behalf. Further, I acknowledge the filing of this application and certify that all above LANDSCAPE ARCHITECT Contact Person: Phone: Mobile: Email: Signature: Date: Print Name and Title: REVISED 9/12/19 - AT/RG Page 2 of 4 ---PAGE BREAK--- Provided: Quantity: 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 2 Sets 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set DEPARTMENT of ENGINEERING (INCOMPLETE APPLICATIONS WILL BE REJECTED) CITY OF FONTANA THIS FORM MUST BE SUBMITTED WITH FIRST PLAN CHECK Street cross sections at 25' minimum intervals for any work joining or overlaying existing pavement. (Sections to be part of street plans)…….(# of Sheets ) Street Light of Sheets ) Signing & Striping of Sheets Street of Sheets ) Traffic Signal of Sheets ) Sewer of Sheets ) Storm Drain of Sheets ) Quit Claim Deeds; Right-of-Way documents; Sewer and/or Storm Drainage Easements. Initials: 4th and subsequent plan check reviews will require additional plan check fees and will be based on Time & Material. Hydrology and Hydraulics Report and Calculations Construction Cost Estimate Exhibit Soils Report (Reference Only) Rough Grading and Erosion Control Plans (Reference Only) Approved Stamped Tentative Map (TM & PM) or Approved Stamped Site Plan (DRP, ASP) and Approved Stamped Utility Location Plan for fire hydrants, street lights, etc. Copy of the Approved Conditions of Approval Copy of Final Tract Map or Final Parcel Map (Reference Only) Copy of all adjacent or reference plans used in the design and/or referenced on plans. Copy of any submitted related required land documents such as: Lot Line Adjustments; REVISED 9/12/19 - AT/RG Page 3 of 4 ---PAGE BREAK--- IMPROVEMENT PLAN / TRAFFIC SIGNAL PLAN: PLAN CHECK FEES (Construction Cost Estimate) (Adjusted fee) (Percent) (Base Amount) $ 0 - $25,000 $0 $340 $ 25,001 - $50,000 $25,000 $1,590 $ 50,001 - $150,000 $50,000 $2,590 $ 150,001 - $250,000 $150,000 $6,325 $ 250,001 - $500,000 $250,000 $9,775 $ 500,001 - $1,000,000 $500,000 $16,960 $1,000,001 - Up $1,000,000 $25,590 HYDROLOGY AND HYDRAULICS PLAN CHECK FEES REVISION TO EXISTING CITY APPROVED PLANS: 151 & OVER ACRES ……………$1,000.00 + [$10.00 x No. of ACRE - x + (Construction Cost Estimate - Adjusted Fee) x (Percent) + (Base Amount) 5.00% 4.00% 3.75% 3.50% 3.00% 2.50% 2.00% PLAN CHECK CALCULATION FORM CITY OF FONTANA SEWER AREA STUDY REVIEW….$1,000.00 + [$10 x No. of ACRE SIGNING AND STRIPING PLAN………………...$400 x No. of Sheet TRAFFIC CONTROL AND DETOUR PLAN…….$400 x No. of Sheet SPECIFIC FOCUS TRAFFIC STUDY PARKING STUDY TRAFFIC STUDY GIS ARCHIVE FEE x No. of Sheet Public Improvement Revisions Review x No. of Sheet 0 - 150 ACRES + [$15.00 x No. of ACRE REVISED 9/12/19 - AT/RG Page 4 of 4 ---PAGE BREAK--- 1 STAFF USE ONLY ENGINEERING PC NO. CITY OF FONTANA ENGINEERING DEPARTMENT COST ESTIMATE - EXHIBIT DATE: DEVELOPER PROJECT ENGINEER TRACT MAP PHONE NO. PARCEL MAP NO. STREET IMPROVEMENTS UNIT ITEM QUANTITY UNIT COST AMOUNT 6" CURB & GUTTER _ L.F. 17.00 8" CURB & GUTTER L.F. 19.00 _ 8" THICK CROSS GUTTER S.F. 11.00 _ 4" SIDEWALK S.F. 7.00 _ ACCESS RAMP EA 5,000.00 _ DRIVEWAY APPROACHES S.F. 11.00 _ ASPHALT CONCRETE DIKES L.F. 11.00 _ FOG SEAL S.F. .10 IMPORTED EMBANKMENT C.Y. 10.00 _ PREPARATION OF SUBGRADE S.F. .50 _ *A.C. TON 150.00 _ *A.C. OVERLAY(0.20 THICKNESS) PER CITY STANDARD TON 150.00 _ **PCC CURB ONLY (MEDIAN) L.F. 16.00 _ ADJUST SEWER MANHOLE TO GRADE EA 500.00 _ ADJUST SEWER CLEAN OUT TO GRADE EA 300.00 _ ADJUST WATER VALVES TO GRADE EA 250.00 _ BARRICADES L.F. 40.00 _ 2 X 4 REDWOOD HEADER L.F. 5.00 _ *REMOVAL OF A.C. PAVEMENT S.F. .66 _ **REMOVAL OF P.C.C. CURB L.F. 6.00 _ *REMOVAL OF A.C. BERM L.F. 5.00 _ RETAINING WALL H=2 1/2 FT. OR LESS L.F. 40.00 BLOCK WALL H=6 FEET L.F. 50.00 AGGREGATE BASE TON 30.00 _ GUARD POSTS EA 70.00 _ GUARD PANEL (WOOD) L.F. 40.00 _ SAWCUT L.F. 3.50 _ REFLECTORS AND POSTS EA 100.00 _ STREET SIGNS EA 250.00 _ EA EA EA EA STREET IMPROVEMENT SUBTOTAL * A.C. ASPHALTIC CONCRETE P.C.C. PORTLAND CONCRETE CEMENT ---PAGE BREAK--- 2 STORM DRAIN IMPROVEMENTS UNIT ITEM QUANTITY UNIT COST AMOUNT * 18" RCP L.F. 90.00 * 24" RCP L.F. 110.00 * 30" RCP L.F. 250.00 * 36" RCP L.F. 250.00 * 42” RCP L.F. 250.00 * 48" RCP L.F. 260.00 * 54" RCP L.F. 280.00 * 60" RCP L.F. 300.00 * 66” RCP L.F. 320.00 * 78” RCP L.F. 340.00 * 24” CMP L.F. 90.00 * 60” CMP L.F. 320.00 CATCH BASIN/CURB INLET: W=7 EA 4,000.00 W=10 EA 4,500.00 W=14 EA 6,000.00 W=21 EA 11,000.00 W=28 EA 14,000.00 JUNCTION STRUCTURE EA 3,200.00 TRAFFIC TYPE JUNCTION STRUCTURE EA 2,800.00 DISCHARGE STRUCTURE EA 2,800.00 MANHOLES EA 2,500.00 LOCAL DEPRESSION EA 1,250.00 GRATE INLET STRUCTURE EA 2,100.00 EA EA EA STORM DRAIN IMPROVEMENT SUBTOTAL * REINFORCED CONCRETE PIPE SANITARY SEWER IMPROVEMENTS UNIT ITEM QUANTITY UNIT COST AMOUNT MANHOLES 60" DIAMETER EA 4,500.00 MANHOLES 48" DIAMETER EA 4,000.00 DROP MANHOLES EA 4,500.00 WYES EA 100.00 CLEANOUTS EA 600.00 REMODELING OF EXISTING MANHOLE EA 950.00 4" VCP L.F. 50.00 6" VCP L.F. 60.00 8" VCP L.F. 70.00 10" VCP L.F. 80.00 12" VCP L.F. 90.00 15" VCP L.F. 100.00 L.F. L.F. SANITARY SEWER IMPROVEMENT SUBTOTAL VITRIFIED CLAY PIPE ---PAGE BREAK--- 3 TRAFFIC SIGNALS/SIGN/STRIPING UNIT ITEM QUANTITY UNIT COST AMOUNT TRAFFIC SIGNAL MODIFICATION: ONE CORNER L.S. 75,000.00 _ TWO CORNERS L.S. 100,000.00 _ TRAFFIC SIGNAL NEW L.S. 250,000.00 _ PAINT TRAFFIC STRIPE(1 COAT) L.F. 2.40 _ PAINT TRAFFIC STRIPE(2 COATS) L.F. .65 _ PEDESTRIAN CROSSWALK STRIPING L.F. .65 _ PAVEMENT MARKER (NON REFLECTIVE) EA 2.50 PAVEMENT MARKER (REFLECTIVE) EA 4.00 _ REFLECTORS AND POSTS EA 100.00 _ STREET SIGNS EA 250.00 _ EA EA TRAFFIC SIGNAL/SIGNS/STRIPING SUBTOTAL CFD LANDSCAPE IMPROVEMENTS (BONDING PURPOSES ONLY) AREA LANDSCAPED S.F. $12.00 _ CENTER MEDIAN S.F. $12.00 _ LANDSCAPING IMPROVEMENTS SUBTOTAL SUBTOTALS: STREET IMPROVEMENT STORM DRAIN IMPROVEMENTS SANITARY SEWER IMPROVEMENTS TRAFFIC SIGNAL/SIGNS/STRIPING IMPROVEMENT SUBTOTAL (*USE THIS TOTAL FOR PLAN CHECK & PERMITTING PURPOSES*) CFD LANDSCAPE IMPROVEMENTS SUBDIVISION MONUMENT GUARANTEE $1,200 + $50/LOT STREET LIGHTS @ $5,000 CUCAMONGA COUNTY WATER DISTRICT IMPROVEMENT SUBTOTAL.... ADD BONDING ---PAGE BREAK--- 4 APPROVED PUBLIC IMPROVEMENT PLANS: STREET IMP. DWG. STREET LIGHT DWG. SEWER IMP. DWG. STORM DRAIN IMP. DWG. NO. TRAFFIC SIGNAL DWG. SIGNING & STRIPING DWG.