← Back to Farmingtonnm Gov

Document farmingtonnm_gov_doc_8111d62227

Full Text

Farmington MPO Rec Num: 4 CN: F100090 Lead Agency: City of Aztec Est. Letting: Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Est. Proj. Cost: $3,500,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Capacity Proj Remarks: Added to FFY2014-2019 TIP through Amendment #5 (PC approval on 3-20-14), TIP Modification #5 moves the funding from FFY 2015 to 2014. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100090 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,990,400 $2,990,400 $3,500,000 $3,500,000 Totals $0 $0 State Match $509,600 $509,600 Local Match 01 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 3 CN: F100091 Lead Agency: City of Aztec Est. Letting: Proj East Arterial Route Phase II Fr: Current end of Legion Rd To: NM 173 Project Desc.: Construct remaining road section from end of Phase I to NM 173 including a detached multi-use pedestrian path. Utility work consisting of a 10- inch water line will be constructed for the entire length of the project. Est. Proj. Cost: $7,319,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Capacity Proj Remarks: Legion Rd added to the FFY2014-2019 TIP through Amendment #4 (approved January 16,2014), Removed Legion Rd from TIP per amendment #6 to FFY 2014-2019 TIP on 8.21.14 substituted Phase II of East Arterial Route. 2.13.15 reworded scope of work to include pedestrian path and utility work (10" water line). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100091 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,990,400 $2,990,400 $7,319,750 $3,819,750 $3,500,000 Totals $0 $0 State Match $509,600 $509,600 Local Match $3,819,750 $3,819,750 Severance Tax 15 17 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 42 CN: F100100 Lead Agency: City of Farmington Est. Letting: Proj East Pinon Hills Boulevard Extension Phase I Fr: NM 516 (E.Main) To: Hubbard Project Desc.: Phase I: Full rebuild of the Intersection of Piñon Hills and NM 516; Extension of Piñon Hills Blvd to include earthwork, asphalt, street lighting, drainage improvements and signalization upgrades. Future Phases II & III are outside of the current cycle. Est. Proj. Cost: $3,950,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Capacity Proj Remarks: Amendment #9 (Dec 1, 2014) includes describing Phase II ($14,250,000 - Hubbard to CR 3000 & Phase III ($8,250,000 - CR 3000 to CR 390) to this project as future phases outside of 2014-2019 TIP cycle. This amendment #9 also adds $250,000 for FY2019 for Final Design & PS&E Certifications. Deleted $250,000 CMAQ Flex from FFY2019 moved to a new PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100100 Construction ■ Right-of-way ■ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,511,936 $341,760 $2,853,696 TCSP $48,000 $48,000 $3,700,000 $3,300,000 $400,000 Totals $486,304 $428,064 $58,240 State Match $12,000 $12,000 $0 Local Match $300,000 $300,000 Local Non-Match 01 01 01 16 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 42.1 CN: F100101 Lead Agency: City of Farmington Est. Letting: Proj East Pinon Hills Blvd Extension Phase II Fr: Hubbard To: CR 3000 Project Desc.: Includes earthwork, asphalt, intersection lighting, bridges over the Animas River and oxbow, drainage improvements, environmental mitigation. Est. Proj. Cost: $13,265,454 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Capacity Proj Remarks: Added Phase II to the TIP with $250,000 to CMAQ Flex in FFY 2017, added new scope for Phase II 2.13.15. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100101 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 CMAQ-Flex $213,600 $213,600 $250,000 $250,000 Totals $0 $0 State Match $36,400 $36,400 Local Match 15 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 101.1 CN: F100110 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase IV Fr: MP 57.8 To: MP 60.2 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $15,600,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2.4 Category: Capacity Proj Remarks: Amended in the FFY 2014-2019 TIP through Amendment #2 (approved on Sep 19,2013). Split ROW and Construction funding as part of Modification #4 (Feb 10, 2014). Decreases NHPP by $4,440,034 in FY 2016 and STP by $2,655,239 also in FY 2016 as part of Amendment #7 to FFY2014-20190 TIP 9.18.14. TIP Modification 11 moves $3,018,546 from PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100110 Construction ■ Right-of-way ■ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 57.8 Rt 2 BMP: 0 Rt 1 EMP: 60.2 Rt 2 BMP: 0 NHPP $10,563,443 $2,171,389 $12,734,832 NHPP $213,600 $299,040 $512,640 NHPP $81,168 $81,168 $15,600,000 $250,000 $12,808,580 $2,541,420 Totals $2,271,360 $36,400 $1,864,929 $370,031 State Match $0 $0 $0 $0 Local Match 03 03 16 16 17 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 101.2 CN: F100112 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase V Fr: MP 56 To: MP 58 Project Desc.: CP-91 Widen to 6 Lanes Est. Proj. Cost: $17,655,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). Brings total FY 2015 total to $974,000 and changes from NHPP to STPF per amendment #7 to FFY2014-2019 TIP. TIP Modification #14, added CP-91 language to Scope of PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100112 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 56 Rt 2 BMP: 0 Rt 1 EMP: 58 Rt 2 BMP: 0 NHPP $4,240,116 $10,071,084 $4,240,116 STP-Flex $832,186 $832,186 $5,936,683 $974,000 $4,962,682 $11,787,317 Totals $864,381 $141,814 $722,566 $1,716,233 State Match $0 $0 $0 $0 Local Match 03 03 15 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 101.3 CN: F100113 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase VI Fr: MP 54 To: MP 56 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $9,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100113 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 54 Rt 2 BMP: 0 Rt 1 EMP: 56 Rt 2 BMP: 0 NHPP $6,565,803 $0 STP-Sm Urb $1,123,797 $0 $0 $9,000,000 Totals $0 $1,310,400 State Match $0 $0 Local Match 03 03 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 104 CN: F100114 Lead Agency: NMDOT D-5 Est. Letting: Proj Bridge Preservation: US 550 #9178 & #9179 Fr: 169.5 To: 169.5 Project Desc.: Bridge Maintenance and Preservation, resurface bridge. Est. Proj. Cost: $260,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0550 Length: 0 Category: Maintenance Remarks: Added to TIP as part of amendment #7 (FFY2014-2019) $260,000 NHPP funding for FY2017. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100114 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 169.5 Rt 2 BMP: 0 Rt 1 EMP: 169.5 Rt 2 BMP: 0 NHPP $222,144 $222,144 $260,000 $260,000 Totals $37,856 $37,856 State Match $0 $0 Local Match 05 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 105 CN: F100115 Lead Agency: NMDOT D-5 Est. Letting: Proj Bridge Preservation: US 550 8243 & 8244 & US-64 7526 Fr: To: Project Desc.: Bridge preservation mainenance project ashfalt work at mile posts 151.09, 150.85 & 35.60 Est. Proj. Cost: $933,900 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0550 Length: 0 Category: Hwy & Brg Pres Remarks: Dec 1, 2014 adds F100115 to TIP $933,900 NHPP funds with a State match. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100115 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 US0550 Rt 1 BMP 150.85 Rt 2 BMP: 151.09 Rt 1 EMP: 150.85 Rt 2 BMP: 151.09 NHPP $797,924 $797,924 $933,900 $933,900 Totals $135,976 $135,976 State Match $0 $0 Local Match 14 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 41.1 CN: F100130 Lead Agency: City of Farmington Est. Letting: Proj 20th Street Phase I Fr: Clayton To: Fairview Project Desc.: Construct sidewalks to North Side of 20th Street Est. Proj. Cost: $249,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Bike/Ped Remarks: Changed and split an existing TPE project into two new phases using TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). Added $28,143 in local non match funds as part of Amendment #7 to FY2014-2019 TIP. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100130 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $188,700 $188,700 $277,143 $28,143 $249,000 Totals $0 $0 State Match $32,157 $32,157 Local Match $28,143 $28,143 Local Non-Match $28,143 $28,143 Local Non-Match 15 28 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 41.2 CN: F100131 Lead Agency: City of Farmington Est. Letting: Proj 20th Street Phase 2 Fr: Fairview To: Sullivan Project Desc.: Pedestrian Facilities, including sidewalks Est. Proj. Cost: $225,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Bike/Ped Remarks: Changed an existing TPE project into two new phases using TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14, 2013) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100131 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $130,782 $130,782 $225,000 $225,000 Totals $0 $0 State Match $22,287 $22,287 Local Match $71,931 $71,931 Local Non-Match 15 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 102 CN: F100170 Lead Agency: NMDOT D-5 Est. Letting: Proj NM 173 Fr: MP 2.0 To: NM 575 Project Desc.: Safety Improvements Est. Proj. Cost: $2,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 NM0173 Length: 1.5 Category: Safety Remarks: Modification #10 moved FY2015 HSIP Safety Funds to FY2016 in the amount of $1M.Amendment #8 (Oct 8 2014) adds an additional $110,000 to FY2015 in STPF funds. (Dec 1, 2014) TIP Amendment #9 amends the termini description from MP 2.0 to NM 575. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100170 Construction ■ Right-of-way ■ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 2 Rt 2 BMP: 0 Rt 1 EMP: 3.5 Rt 2 BMP: 0 Safety (HSIP) $463,200 $463,200 Safety (HSIP) $463,200 $463,200 Safety (HSIP) $926,400 $926,400 STP-Sm Urb $93,984 $93,984 $2,110,000 $1,000,000 $110,000 $1,000,000 Totals $147,200 $73,600 $0 $73,600 State Match $16,016 $0 $16,016 $0 Local Match 15 16 21 15 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 43 CN: F100200 Lead Agency: City of Farmington Est. Letting: Proj San Juan Blvd/Scott Ave Intersection Fr: To: Project Desc.: Traffic signal reconstruction Est. Proj. Cost: $375,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Safety Remarks: Added this safety project to the Regionally Significant List from the Unfunded List as part of Amendment # 1 to FFY 2014-2019 TIP (Approved June 20th 2013. Split funding: $20,000 for PE and $355,000 for Construction as part of Modification #4 (Feb 10, 2014). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100200 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 Safety (HSIP) $18,528 $18,528 Safety (HSIP) $328,872 $328,872 $375,000 $20,000 $355,000 Totals $27,600 $1,472 $26,128 State Match $0 $0 $0 Local Match 15 21 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 81 CN: F100210 Lead Agency: County of San Juan Est. Letting: Proj CR 350/ CR 390 Intersection Fr: 500' South of intersection on CR 350 To: 500' North of Intersection on CR 350 Project Desc.: Preliminary Engineering, ROW acquisition, and construct improvements CR 350/CR390 intersection- 500ft North and South of intersection on CR 350, 500ft west of intersection on CR 390. Est. Proj. Cost: $650,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 Length: 0 Category: Safety Remarks: Revised work description, funding, and fiscal years as part of Modification #3 (Dec 5, 2013). 12.02.14 updated project termini description as part of TIP modification #12 FFY2014-19. Modification #14 moves $35K FY2015 ROW funds to FY2016 to Safety Funds. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100210 Construction ■ Right-of-way ■ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 Safety (HSIP) $106,536 $106,536 Safety (HSIP) $495,624 $495,624 $650,000 $115,000 $535,000 Totals $47,840 $8,464 $39,376 State Match $0 $0 $0 Local Match 15 21 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 44 CN: F100220 Lead Agency: City of Farmington Est. Letting: Proj Southside River Road River Trail Fr: Pinon Hills Blvd Ext To: 0.6 Miles west Project Desc.: Construct River Trail Est. Proj. Cost: $93,586 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Bike/Ped Remarks: Added this TAP project as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14, 2014) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100220 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Rural $46,586 $46,586 $93,587 $39,062 $54,525 Totals $0 $0 State Match $7,939 $7,939 Local Match $39,062 $39,062 Local Non-Match 15 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 103 CN: F100221 Lead Agency: NMDOT D-5 Est. Letting: Proj NM 371/N36 Fr: NA To: NA Project Desc.: Install beacon flashers/advanced warning signal system at intersection of NM371 and N36 Est. Proj. Cost: $100,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 NM0371 Length: 0 Category: Safety Remarks: Added to TIP as part of amendment #7 (FFY2014-2019) $100,000 State Capital Outlay funding for FY2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100221 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 $100,000 $100,000 Totals $100,000 $100,000 State Capital Outlay 01 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 21.1 CN: F100230 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase II Fr: Existing Trail To: .324 Miles East Project Desc.: Construct river trail Est. Proj. Cost: $199,636 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: ROW, Envt, Design previously completed under CN 0002(091). Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100230 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $39,568 $39,568 TAP-Sm Urb $119,012 $119,012 $199,636 $46,311 $153,325 Totals $0 $0 $0 State Match $27,024 $6,743 $20,281 Local Match $14,032 $14,032 Local Non-Match 28 15 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 21.2 CN: F100231 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase III Fr: End of Phase II To: .495 Miles East Project Desc.: Construct River Trail Est. Proj. Cost: $203,050 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100231 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $158,580 $158,580 $203,050 $203,050 Totals $0 $0 State Match $27,024 $27,024 Local Match $17,446 $17,446 Local Non-Match 28 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 2 CN: F100240 Lead Agency: City of Aztec Est. Letting: Proj Animas River Trail Fr: Hampton Arroyo To: 320' north of US 550/NM 516 intersection Project Desc.: Construction of a pedestrian trail and transit stop providing connectivity to Aztec Ruins National Monument Est. Proj. Cost: $547,805 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Bike/Ped Remarks: Orignially added to FFY2014-2019 TIP through Amendment #3 on Nov 14, 2013 PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100240 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 FTA Transit in the Parks $319,900 $319,900 $547,805 $547,805 Totals $0 $0 State Match $0 $0 Local Match $227,905 $227,905 Local Non-Match 15 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 1 CN: F100250 Lead Agency: City of Aztec Est. Letting: Proj Animas River Trail Fr: Aztec Ruins To: Martinez Lane Project Desc.: Construct bicycle/pedestrian trail from Aztec Ruins (Ruins Rd) to pedestrian bridge to Martinez Lane Est. Proj. Cost: $350,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Bike/Ped Remarks: Orignially added to FFY2014-2019 TIP through Amendment #2 for $806,911 on Sept 19, 2013. Modification #4 to the FFY 2014-2019 TIP (Feb 10, 2014) reduced funding to $350,000. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100250 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 $350,000 $350,000 Totals $350,000 $350,000 Local Other 28 Amended February 26, 2015 ---PAGE BREAK--- Farmington MPO Rec Num: 201 CN: TF00001 Lead Agency: City of Farmington Est. Letting: Proj Red Apple Transit Capital/Operating Fr: N/A To: N/A Project Desc.: Annual operating costs and purchase of one cutaway bus Est. Proj. Cost: $1,289,587 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Transit Remarks: PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: TF000001 Construction □ Right-of-way □ Prel. Engr. □ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other ■ TIP Informational Years TIP Amendment Pending?□ Exempt Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 FTA 5307 (Sm Urb Cap) $63,500 $63,500 FTA 5307 (Sm Urb Oper) $605,106 $605,106 $1,289,587 $1,289,587 Totals $0 $0 State Match $620,981 $620,981 Local Match 23 23 Amended February 26, 2015