← Back to Fernley

Document Fernley_doc_02a6417e2c

Full Text

♦ 595 Silver Lace Boulevard ♦ Fax: [PHONE REDACTED] ♦ Fernley, NV 89408 ♦ Building Division: [PHONE REDACTED] ♦ Planning Division: [PHONE REDACTED] ♦Engineering Division: [PHONE REDACTED] Robert “Terry” Gilbert, AICP Director DEMOLITI0N Service connections shall be disconnected and capped Owner of property: Public Works: SPPC: SWG: Fire Dept: 1. Asbestos Abatement Report. 2. Construction documents and a schedule for demolition must be submitted, specify on a plot plan all buildings to be demolished, specify dimensions from property lines to proposed demolished buildings, specify dimensions from proposed demolished buildings to existing buildings. 3. Where a structure has been demolished or removed, the vacant lot shall be filled and maintained to the existing grade. 4. Provisions shall be made to prevent the accumulation of water or damage to any foundations on the premises or the adjoining property. 5. Adjoining public and private property shall be protected from damage during demolition. 6. Construction materials and equipment shall not be placed or stored so as to obstruct any access to public or private property or fire hydrant. 7. A fire extinguisher shall be on job site. 8. A water supply shall be on jobsite for dust control, and fire protection. 9. Sanitary facilities shall be provided during demolition. 10. Pedestrians shall be protected during demolition. COMMUNITY DEVELOPMENT DEPARTMENT Comprehensive Planning Zoning Development Review Building and Safety