← Back to Farmingtonnm Gov

Document farmingtonnm_gov_doc_313a220a1b

Full Text

City of Farmington NPDES Phase II MS4 Annual Report Reporting Period: July 1, 2012 to June 30, 2013 October 1, 2013 City of Farmington Public Works Department 800 Municipal Drive Farmington, New Mexico 87401 ---PAGE BREAK--- ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page i EXECUTIVE SUMMARY The National Pollutant Discharge Elimination System (NPDES) Phase II rule, which was promulgated on December 8, 1999, regulated small MS4s serving a population of less than 100,000 people in urbanized areas. The final rule requires that all MS4s located within urbanized areas as defined by the Bureau of the Census automatically comply with the Phase II Stormwater regulations by developing and implementing a Stormwater Management Program. The Program must reduce the discharge of pollutants to the Maximum Extent Practicable (MEP), protect water quality, and satisfy the appropriate water quality requirements of the Clean Water Act (CWA). The Program also requires the development of a Stormwater Management Program (SWMP) Plan that is comprised of the following six minimum control measures: 1. Public Education and Outreach, 2. Public Participation/Involvement, 3. Illicit Discharge Detection and Elimination, 4. Construction Site Stormwater Runoff Control, 5. Post-Construction Stormwater Management in New Development and Redevelopment, and 6. Pollution Prevention/Good Housekeeping for Municipal Operations. A significant portion of the City of Farmington, New Mexico, met the definition of an urbanized area in the 2000 Census (http://www.census.gov). As a result, the City of Farmington is required to meet the Phase II Stormwater regulations. The 1999 NPDES Phase II rule required that the City of Farmington develop a SWMP Plan and submit a draft Notice of Intent (NOI) to the United States Environmental Protection Agency (USEPA) by March 10, 2003. The City of Farmington submitted a draft NOI to apply for coverage under the General Permit for Discharges from Small MS4s (Permit No. NMR040000). The City also developed the original City of Farmington Stormwater Management Plan that was subsequently approved by Farmington City Council in March 2003. The Final NPDES Phase II rule was signed and issued on September 29, 2006, and the permit became effective on January 1, 2007 and expires on June 30, 2012. As municipalities are currently awaiting the new NPDES permit, the current permit will be extended until such time as the new permit is available. During February and March 2007, the City of Farmington re-evaluated and updated Stormwater Management Plan. The plan will once again be re-evaluated and updated when the new permit is released. It is expected to be issued in late 2012 or early 2013. The permit requires that the City of Farmington submit an MS4 Annual Report for the previous reporting period (July 1st through June 30th) by October 1st of each year for the life of the permit (2008 to 2012). The annual report includes the following:  The status of compliance with permit conditions, an assessment of the appropriateness of the identified best management practices, progress towards achieving the statutory goal of reducing the discharge of pollutants to the MEP, and the measurable goals for each of the minimum control measures;  Results of information collected and analyzed, if any, during the reporting period, including monitoring data used to assess the success of the program at reducing the discharge of pollutants to the MEP; ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page ii  A summary of the stormwater activities the City of Farmington plans to undertake during the next reporting cycle (including an implementation schedule);  Proposed changes to the SWMP Plan, including changes to any Best Management Practices (BMPs) or any identified measurable goals that apply to the program elements;  Description and schedule for implementation of additional BMPs that may be necessary, based on new information or monitoring results, to ensure compliance with applicable Total Maximum Daily Loads (TMDL);  Notice if the City of Farmington is relying on another government entity to satisfy some of the permit obligations; and  A brief summary of any issues raised by the public on the draft Annual Report and any proposed changes to the SWMP Plan, along with the City of Farmington’s responses to the public comments. The permit requires a public comment period for at least thirty (30) days prior to the submission of the report. The City of Farmington provided a review and comment opportunity. Public notices for the review and comment period were published in the Farmington Daily Times on Sunday, September 5th and 12th. All comments received were considered and addressed before the annual report was finalized. The final MS4 Annual Report was submitted to the following authorities: U.S. EPA, Region 6 Compliance Assurance and Enforcement Division Water Enforcement Branch (6EN-WC) 1445 Ross Avenue Dallas, TX 75202-2733 Program Manager Point Source Regulations Section Surface Water Quality Bureau New Mexico Environment Department P.O. Box 5469 Santa Fe, NM 87502 ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page iii TABLE OF CONTENTS EXECUTIVE SUMMARY i LIST OF FIGURES vi LIST OF TABLES vi LIST OF APPENDICES vi LIST OF ACRONYMS vii MS4 ANNUAL 1 A. PERMITTEE INFORMATION 1 B. REPORTING PERIOD July 1, 2012 to June 30, 2013 1 C. PROGRAM AREAS 1 D. CERTIFICATION 1 1. PUBLIC EDUCATION AND 3 1.1. Implementation Status 3 1.2. Overall Compliance with Permit Conditions 3 1.3. Results of Information Collected and Analyzed During the Reporting Period 3 1.3.1. Stormwater Training and Outreach – Residential Focus 3 1.3.2. Stormwater Training and Outreach – Construction Focus 4 1.3.3. City of Farmington 6 1.3.4. Initiate Partnerships with Interested Groups and Organizations 6 1.4. Activities Planned for the Next Reporting Cycle 6 1.5. Proposed Changes 6 1.6. Permit 7 1.7. Inspections and Formal Enforcement Actions 7 1.8. Public Access, Review, and Comment Provisions 7 2. PUBLIC INVOLVEMENT/PARTICIPATION 12 2.1. Implementation Status 12 2.2. Overall Compliance with Permit Conditions 12 2.3. Results of Information Collected and Analyzed During the Reporting Period 12 2.3.1. Code Compliance Hot Line 12 2.3.2. Farmington Clean & Beautiful 12 2.3.3. Household Non-Hazardous Waste Program 12 2.3.4. Household Hazardous Waste Program 13 2.3.5. Xeriscape Demonstration Garden Improvements 13 2.3.6. Regional Forums on Climate Change and Water 13 2.3.7. Recycling 13 2.3.8. Storm Drain Labeling 14 2.3.9. City of Farmington 14 2.4. Activities Planned for the Next Reporting Cycle 14 2.5. Proposed Changes 14 2.6. Permit 14 2.7. Inspections and Formal Enforcement Actions 14 2.8. Public Access, Review, and Comment Provisions 14 3. ILLICIT DISCHARGE DETECTION AND ELIMINATION 19 3.1. Implementation Status 19 3.2. Overall Compliance with Permit Conditions 19 ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page iv 3.3. Results of Information Collected and Analyzed During the Reporting Period 19 3.3.1. Stormwater Outfall Sampling 19 3.3.2. Dry Weather Outfall Inspections 25 3.3.3. Camera Inspection and Cleaning Program 25 3.3.4. Illicit Discharge Ordinance 25 3.3.5. Storm Drain System Map and Master Drainage Study 26 3.3.6. Code Compliance Hotline 26 3.4. Activities Planned for the Next Reporting Cycle 26 3.5. Proposed Changes 27 3.6. Permit 27 3.7. Inspections and Formal Enforcement Actions 27 3.8. Public Access, Review, and Comment Provisions 27 4. CONSTRUCTION SITE STORMWATER RUNOFF 33 4.1. Implementation Status 33 4.2. Overall Compliance with Permit Conditions 33 4.3. Results of Information Collected and Analyzed During the Reporting Period 33 4.3.1. Erosion and Sediment Control Ordinance 33 4.3.2. Stormwater Construction-related Training for City Staff 33 4.3.3. Stormwater Program Staffing 34 4.3.4. Stormwater Construction Guidance 34 4.3.5. Stormwater Construction Education & Outreach 34 4.4. Activities Planned for the Next Reporting Cycle 35 4.5. Proposed Changes 35 4.6. Permit 35 4.7. Inspections and Formal Enforcement Actions 35 4.8. Public Access, Review, and Comment Provisions 35 5. POST-CONSTRUCTION STORMWATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT 39 5.1. Implementation Status 39 5.2. Overall Compliance with Permit Conditions 39 5.3. Results of Information Collected and Analyzed During the Reporting Period 39 5.3.1. Post-Construction Stormwater Runoff Control Ordinance 39 5.3.2. Stormwater Program Staffing 39 5.3.3. Stormwater Construction Guidance 39 5.3.4. Stormwater Construction Education & Outreach 40 5.3.5. Master Drainage Study 40 5.4. Activities Planned for the Next Reporting Cycle 40 5.5. Proposed Changes 41 5.6. Permit 41 5.7. Inspections and Formal Enforcement Actions 41 5.8. Public Access, Review, and Comment Provisions 41 6. POLLUTION PREVENTION/GOOD HOUSEKEEPING FOR MUNICIPAL OPERATIONS 45 6.1. Implementation Status 45 6.2. Overall Compliance with Permit Conditions 45 6.3. Results of Information Collected and Analyzed During the Reporting Period 45 ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page v 6.3.1. Street Sweeping 45 6.3.2. Storm Drain Cleaning 45 6.3.3. Dust Abatement Applications to Unpaved Roads 46 6.3.4. Municipal Operations Center Sampling and Operations Review 46 6.3.5. Stormwater Training for Municipal Employees 47 6.4. Activities Planned for the Next Reporting Cycle 47 6.5. Proposed Changes 47 6.6. Permit 47 6.7. Inspections and Formal Enforcement Actions 47 6.8. Public Access, Review, and Comment Provisions 47 ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page vi LIST OF FIGURES Figure 1 - Updated Map of the City of Farmington 2 Figure 1-1 2012 Home Show Booth 5 Figure 3-1 Stormwater Sampling Locations – Year 5 21 LIST OF TABLES Table 1-1 Public Education and Outreach Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes 8 Table 2-1 Household Non-Hazardous Wastes Collected 13 Table 2-2 Household Hazardous Wastes Collected 13 Table 2-3 Public Involvement/Participation Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes 15 Table 3-1 Sampling Parameters, Methods, and General Benchmarks 23 Table 3-2 Camera Inspection and Cleaning (July 2011 – June 2012) 25 Table 3-3 Illicit Discharge Detection and Elimination Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes 29 Table 4-1 Construction-Related Training Workshops 33 Table 4-2 Construction Site Stormwater Runoff Control Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes 36 Table 5-1 Post-Construction Stormwater Management in New Development and Redevelopment Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes 42 Table 6-1 Street Sweeping at Municipal Parking Lots 45 Table 6-2 Pollution Prevention/Good Housekeeping Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes 48 LIST OF APPENDICES Appendix A Published Legal Notices and Announcements……………………………………….…..61 Appendix B Example Educational Appendix C Outfall Sampling Results ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page vii LIST OF ACRONYMS AES Animas Environmental Services, LLC AWP Animas Watershed Project BMP Best Management Practice COD Chemical Oxygen Demand COF City of Farmington CWA Clean Water Act DO Dissolved Oxygen FY Fiscal Year (City of Farmington’s fiscal year is July 1st – June 30th.) MEP Maximum Extent Practicable GIS Geographic Information System MOC City of Farmington’s Municipal Operations Center MS4 Municipal Separate Storm Sewer System MSGP Multi-Sector General Permit for Industrial Activities NOI Notice of Intent NPDES National Pollutant Discharge Elimination System NSPE National Society of Professional Engineers PRCA City of Farmington Parks, Recreation, and Cultural Affairs SJWG San Juan Watershed Group SWMP Stormwater Management Program TDS Total Dissolved Solids TKN Total Kjeldahl Nitrogen TMDL Total Maximum Daily Load TSS Total Suspended Solids USEPA United States Environmental Protection Agency ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page viii This page left intentionally blank. ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 1 MS4 ANNUAL REPORT Check box if this is a new name, address, etc. A. PERMITTEE INFORMATION Permit Number: NMR040000 Permittee: City of Farmington Mailing Address: 800 Municipal Drive City, State and Zip Code: Farmington, NM 87401 Phone Number: (505) 599-1102 Have any areas been added to the MS4 due to annexation or other legal means? No. An updated map is provided in Figure 1. B. REPORTING PERIOD July 1, 2012 to June 30, 2013 C. PROGRAM AREAS Program area updates during this reporting period for the City of Farmington’s Stormwater Management Plan are provided in the following attached sections: Section 1 – Public Education and Outreach Section 2 – Public Participation/Involvement Section 3 – Illicit Discharge Detection and Elimination Section 4 – Construction Site Stormwater Runoff Control Section 5 – Post-Construction Stormwater Management in New Development and Redevelopment Section 6 – Pollution Prevention/Good Housekeeping for Municipal Operations D. CERTIFICATION “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” Signature of Permittee (legally responsible person) Date Signed Jeffrey J. Smaka, P.E., Director, Public Works, City of Farmington Name & Titled (printed) Prepared By Date Signed Ryan L. Gladden, P.E., CFM, Project Engineer, City of Farmington Name & Titled (printed) ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 2 Figure 1 - Updated Map of the City of Farmington FLROA VISTA lies approximately 7 miles east of Farmington. Kirtland lies approximately 9 miles west of Farmington. North ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 3 1. PUBLIC EDUCATION AND OUTREACH 1.1. Implementation Status The City of Farmington’s Stormwater Management Program (SWMP) Plan contains all the measurable goals for the Public Education and Outreach program area that were planned during the five-year permit period (2007 through 2012). However, the focus of this annual Municipal Separate Storm Sewer Systems (MS4) Annual Report is the status of those goals planned during this reporting period (July 1, 2012 to June 30, 2013), a summary of goals planned for the next reporting period (July 1, 2013 to June 30, 2014), and any changes proposed to the goals in the SWMP Plan. Table 1-1 summarizes the status of the Public Education and Outreach goals planned during this reporting period as well as the status on any goals where work has already begun in preparation for future deliverables. 1.2. Overall Compliance with Permit Conditions The City of Farmington worked to complete the goals planned during this reporting period for Public Education and Outreach program area. Educational information and booths were offered to the residential community and construction industry. The City’s website is actively reviewed to ensure the stormwater information provided is accurate and up to date. During the reporting cycle changes were made to the website as needed to provide storm water information. More information can be found in section 1.3.3 of this report. The City continues its active participation and partnerships with groups in the region and is always interested in partnerships with new groups and organizations. Employees attended regular meetings held by Animas Watershed Group and San Juan Watershed Group. More information can be found in section 1.3.4 of this report. The following sections provide information collected and analyzed during this reporting period. 1.3. Results of Information Collected and Analyzed During the Reporting Period The following sections provide information collected and analyzed during this reporting period. Some historical information has been left in from previous reports. 1.3.1. Stormwater Training and Outreach – Residential Focus Public Meetings and Comment Periods The public comment period on the MS4 report was held from 8/26/12 to 9/26/12 and three notices were included in the Farmington Daily Times on Sunday August 26th, Monday August 27th, and Sunday September 2nd. A public meeting was not held in this reporting year. As is consistent with the NPDES permit requirements, there has been no significant interest in public comment periods to justify a public meeting. In the case that the city does see a significant interest from the public during the commenting periods or in any time during the following year regarding the SWMP, MS4 report, or other stormwater quality issues, the city will plan for a public meeting. The last stormwater public meeting held, in November of 2009, had one attendee despite radio announcements, multiple postings in the daily times, and numerous flyers. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 4 Residential Training Workshops No residential training workshops were held this reporting cycle. Residential Promotions The City of Farmington promoted several stormwater educational activities during this reporting period. Promotions are summarized below and examples are provided in Appendix B. ▪ Farmington Clean & Beautiful – The city held its Adopt a Highway and Refrigerator day programs, as well as the waste collection days to reach out to citizens to keep the city clean. See section 2.3.2 for more information. ▪ City Buses. The City of Farmington operates the Red Apple Transit within the city and has routes to the City of Aztec and the City of Bloomfield. Two of the nine buses have placards on the back that remind the community that stormwater is not treated and to keep pollutants out of the storm drains. ▪ Brochures. The city continues to make readily available a variety of brochures covering the following topics: preventing storm water runoff, xeriscape designs, rain gardens, stormwater quality, suitable plants for desert climates, and rain harvesting. These brochures are available at the City and are handed out during educational events such as the Home Show Expo and Water Fair. The Preventing Storm Water Runoff brochure is also available online. ▪ Presentations. The water fair was cancelled this year, as it was 2012, by the San Juan Water Commission. The City was prepared to present four booths to 5th graders. ▪ Press Release –Press releases were held for the Farmington Clean and Beautiful program and Dumpster Weekend. ▪ Demonstration Projects. No new additional demonstration projects were added this cycle. In the last several years the city has completed demonstration projects for xeriscape pond design and permeable concrete. See previous reports for more in depth discussions and photos. ▪ Informational Booths. The City of Farmington participated in booths throughout the reporting year.  This reporting cycle the water fair was cancelled due to a lack of participation from booth presenters. The city was prepared to host four booths and will plan on presenting next year.  The City once again participated in the Home Show Expo in March of 2013. This will be further addressed in the following section 1.3.2 Stormwater Training and Outreach – Construction Focus, though the event does provide residential information as well. 1.3.2. Stormwater Training and Outreach – Construction Focus Public Meetings and Comment Periods The public comment period on the MS4 report was from 8/26/12 to 9/26/12 and three notices were included in the Farmington Daily Times on Sunday August 26th, Monday August 27th, and Sunday September 2nd. As is stated in the NPDES permit, upon showing of significant interest, the MS4 coordinator is encouraged to hold a public meeting. No meeting was held this last reporting year, but will be scheduled in the case of an increase in public interest. Construction-related Training Workshops No classes were held in the reporting period of 2012-2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 5 Promotional Materials and Activities The City of Farmington promoted several stormwater educational activities during this reporting period. Promotions are summarized below and examples are provided in Appendix B. ▪ Technical Specifications. The City Public Works Department continues to discuss and review BMPs in the City of Farmington’s Technical Specifications & Construction Standards. The standards are posted on the City’s website and was made available at the Building Permit Counter. Online address: http://www.fmtn.org/city_government/public_works/informational_documents.html ▪ Brochures. The City of Farmington has placed BMP information posters on walls near the Building Permit and Inspection counter and made the following brochure available: - Does Your Construction Site Need a Stormwater Permit? A Construction Site Operator’s Guide to EPA’s Stormwater Permit Program, USEPA brochure (EPA 833-F-04-002, February 2004). ▪ Informational Booths. The City of Farmington hosted a booth on March 2nd and 3rd of 2013, at the San Juan County Home Builders Association’s 18th Annual Home Improvement & Building Expo. The two-day event attracted local developers, builders, contractors, vendors, and residents interested in home improvements. The City’s booth contained stormwater educational information for the residential community and the construction industry. The booth’s focus covered a range of information. There were brochures on xeriscape, rain gardens, rain barrels, construction BMP’s and water quality issues. The MS4 coordinator was also available at the booth during periods to speak with people about these topics. Some of these brochures can be found in Appendix B. Figure 1-1 2013 Home Show Booth ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 6 1.3.3. City of Farmington Website The City of Farmington continues to update and provide the most up to date information on its stormwater website. The draft report for the 2012-2013 report was made available during the month of September. A direct link to the EPA’s guide was also made available along with other EPA stormwater informational links. http://fmtn.org/city_government/public_works/stormwater_management.html The site includes program documents, residential information, construction BMP links, links, industrial links, and who to contact at the City for stormwater related questions. At the end of the comment period, the final 2012-2013 report was made available. See Appendix B-5 for the most current site image at the time of this report submittal. During previous periods, the site has been used to announce public meetings. Such events have been promoted on the City’s Stormwater page along with comment forms. 1.3.4. Initiate Partnerships with Interested Groups and Organizations The City of Farmington continues to actively participate with two local watershed planning groups in the area; the Animas Watershed Project (AWP) and the San Juan Watershed Group (SJWG). City of Farmington staff members regularly attended the AWP meetings and participated on AWP committees throughout the year. The city has participated not only in meetings but also City of Farmington staff members serve in committee positions and have reviewed and written material within the watershed management plan. The City continues to stay involved with the SJWG as well and attend meetings. The City of Farmington signed a 40 year contract with Valley Water and Sanitation District to treat the district waste water pumped to the City’s existing collection system. The Valley Water and Sanitation District serves portions of Kirtland. The implementation is expected move many Kirtland residents from septic systems to sewer connections. 1.4. Activities Planned for the Next Reporting Cycle In the next reporting period, the City of Farmington will continue to participate with local watershed groups and to attend events best suited towards educating the public about storm water quality. The Water Fair was found to be a very effective way to involve youth and help them understand more about the water in their rivers and streets. The City plans to attend the Water Fair in 2013. The city will continue to look for the best venues to involve and educate the public further regarding storm water quality. The City will focus on expanding partnerships, providing educational sessions for city employees, and improving educational information for construction and post-construction Best Management Practices (BMPs). A summary of the planned goals and activities for the next reporting period is contained in Table 1-1. 1.5. Proposed Changes A summary of the Public Education and Outreach goals are summarized in Table 1-1. There are no proposed changes from the last report. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 7 1.6. Permit Obligations The City of Farmington does not rely on another government entity to submit information necessary to satisfy permit obligations; however, the City of Farmington does cooperate with other local organizations to achieve some SWMP Plan goals. For example, the City of Farmington works with San Juan College, New Mexico Department of Transportation, San Juan County, the City of Aztec, and the City of Bloomfield to best utilize local programs and resources. 1.7. Inspections and Formal Enforcement Actions For the Public Education and Outreach program area, no inspections or formal enforcement actions were performed during the reporting period. 1.8. Public Access, Review, and Comment Provisions Under the permit, the MS4 Annual Report is due October 1st of each year for the previous reporting period. The permit also requires a public comment period for at least thirty (30) days prior to the submission of the annual report. The City of Farmington met these requirements as described in the Public Meetings and Comment Periods paragraph of Section 1.3.1. No comments were made by the public prior to submittal. The Annual Report was finalized and submitted to the permitting authority by October 1, 2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 8 Table 1-1 Public Education and Outreach Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 GOAL #1 – Annually 1. Annual Water Fair –Teach, develop, and distribute additional informational materials about protection of rivers and lakes and water conservation. Water/Wastewater Admin. Paul Montoia Children and Youth Annually 2007-2012 Year 5 Progress and Year 6 Plans Year 6 – The annual water fair was cancelled in 2013.. The city was prepared to host a total of 4 booths once again. Year 6– The City of Farmington plans to attend the Water Fair in 2013, as well as every year the event is held. Proposed Changes No proposed changes. The City of Farmington plans to participate in the Annual Water Fair each year it is held. GOAL #2 – Annually 2. Partnerships – initiate partnerships with interested groups and organizations: Irrigation Ditch Boards City Engineering FMPO - Planning Division (Joe Delmagori) NSPE - Public Works (Ryan Gladden) River Reach - Parks, Recreation, and Cultural Affairs (Jeff Bowman/Roger Drayer) San Juan Watershed Group - Water/Wastewater Admin. (Paul Montoya, Ruben Salcido) San Juan College, City of Aztec, and San Juan County - Public Works Animas Watershed Partnership - - Water/Wastewater Admin. (Paul Montoya, Ruben Salcido) Agricultural Transportation Engineers Recreational Users Environmental Organizations Adjacent MS4s December 2008 Year 5 Progress and Year 6 Plans Year 6 – City staff members attended San Juan Watershed Group (SJWG) meetings and continued work with the SJWG on project ideas. The City also attended Animas Watershed Partnership (AWP) meetings and participated on committees. Year 6 – Continue to work with watershed groups and look for new partnerships. Proposed Changes No proposed changes. Will work to grow relationships with groups. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 9 Table 1-1 Public Education and Outreach Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 GOAL #3 – Annually 3. Library of Best Management Practices (BMPs) - available at the City of Farmington Building Permit Counter and online at Farmington’s web site. Public Works Developers Builders General Public September 2007 Year 5 Progress and Year 6 Plans Year 5 – Reviewed and updated site as needed. The most up to date information is present at this time with links for stormwater information and BMP’s. Year 6 – Will continue to review the City’s library of BMP’s and update as needed and make them available to the public. Proposed Changes No proposed changes from last report. The City plans to review recommended BMPs annually and consider if additions or updates are needed. GOAL #4 – Year 5 4. NPDES Phase II Training – City Government - to include City Council and relevant departments. Public Works City Engineer/MS4 Personnel City Employees November 2007 Year 5 Progress and Year 6 Plans Year 5 – The City purchased new training materials to share with departments. Year 6 – Training will be implemented with staff. Proposed Changes Yes. The storm water quality training will be planned for year 5. GOAL #5 – Year 2 of the Permit 5. NPDES Phase II Training – Construction Activities – to focus on erosion control and BMPs associated with construction activities. Course to be offered in conjunction with San Juan College and taught by Scott Olson. Public Works City Engineer/MS4 Personnel Developers Builders City Employees November 2007 Year 5 Progress and Year 6 Plans Year 5 – The class was held in the first year of the permit. No classes were offered in Year 5 from San Juan College. Year 6 – Plan to continue to support and partner with San Juan College to hold trainings as requested by the industry. Proposed Changes No GOAL #6 – Performed in Year 4, continues annually ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 10 Table 1-1 Public Education and Outreach Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 6. NPDES Phase II Training – Industrial Activities – to focus on BMPs, stormwater runoff, and illicit discharge or connections to City sewer or storm drains. NOTE: To be conducted after MSGP for industrial activities is published. Public Works: Water/Wastewater Admin. Ruben Salcido MS4 Coordinator/Project Engineer Ryan Gladden Industry 2011-2012 Year 5 Progress and Year 6 Plans Year 5 – Annual trainings are held for city employees regarding accidental spill prevention. Year 6 – Those employees working within industrial sites will continue training as outlined in their MSGP. See the Power Plant and Airport MSGP annual reports. Please contact Britt Chesnut with the city Power Plant or Todd Gressick at the Airport for more information. Proposed Changes GOAL #7 – Year 2 of the Permit (Have continued annually) 7. NPDES Phase II Training – Residential – to focus on educating public about xeriscaping, proper fertilization, rainwater harvesting, and minimizing irrigation runoff. Parks, Recreation, and Cultural Affairs Roger Drayer General Public (Residential Homeowners) 2007-2012 Year 5 Progress and Year 6 Plans Year 5 – The MS4coordinator and engineering staff attended home show expo with brochures related to stormwater information. Information is available at the City counter and website. The water fair was cancelled this year by sponsor. Year 6 – Plan to offer stormwater management related information to local residents and businesses. Will continue to attend events that promote clean stormwater and minimizing runoff. Proposed Changes No proposed changes. GOAL #8 – Annually 8. Utility bill information sheets or brochures on stormwater and protection of surface water. Public Works City Engineer/MS4 Personnel General Public Yearly 2007 ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 11 Table 1-1 Public Education and Outreach Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 Year 5 Progress and Year 6 Plans Year 5 – Sent out stormwater information brochure as well as brochures for the Dumpster Weekend and Farmington Clean and Beautiful programs. Year 6 – Will mail a stormwater brochure with a utility bill each year. Proposed Changes No proposed changes. 1City of Farmington’s Stormwater Management Plan ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 12 2. PUBLIC INVOLVEMENT/PARTICIPATION 2.1. Implementation Status Table 2-3 contains the status of the Public Involvement and Participation goals planned during this reporting period as well as the status on any goals where work has already begun in preparation for future deliverables. 2.2. Overall Compliance with Permit Conditions The City of Farmington worked to complete all the planned goals during this reporting period for the Public Involvement and Participation program area. There are several programs that invite community participation, and many of these programs improve stormwater management by reducing the amounts of waste that might otherwise end up in the stormwater sewer system if not disposed of properly. These programs were offered during this reporting period, and many local residents participated. The code compliance hotline continues to be used by residents and city officers recorded and investigated complaints this period which included illicit discharge reporting. A comment period for residents to provide input on the MS4 Annual Report was provided prior to submitting the MS4 annual report. No public meetings were held this reporting year, as no significant public interest mandated one per the NPDES requirement. 2.3. Results of Information Collected and Analyzed During the Reporting Period The following sections provide information collected and analyzed during this reporting period. Some historical information has been left in from earlier reports. 2.3.1. Code Compliance Hot Line The City has code compliance officers and a code compliance hotline to record and investigate illicit discharge complaints. During this reporting period, a total of 17 stormwater related complaints were received and substantiated as illicit discharges. Each Illicit discharge was resolved. More detailed results are provided in Section 3 Illicit Discharge Detection and Elimination. 2.3.2. Farmington Clean & Beautiful Volunteers from various civic groups, schools, and scout groups participated in the Farmington Clean & Beautiful Adopt a Highway Program. During this reporting period, there were 333 volunteers who collected 648 bags of trash. Additionally, this reporting cycle, the Farmington Clean & Beautiful Program held a refrigerator recycling day during the Non-Hazardous Waste Program day. A total of 56 refrigerators were collected and disposed of properly. 2.3.3. Household Non-Hazardous Waste Program The Farmington Parks, Recreation, and Cultural Affairs Department coordinated two Dumpster Weekend events in which volunteers collected and properly disposed of household non-hazardous waste. There were 447 total volunteers that aided in the clean and beautiful programs and waste collection. The collection results are summarized in Table 2-1. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 13 Table 2-1 Household Non-Hazardous Wastes Collected Year Total Waste from Dumpsters (tons) Fridges Metal Waste (tons) Electronics (tons) Cardboard (tons) 2012-2013 223 56 122 4 2 Yard waste collected was recycled to create compost. The compost was then used for city parks and was also made available to the public. 2.3.4. Household Hazardous Waste Program The Water/Wastewater Department of the City of Farmington and San Juan County held household hazardous waste collection events in September of 2012 and May of 2013. Residents brought in old batteries, household paints and chemicals, etc. for proper disposal. The proper disposal of these materials is crucial for the cleanliness of our streams and rivers. Batteries, chemicals, oils, and other hazardous and non-hazardous materials disposed of during these events contain: lead, nickel, nitrates, chlorites, alkaline, lithium diazinon, and cadmium, just to name a few. Collection results are summarized in Table 2-2. Table 2-2 Household Hazardous Wastes Collected Date Collection Site Number of Cars Recycled (pounds) Energy Recovery (pounds) Incineration (pounds) Landfill (pounds) TOTAL (pounds) Spring 2013 City of Farmington 183 10,530 8,946 2,056 13,000 34,532 San Juan County 142 Event Total 325 Fall 2012 City of Farmington 274 9,995 11,166 1,698 9,000 31,859 San Juan County 67 Event Total 341 2.3.5. Xeriscape Demonstration Garden Improvements There were no additional xeriscape demonstration projects this year. In 2009, a Xeriscape Park/Pond was completed. Refer to the 2009-2010 report. The project is also referenced on the City website. 2.3.6. Regional Forums on Climate Change and Water The City of Farmington did not participate in any regional forums on climate change and water this reporting period. 2.3.7. Recycling Program The City of Farmington continues its residential curbside recycling program. At the request of residents, waste management provides a recycling bin that is collected every other week. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 14 2.3.8. Storm Drain Labeling No additional labeling was completed this reporting year. Over the past two years, the city has coordinated with scouts to label many of the storm inlets throughout the town. Once the master drainage study is complete, we will continue to label drains with scouting participation. 2.3.9. City of Farmington Website The City of Farmington continues to update the stormwater website to ensure the most relevant and up to date information is present. The website can be found at the following web address: http://www.fmtn.org/city_government/public_works/stormwater_management.html The site includes program documents, residential information, construction BMP links, links, industrial links, the most current MS4 report, and who to contact at the City for stormwater related questions. (See Section 1.3 for additional detail and Appendix B-5 for the most current website image) 2.4. Activities Planned for the Next Reporting Cycle In the next reporting period, the City of Farmington will continue to offer similar local participation events to collect and properly dispose of wastes. The City will continue to address reported code violations. It should be noted that all new City of Farmington inlets are installed with a pre-stamped no dumping label. A summary of the planned goals and activities for the next reporting period is contained in Table 2-3. 2.5. Proposed Changes There are no proposed changes from last reporting period. 2.6. Permit Obligations The City of Farmington does not rely on another government entity to submit information necessary to satisfy permit obligations; however, the City of Farmington does cooperate with other local organizations to achieve some SWMP Plan goals. For example, the City of Farmington works with Waste Management and San Juan County to best utilize local programs and resources. 2.7. Inspections and Formal Enforcement Actions Code compliance complaints were each investigated to determine if code violations existed. Violators were given 24 hours to satisfactorily address any issues. In each case, issues were resolved within the 24-hour period, so further enforcement or legal action was not pursued. The development of an official ordinance that specifically prohibits discharges into the storm drainage system and outlines penalties will allow the city to better enforce violations under its own standards. 2.8. Public Access, Review, and Comment Provisions Under the permit, the MS4 Annual Report is due October 1st of each year for the previous reporting period. The permit also requires a public comment period for at least thirty (30) days prior to the submission of the annual report. See section 1.3.1 for a discussion in meeting these goals. No comments were made by the public prior to submittal. The Annual Report was finalized and submitted to the permitting authority by October 1, 2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 15 Table 2-3 Public Involvement/Participation Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 GOAL #1 – Annually 1. Code Compliance Hot Line for reporting stormwater complaints or reports of illicit discharges. Data to be included within SWMP Annual Reports. Code Compliance General Public Ongoing 2007 Year 5 Progress and Year 6 Plans Year 5 – Monitored and addressed 17 code compliance calls received from the public and municipal employees. Results are summarized in Section 3 Illicit Discharge and Elimination. Year 6 – Continue logging and responding to calls. Proposed Changes No proposed changes. GOAL #2 – Annually 2. Coordinate with Farmington Clean & Beautiful to continue Adopt a Highway cleanup. Cherie Powell Parks & Recreation Civic group volunteers; students; scout groups May & September 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – Volunteers participated in the Adopt a Highway cleanup activities to collect and properly dispose of litter. Year 6 – Continue support for the Farmington Clean and Beautiful programs. Proposed Changes No proposed changes. GOAL #3 – Annually 3. Coordinate, implement, and track volume of waste disposed of through the Household Non- Hazardous Waste Programs. Cherie Powell Parks & Recreation General Public April & October 2007 - 2012 Year 5 Progress and Year 6 Plans Year 4 - Held Dumpster Weekend collections in October of 2012 and May of 2013. Tracked data on waste collected. Year 6 – Continue to offer Dumpster Weekend collections and track data. Proposed Changes No proposed changes. GOAL #4 – Annually ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 16 Table 2-3 Public Involvement/Participation Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 4. Coordinate, implement, and track volume of waste disposed of through the Household Hazardous Waste Programs. Ruben Salcido Water/Wastewater Admin. General Public Annually 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – Held collection events in September of 2012 and May of 2013. Year 6 – Continue to offer household hazardous waste collection events. Proposed Changes No proposed changes. GOAL #5 – Annually 5. Hold annual public meeting to solicit feedback on the SWMP. Personnel from Farmington’s Public Works, Planning and Zoning, Parks, Recreation, and Cultural Affairs, Water Wastewater departments to be present. Public Works General Public City of Farmington Departments December 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – No public meeting was held in this reporting period. Public interest has not shown significant interest to warrant one. Year 6 – Will continue to seek input from the public and upon greater interest will schedule a public meeting. Proposed Changes Change was proposed in last report to match the NPDES, the public meeting will be scheduled upon a showing of significant interest. GOAL #6 – Year 2 of the Permit (Have performed in multiple years of permit) 6. Continue storm drain labeling to raise awareness that water or materials entering storm drains ultimately discharges to the San Juan, Animas and La Plata Rivers. Public Works: Ryan Gladden MS4 Coordinator/Project Engineer Civic group volunteers; students; scout groups December 2008 Year 5 Progress and Year 6 Plans Year 5 – No further labeling was completed this reporting period. Year 6 – Plan to label more storm drains as the master drainage map is updated. Will coordinate with scout groups and other volunteers. Proposed Changes No GOAL #7 – Year 1 of the Permit (updated annually) ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 17 Table 2-3 Public Involvement/Participation Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Targeted Audience Month in SWMP1 Year of Permit in SWMP1 7. Farmington web page – to include posting the most recent SWMP Plan, NOI, useful links, BMP library, and a feedback/contact link. Information Technology Public Works General Public September 2007 Year 5 Progress and Year 6 Plans Year 4– Continued to keep information updated. The last years MS4 report was made available along with helpful information and useful links. See Section 1.3.3 Year 6 – Will continue to review stormwater information on the City’s website. Will update and revise the site as necessary. Proposed Changes No. 1City of Farmington’s Stormwater Management Plan ---PAGE BREAK--- ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 19 3. ILLICIT DISCHARGE DETECTION AND ELIMINATION 3.1. Implementation Status Table 3-1 summarizes the status of the Illicit Discharge Detection and Elimination (IDDE) program goals planned during this reporting period as well as the status on any goals where work has already begun in preparation for future deliverables. 3.2. Overall Compliance with Permit Conditions The measurable goals for the illicit discharge detection and elimination program area focus on locating problem areas, finding sources of the problems, removing or correcting illicit connections, and documenting actions taken. The city continued dry weather sampling during this reporting year in an attempt to track possible problem areas. The city contracts out with an environmental firm to collect sampling. Due to the lack of storms over this reporting period, only one sampling rainfall event could be collected in September of 2011. This sampling could only conduct E. Coli testing one of the sites due to time of day and maximum holding procedures for the contaminant. Dry weather sampling continued. The City has since coordinated with Animas Environmental to install automatic sampling collectors to aid in collection for rainfall events that occur during hours when sampling cannot be manually taken. 3.3. Results of Information Collected and Analyzed During the Reporting Period Results of information collected and analyzed during the reporting period for the IDDE program area are summarized in the following sections. 3.3.1. Stormwater Outfall Sampling During the reporting period (2012-2013), Animas Environmental Services, LLC (AES) was unable to collect semi-annual rainfall event sampling on outfalls. The city experienced a shortfall of rain during this period that made sampling unachievable. The small amount of rain that did fall came during night hours when the contractor was not available. To deal with this problem, Animas Environmental has since purchased automatic samplers that can be installed in manholes and inlets and collect samples for rain events that fall overnight (see figure 3.1 for map with corresponding numbered locations): 1. Arroyo West of Lowe’s Parking Lot (Hood Arroyo) – Continue sampling 2. El Paso/Middle Fork Square (Porter Arroyo) – Continue sampling 3. Berg Park Location – Continue sampling 4. Municipal Operations Center (MOC) Sewer Outfall #1 – Continue sampling 5. MOC Sewer Outfall #2 – Continue sampling 6. MOC Sewer Outfall #3 – Continue sampling 7. Murray Drive Bridge Settling Pond – Continue sampling 8. South Side Lift Station #2 – Continue sampling 9. Cannery Court Location – Continue sampling 10. Intersection of Gooding and Riverview –No Longer Sampled 11. City Sports Complex Baseball Fields on Pinon Hills (Inlet of 30-inch North HDPE Pipe) – Continue Sampling (was number 15 last year) ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 20 12. City Sports Complex Baseball Fields on Pinon Hills (Outlet of 30-inch South HDPE Pipe) – No Longer Sampled 13. Glade Arroyo Culvert on South Side of Navajo Street – Continue sampling 14. South of Murray (Sweetland) – Glade Discharge – Continue Sampling 15. South Butler – New location that replaced previous sampling location #12. This new sampling location was chosen because it is a large outfall that is close to the Animas River. See previous report. 16. Airport Detention Pond – Tested as a possible source for contaminants found in Farmington Glade. – No Longer Sampled 17. Brookside/Auburn & Boyd - Tested as a possible source for contaminants found in Farmington Glade. – No Longer Sampled 18. Carwash at Dustin and 20th – No Longer Sampled 19. Vine East of Butler – Dry Weather test of continuously running water as a possible source for fecal contaminants found in South Butler Outfall. – No Longer Sampled 20. Vine at Irrigation (manhole) - Dry Weather test of continuously running water as a possible source for fecal contaminants found in South Butler Outfall. – No Longer Sampled 21. Pinon/Cedar (manhole) - Dry Weather test of continuously running water as a possible source for fecal contaminants found in South Butler Outfall. – No Longer Sampled 22. Civitan Pond Outlet – One time dry weather sampling on running water to isolate E. Coli problems that have persisted in the Glade Arroyo. The city continues to monitor and isolate issues when they become apparent from sampling. This reporting year, the city sampled location 22 at the outlet of a pond on the Glade arroyo. This site was added at the end of last reporting year, and was discussed in last year’s report, but the sampling was done in this cycle. Sampling has shown some moderately high values in E. Coli. The city is currently investigating upstream but has not been able to determine a definite source. The sampling frequency is contracted out to be on a semi-annual basis. As discussed, because of factors such as time of day, day of the week, holding times for certain parameters, and extreme variability in rainfall events in arid climates, only one sample was able to be taken this cycle in the fall of 2011. Only one of the samples taken could be tested for E. Coli because of the hour of the day when samples were collected. The holding time for E. Coli is 4 hours and cannot be kept overnight for testing the following day. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 21 Figure 3-1 Stormwater Sampling Locations – Year 5 *Only active testing sites are shown on map 22 ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 22 3.3.1.1. Baseline Sampling Event – February 2007 The following information in subsection 3.3.1.1 regarding the Baseline Sampling and commencement of the annual sampling has been left in this year’s report for background informational purposes. AES conducted baseline sampling at representative stormwater outfall locations throughout the city in February 2007. The purpose of the sampling was to assist in locating problem areas and to establish a baseline. Stormwater samples were measured in the field for pH, temperature, dissolved oxygen (DO), and specific conductivity. Laboratory samples were also collected and analyzed for chemical oxygen demand (COD), total suspended solids (TSS), oil and grease, and metals (aluminum, arsenic, cadmium, copper, iron, lead, nickel, and zinc). Stormwater analytical results from sampling conducted during February 2007 showed concentrations to be below USEPA stormwater benchmarks, with the following exceptions.  Two samples (Outfall #1 and collected from Farmington’s Municipal Operations Center (MOC) showed elevated pH readings, specific conductivity, and COD, with specific conductivity in Outfall #1 at 13.88 mS/cm, which was approximately one order of magnitude higher than other samples collected. Note that specific conductivity is reflective of total dissolved solids (TDS) and may reflect an impact from materials stored at the MOC (such as magnesium chloride). The MOC Outfall #1 also had COD concentrations of 193 mg/L, which were above the USEPA general stormwater benchmark of 120 mg/L. The pH readings from both Outfall #1 and #2 were elevated, with 9.13 and 9.62, respectively.  Elevated specific conductance levels were also detected at several sampling locations, including El Paso/Middle Fork Square, Berg Park, Murray Bridge Settling Pond, South Side Lift Station and Cannery Court. It should be note that elevated specific conductance levels are typical in the arid Southwest. 3.3.1.2. Stormwater Sampling – Year 5 As discussed, AES was unable to complete more than one stormwater sample collection at outfall locations during this reporting period. The lack of rain over this last reporting period during collectable hours made sampling unachievable. For a review and discussion of previous outfall rainfall event sampling, please refer to prior annual reports. The entire city’s stormwater sampling has been tabulated and can be found in Appendix C. A digital copy of dry weather sampling can be found in the cd included with this report. In years past, stormwater flow was measured, along with rainfall data, pH, temperature, DO, and specific conductivity. Laboratory analyses included oil and grease, TSS, COD, aluminum, arsenic, cadmium, chloride, copper, iron, lead, nickel and zinc, Fecal, E. Coli, and nutrients (including nitrate/nitrite, total nitrogen (TKN), ammonia, and phosphorus). All sampling was conducted in accordance with Standard Operating Procedures for Sample Collection and Handling (Surface Water Quality Bureau, NMED, June 2004). Note that the hold time for fecal coliform is four hours, and any stormwater sampling conducted in the evenings or on weekends may preclude sample analyses for fecal coliform. Sample parameters, appropriate USEPA methods, and general USEPA stormwater benchmark values are noted in Table 3-1. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 23 Please refer to Appendix C for the full test results in prior years. Table 3-1 Sampling Parameters, Methods, and General Benchmarks Sample Parameter EPA Method General USEPA Stormwater Benchmark Values† Flow Field measurement Not Applicable pH EPA 150.1 6.0 - 9.0 Temperature EPA 170.1 Not Established Dissolved Oxygen EPA 360.1 Not Established Specific Conductivity EPA 160.1 <0.2 mS/cm* Oil and Grease EPA 1664 <15 mg/L Chemical Oxygen Demand (COD) EPA 410.4 <120 mg/L Aluminum EPA 6020 <0.75 mg/L Arsenic EPA 6020 <0.16854 mg/L Cadmium EPA 6020 <0.0159 mg/L Copper EPA 6020 <0.0636 mg/L Iron EPA 6020 <1 mg/L Lead EPA 6020 <0.0816 Nickel EPA 6020 <1.417 Zinc EPA 6020 <0.117 Fecal Coliform coli) EPA 1603 (filter membrane) or SM 9223.B (Colilert) Not Established Nutrients (Nitrate/Nitrite, Total Kjeldahl Nitrogen (TKN), Ammonia, Phosphorus) Nitrate - EPA 353.2, 354.1; Nitrite – EPA 353.2; 354.1; TKN - EPA 351.2 or 351.3; Ammonia - EPA 350.3, 350.2, 350.1; Phosphorus - EPA 365.4 or SM 4500-P Not Established Total Suspended Solids (TSS) EPA 160.2 <100 mg/L †EPA benchmark values assist in evaluating stormwater impacts; however, they are not enforceable standards. *EPA benchmark value for specific conductivity is not typical for the San Juan Basin area. 3.3.1.3. Evaluation of Sample Results Analytical results have been tabulated in Appendix C. Please see the prior year’s report for a more detailed account of exact results for outfalls. The elevated constituents found during sampling events have been discussed in prior reports. Please see those findings. Note that benchmark values are not enforceable standards; rather, they are values to assist in evaluation of stormwater impacts. In analyzing the sampling results in prior years, it has been found that results at the majority of sites are inconsistent on COD, TSS, E. Coli, and Fecal. Results at one time of year might point to an ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 24 elevated concentration of E. Coli, but then months later show no trace of the contaminant, or significantly lower results. This may point to a one time dumping/discharge of pollutants. Farmington is a very arid climate, averaging between eight to nine inches of rain a year. When a sample is taken, it may be the first significant rainfall event to have produced runoff in months, depending on the year. Pollutants in arroyos, roads, or resulting from illegal dumping have remained in place and collected for long periods before runoff can produce the required flow to wash them to an outlet. This results in a higher concentration in dry arid climates when compared with regions where rainfall is regular. The city has looked upstream from areas that have shown elevated results in E. Coli. In the Glade arroyo, for example, personnel have walked the arroyo in search of suspicious connections but, as of now, not found any illicit discharge. The city continues to sample and search for sources to account for the high contaminant levels. The Code Compliance Hotline remains one of the most valuable tools the city has in locating pollutant sources. Near the Glade Arroyo this year, a sewage leak was reported coming from a business. The owner was contacted and the problem fixed. While speaking with the owner, it became apparent that the leak had been a problem previously on several occasions. This appears to be the case with many sewage problems. Until they are reported by the public or by staff, many of the residents let sewage problems persist. As the city continues to find these problems, sampling will be monitored for improvement. Sites 1, 2, 3, 9, 13, and 14 have all had some spikes in E. Coli at one sample or another. None of the sites has been completely consistent. The city has investigated upstream of these outfalls and performed additional dry weather sampling in some cases to attempt to isolate the problem. Dry weather sampling on irrigation water has not resulted in the discovery of any contaminant contribution, except in the case of the Glade Arroyo. The city has noted high amounts of TSS in some of the dry weather sampling and suds in the water. Animas Environmental is planning to use automatic samplers in several upstream locations from the outlet in hopes of isolating potential sources. As was discussed in the last report, site 22 was added, as has been discusses, to aid in locating high values of E. Coli in the Glade arroyo. The pond was sampled, and though it did show E. Coli, it is not believed this was high enough to be the only source of contamination, nor does it automatically mean that the source is the pond. The City and Animas Environmental are in the process of choosing new locations in town to aid in isolating contaminant sources. Since the baseline sampling event in February 2007, the City of Farmington has swept the paved surfaces at the MOC each year (see Table 6-2). In addition, based on the first year sampling results and evaluation, the City of Farmington plans to continue to take the following actions: A. Monitor sampling results and revise sampling and dry weather inspection locations accordingly. After evaluation, if sampling values are found to be consistently above benchmark values, sampling will be strategically revised to locate the source of the problem. B. Continue with dry weather inspections at representative sampling locations. If flowing water is observed during a dry weather inspection, collect a sample for analysis of fecal coliform. C. Continue with the evaluation of MOC operations, good housekeeping measures, and site structural BMPs; ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 25 D. Gather more data about irrigation ditches and ditch returns; and E. Continue working with the San Juan Watershed Group to find opportunities to locate and solve stormwater quality issues. 3.3.2. Dry Weather Outfall Inspections Dry weather inspections were conducted and documented periodically throughout the reporting period. Inspection reports are on file at the City of Farmington and can be viewed upon request. The City will continue to conduct dry weather sampling at representative outfalls during the next reporting period to help identify potential illicit discharges. The dry weather sampling helps the City identify possible sources of contamination in several ways. For one, it is an excellent way in which to find illicit connections when running water is observed. When there is no running water, inspectors look for other signs such as standing water, or the color or odor in the area. Rust is commonly found on deteriorating metal culverts in outfall locations. The city does not install metal culverts any longer, and has replaced many CMP pipes with HDPE over the last decade. High alkalinity in the region’s soils makes metal piping a poor design choice in most cases for city use. The City Electric Department is planning the construction of storage facilities to house old transformers, equipment, and road salt for ice removal. See Section 6 for more information. This is part of a continued effort to lower contaminants from city operations. 3.3.3. Camera Inspection and Cleaning Program In January of 2008, the City of Farmington contracted with a third party to implement a camera inspection and cleaning program. The total length inspected (no cleaning required) and pipe cleaned during this reporting period is shown in Table 3-2. Table 3-2 Camera Inspection and Cleaning (July 2012 – June 2013) Sewer Type Video Inspection feet (miles) Cleaning feet (miles) Storm Sewer 1,464 ft. (0.85 mi.) 10,522 ft. (2.84 mi.) Sanitary Sewer 258,972 ft. (58.34 mi.) 337, 093 ft. (44.39 mi.) Total 260,436 ft. (59.19 mi.) 347,615 ft. (47.23 mi.) 3.3.4. Illicit Discharge Ordinance The City of Farmington has worked to revise the Illicit Discharge Ordinance following the EPA’s suggested models. The new ordinance has still not undergone evaluation by Council for approval. The ordinance is awaiting further revisions and approval. The City expects to have the new ordinance approved and in place during the next reporting year. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 26 3.3.5. Storm Drain System Map and Master Drainage Study The City of Farmington has hired HDR Engineering, Inc. to develop a master drainage study. The project includes development of a field-verified and updated storm drain map and geographic information system (GIS) database as well as hydraulic modeling and analyses of the storm drainage collection system. The study is in its final review period with the City to ensure its accuracy. 3.3.6. Code Compliance Hotline The City has Code Compliance Officers and a Code Compliance hotline to record and investigate illicit discharge complaints. During this reporting period 17 complaints were received in regards to illicit discharges that were substantiated. The types of complaints received during each month are summarized in Table 3-6. Each complaint was investigated by the City. Each illicit discharge was resolved. Table 3-3 Illicit Discharge Complaints Investigated (July 2010 – June 2013) Description 2012-2013 Sanitary Sewer Leak 12 Irrigation Ditch Overflow 0 Septic System Leak 5 Restaurant Grease Leak/Dumping Gray Water Leak 0 Oil Dumping/Spill 0 Other Dumping/Spill 0 Total Illicit Discharges 17 The City continues to find and address serious septic leak issues. While these are clearly not desired, the City is pleased to be slowly finding and correcting many of these serious groundwater issues that plague our streams and rivers. As was discussed in the last report, immediate impacts have been seen. One of these issues solved was upstream of sampling site 1. This is believed to have helped substantially with the lowering of E. Coli. Sampling taken before the leak was fixed in September 2010 showed much higher presence of E. Coli than those taken in the Spring of 2011. Once any leak is reported, the City takes immediate action to block off any surface flow and ensure that contaminants do not reach any storm system, natural or man-made. The resident is then given 24 hours to correct the situation. The site is properly cleaned and wastes disposed of. In the case that contaminants have reached the storm system, the violator is cited and made responsible for cleanup. In cases of emergency, the city will clean up the contaminants immediately and charge the violator for the work performed. 3.4. Activities Planned for the Next Reporting Cycle In the next reporting period, the City of Farmington plans to continue to perform stormwater and dry weather sampling at the representative outfall locations. The new auto samplers to be used by Animas Environmental should aid significantly in obtaining samples from storms that occur over night. The ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 27 City will also continue to evaluate sample results in an effort to identify and address illicit discharges. The City will pass the new illicit discharge ordinance this year and continue to camera and clean storm drains. The City will complete the Master Drainage study. A summary of the planned goals and activities for the next reporting period is contained in Table 3-6. 3.5. Proposed Changes Proposed changes to the IDDE program goals are provided in Table 3-6. The only changes made have been to the timeline and are predominantly budget dependant. The City is still awaiting the final completion of the Master Drainage Study, and is also working to finalize the adoption of new ordinances. 3.6. Permit Obligations The City of Farmington does not rely on another government entity to satisfy permit obligations. 3.7. Inspections and Formal Enforcement Actions The code compliance team inspected 17 complaints of illicit discharge reports that were substantiated. Each substantiated complaint was addressed and resolved. 3.8. Public Access, Review, and Comment Provisions Under the permit, the MS4 Annual Report is due October 1st of each year for the previous reporting period. The permit also requires a public comment period for at least thirty (30) days prior to the submission of the annual report. The City of Farmington met these requirements as described in the Public Meetings and Comment Periods paragraph of Section 1.3.1. No comments were made by the public prior to submittal. The Annual Report was finalized and submitted to the permitting authority by October 1, 2013. ---PAGE BREAK--- ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 29 Table 3-3 Illicit Discharge Detection and Elimination Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #1 – Year 1 of the Permit (continued annually) 1. Continue to sample representative outfall locations. Change stormwater sampling frequency to semi-annual collection. Public Works to Implement; City Personnel or Qualified Contractor May Conduct Sampling Jan-Mar Apr-Jun July-Sept Oct-Dec 2007 2008 Year 5 Progress and Year 6 Plans Year 5 – The contractor was unable to collect samples this reporting cycle due to low rainfall. Year 6 – Continue to collect and analyze samples at representative outfalls semi- annually. Auto samplers should provide for better sample collection. Proposed Changes Sampling will continue at a semi-annual frequency when rainfall is sufficient. GOAL #2 – Year 1 of the Permit (continued annually) 2. Implement camera inspection program where 1/5th of drains are inspected via camera each year. Approximately $300k budgeted during FY08 for cleaning storm drains. Public Works Water/Wastewater Admin. June 2008 Year 5 Progress and Year 6 Plans Year 5 – Continued camera inspection and cleaning program. See Table 3-5. All arroyos and many culverts and storm pipes were cleaned of debris/sediment following major flooding in August 2010. Year 6 – Continue the camera inspection and cleaning program. As the City’s master drainage study is completed and map of storm sewers is provided, a better plan of inspection will be formulated. Proposed Changes No changes. GOAL #3 – Year 1 of the Permit (continued annually) 3. Start conducting quarterly dry weather outfall inspections on routine basis. Sample locations to include outfall locations at rivers and major arroyos. Public Works to Implement; City Personnel or Qualified Contractor May Conduct Sampling Jan-Mar Apr-Jun July-Sept Oct-Dec 2007 2008 ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 30 Table 3-3 Illicit Discharge Detection and Elimination Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 Year 5 Progress and Year 6 Plans Year 5 – A qualified contractor performed dry weather inspections. Results are discussed above in Section 3. Year 6 – Continue to perform dry weather inspections at representative outfalls semi- annually. Proposed Changes No. GOAL #4 – Year 5 of the Permit 4. Review existing ordinances to ensure that they effectively prohibit illicit discharges or dumping. Ensure that appropriate enforcement mechanisms are in place. Public Works December 2008 Year 5 Progress and Year 6 Plans Year 5 –New revisions have been made. Waiting for approval. Year 6 – Will push to have revisions approved and implemented. Proposed Changes The city plans to have the revisions reviewed by Council this reporting period. GOAL #5 – Year 5 of the Permit 5. Incorporate stormwater collection map into GIS. Information Technology GIS Division December 2009 Year 5 Progress and Year 6 Plans Year 5 – The study is in its final review. Year 5 –Analysis and mapping will continue and be completed in year 6. Proposed Changes No proposed changes. GOAL #6 – Year 4 of the Permit 6. Develop budget and timeline for implementation of structural BMPs relating to illicit discharge/ connection. To be developed within 18 months after completion of Master Drainage Study. Public Works July 2010 Year 5 Progress and Year 6 Plans Year 5 – Still awaiting completion of the Master Drainage Study. Year 6 – The master drainage study will be completed in year 6. Will start working towards budget and timeline during the next period. Proposed Changes Yes. Timeline for completion changed to next permit. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 31 Table 3-3 Illicit Discharge Detection and Elimination Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #7 – Year 2 of the Permit 7. Develop partnership efforts with local irrigation ditch boards. Public Works City Engineering December 2008 Year 2 – Created irrigation informational flyer that provides general irrigation ditch information, contacts, and common issues in Year 2. Year 6 – Will continue to work with irrigation companies and make irrigation flyers available. Proposed Changes No. GOAL #8 – Years 2 and 4 of the Permit (Propose rescheduling to Years 3 & 8a. Identify or track industrial facilities within the City (by business licensing or other means) which are required to have Industrial Multi-Sector General Permits (MSGP) for the NPDES Program. 8b. Once identified, develop a protocol for inspecting and certifying that no illicit connections to sanitary or storm sewer are present. Business Licenses to identify facilities; Water/Wastewater Admin to develop protocol for inspection and certification that no illicit connections present. December December 2008 2010 Year 5 Progress and Year 6 Plans Year 4– The City did not track or inspect the MSGP for business during this reporting period. Year 6 – Prepare a list of businesses within the city limits for submittal to the NMED. Proposed Changes Yes. The responsibility of tracking and inspecting the MSGP is that of NMED Surface Water Quality Bureau. NMED Contact: Rich Powell GOAL #9 – Annually 9. Continue public outreach and educational efforts to keep public employees, businesses, and general public informed about hazards and impacts of illegal discharges and improper waste disposal. Public Works Varies 2007 - 2012 ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 32 Table 3-3 Illicit Discharge Detection and Elimination Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 Year 3 Progress and Year 4 Plans Year 5 – Reviewed public education and outreach efforts to make sure goals are still appropriate and we are reaching the targeted audiences. Refer to Sections 1 and 2. Year 6 – Review the public education and outreach efforts to make sure goals are still appropriate and we are reaching the targeted audiences. Proposed Changes No proposed changes. 1City of Farmington’s Stormwater Management Plan ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 33 4. CONSTRUCTION SITE STORMWATER RUNOFF CONTROL 4.1. Implementation Status Table 4-1 summarizes the status of the Construction Site Stormwater Runoff Control goals planned during this reporting period as well as the status on any goals where work has already begun in preparation for future deliverables. 4.2. Overall Compliance with Permit Conditions The measurable goals for the Construction Site Stormwater Runoff Control program area evaluate and revise staffing needs, ordinances, and processes as necessary to consider and address stormwater concerns throughout the construction process. Goals also include education and outreach activities to help inform and prepare contractors. The City is still working to complete these goals. See table 4-2. Some of these goals, such as the hiring of new personnel cannot currently be achieved due to budget constraints. Current staff are made aware of stormwater quality issues and also work to inform contractors in the area. 4.3. Results of Information Collected and Analyzed During the Reporting Period The following sections provide information collected and analyzed during this reporting period. 4.3.1. Erosion and Sediment Control Ordinance The City has made revisions in a new grading ordinance in an effort to further minimize erosion on construction sites and to fulfill MS4 construction program requirements. The ordinance is awaiting approval at the time this report was written. 4.3.2. Stormwater Construction-related Training for City Staff Table 4-1 lists the construction-related training and educational outreach workshops conducted between 2004 and 2009 and shows the number of City employees who attended. Table 4-1 Construction-Related Training Workshops Year Training Course No. of City Participants 2009 Construction BMP’S 5 2009 Good Housekeeping 2 This reporting period, the City reviewed training materials and purchased a new MS4 interactive video module to implement in training construction inspectors, maintenance crews, and street crews. In 2013, the coordinator attended the MS4 conference where classes were held on construction bmp’s. The MS4 coordinator continues to participate in web trainings hosted by the EPA and pass this information on to engineering and inspection staff. The City also plans to send the MS4 coordinator to the annual MS4 conference to be held in 2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 34 4.3.3. Stormwater Program Staffing Ryan Gladden P.E., an engineer employed by the City, has been the acting MS4 coordinator since February, 2009. There is currently no full time MS4 staff, and budgetary constraints have hindered the City’s ability to fill vacancies and open new positions. 4.3.4. Stormwater Construction Guidance The City of Farmington provided the following construction BMP guidance during this reporting period: ▪ BMP Guidance. The City’s website is frequently reviewed to ensure the most current information. This section continues to be updated and contains information on the SWMP as well as links to the USEPA’s National Menu of BMPs and guidance. http://www.fmtn.org/city_government/public_works/stormwater_management.ht ml. The city also posts BMP guidance posters on the walls near the Building Inspection counters. ▪ Technical Specifications. The construction standards were reviewed for relevant information in 2013. No significant changes were made to the BMP and erosion control section. The guide is posted on the City’s website and was made available at the Building Permit and Inspection Counter. Online address: http://www.fmtn.org/city_government/public_works/informational_documents.html ▪ Brochures. The City of Farmington continues to make the following brochures available on the internet and at the Building Inspection Counter upon request: - Builder’s Stormwater Quick Reference Guide. This brochure was developed in March of 2008 by the City of Farmington and targets the construction industry and provides information on stormwater permit requirements, BMPs, the difference between erosion control and sediment control, and helpful BMP and resources. (Brochure is contained in Appendix - How Do I get Stormwater Permit Coverage for My Construction Site? A Construction Site Operator’s Guide to EPA’s Stormwater Permit Program, USEPA brochure (EPA 833-F-04-002, Sept 2007). - Reducing Stormwater Costs through Low Impact Development (LID) Strategies and Practices. USEPA Fact Sheet and Questions and Answers (EPA 841-F-07-006, December 2007) - Professional Guidance. The City of Farmington’s Engineering Department is always ready to assist Contractors in the guidance of construction BMP’s. The engineering department frequently fields calls from contractors for guidance. ▪ Staff – Staff is always prepared to aid contractors with direction and questions regarding the NOI process. Staff also helps contractor with appropriate BMP information. 4.3.5. Stormwater Construction Education & Outreach The City of Farmington promoted several stormwater educational activities during this reporting period. Promotions are summarized below. ▪ Informational Booths. The City of Farmington hosted a booth on March 2nd and 3rd of 2013, at the San Juan County Home Builders Association’s 18th Annual Home Improvement & Building Expo. The two-day event attracted local developers, builders, contractors, vendors, and residents interested in home improvements. The City’s booth ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 35 contained stormwater educational information for the residential community and the construction industry. ▪ Educational Materials. The City of Farmington provided BMP guidance and technical specifications as well as informational brochures. ▪ Professional Associations. o National Society of Professional Engineers (NSPE). City of Farmington staff members actively participate with the local NSPE chapter, which meets once during lunch with an invited speaker. The group often finds speakers with interests in water quality and erosion control. 4.4. Activities Planned for the Next Reporting Cycle The City will continue to review BMPs and training opportunities to determine if additional training or BMP updates are needed. The stormwater activities planned for the next reporting cycle are summarized in Table 4-2. 4.5. Proposed Changes There are no proposed changes from last report. See Table 4-2 4.6. Permit Obligations The City of Farmington does not rely on another government entity to submit information necessary to satisfy permit obligations; however, the City of Farmington does cooperate with other local organizations to achieve some SWMP Plan goals. For example, the City of Farmington works with the San Juan Homebuilders Association and San Juan College to provide information and updates to local builders and developers. 4.7. Inspections and Formal Enforcement Actions Under the City’s current grading ordinance, plan reviews are required for sites that disturb two or more acres. During construction, builders and developers are required to keep drainage onsite. If a drainage issue arises, building or construction inspectors and engineering staff review the issue and determine the appropriate resolution. If the issue is not resolved, City Inspectors can stop construction at the site until the issues are resolved. The Construction Site Stormwater Runoff Control program is developing. It focuses on updating ordinances, training staff, acquiring resources, and educating local developers and builders. 4.8. Public Access, Review, and Comment Provisions Under the permit, the MS4 Annual Report is due October 1st of each year for the previous reporting period. The permit also requires a public comment period for at least thirty (30) days prior to the submission of the annual report. The comment period began Sept. 5th, which is less than the 30 days. See Section 1.3.1. No comments were made by the public prior to submittal. The Annual Report will be finalized and submitted to the permitting authority by October 1, 2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 36 Table 4-2 Construction Site Stormwater Runoff Control Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #1 – Year 5 of the Permit 1. Review and amend existing grading ordinance to address erosion control and other BMPs at construction sites greater than or equal to 1 acre. Public Works MS4 Personnel City Legal Department December 2008 Year 5 Progress and Year 6 Plans Year 5 – New ordinance has been reviewed and revised, but not adopted yet. Plan to adopt in 2013 or 2014. Year 6 – Will continue to monitor grading practices and ensure preliminary measures are in place. Plan to adopt new grading ordinance. Proposed Changes No GOAL #2 – Annually 2. Conduct annual internal training of City staff regarding stormwater permitting requirements for construction activities – to include training of Public Works which includes Construction Inspection, City Engineering, and Streets; Parks, Recreation, and Cultural Affairs (PRCA). Public Works MS4 Personnel Construction Inspection Personnel December 2007 – 2012 Year 5 Progress and Year 6 Plans Year 4 –MS4 Coordinator participated in training webcasts through the EPA and the MS4 conference. New training materials were purchased for the training of staff. Year 6 – Continue to integrate stormwater training into the routine training schedule for all regular city employees. MS4 coordinator plans on attending MS4 conference in 2013. Proposed Changes No proposed changes. GOAL #3 – Year 5 of the Permit 3. Develop budget for hiring additional personnel to conduct inspection and enforcement of construction site activities and applicable BMPs. Public Works December 2008 ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 37 Table 4-2 Construction Site Stormwater Runoff Control Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 Year 5 Progress and Year 6 Plans Year 5 –Poor outlooks on city revenue will delay the hiring of new staff. Existing staff reviewed proposed and installed BMP’s as time permitted. Year 6 – Evaluate staffing requirements as ordinance revisions are recommended. Existing staff reviews proposed and installed BMP’s as time permits. Proposed Changes Evaluate staffing needs. GOAL #4 – Year 1 of the Permit (Information evaluated annually) 4. Make available a guide of Best Management Practices (BMPs) of construction site controls. Guide may be available for purchase from the City or downloading off the web site by contractors and developers. Public Works City Engineering December 2007 Year 5 Progress and Year 6 Plans Year 5 – BMP information and other stormwater information continues to be made available at the Building Inspection Counter and at the online address: http://www.fmtn.org/city_government/public_ works/informational_documents.html Year 6 – Review the stormwater information on the City’s website to ensure information is relevant to stormwater goals. Revise site as new projects are constructed. Proposed Changes No. GOAL #5 – Year 5 of the Permit 5. Hire/Subcontract a Certified Construction Site Erosion Control Inspector to conduct construction site inspections. Public Works City Engineering December 2010 Year 5 Progress and Year 6 Plans Year 5 – No hiring of new personnel currently. Budget constraints will not allow for hiring currently. Existing staff reviewed proposed and installed BMP’s as time permitted. Year 6 – Evaluate staffing requirements as ordinance revisions are recommended. Existing staff reviews proposed and installed BMP’s as time permits. Proposed Changes Evaluate staffing needs. GOAL #6 – Annually ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 38 Table 4-2 Construction Site Stormwater Runoff Control Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 6. Conduct outreach and education to contractors, homebuilders, developers, and engineers about the new requirements. Construction Inspection Personnel; Public Works City Engineering or MS4 Personnel Ongoing 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – Staffed an informational booth at the San Juan County Builders Association’s Home Improvement and Building Expo in March 2013. Also provided stormwater construction brochures, recommended BMP specifications and resources for homebuilders and residents.. Attended NSPE meetings for water issues. MS4 coordinator and other engineers are always available a the city’s permitting counter to answer questions and offer guidance. Year 5 –Explore opportunities to reach out to contractors. Continue to offer brochures and be available at the permitting counter to offer help and advice. Proposed Changes No proposed changes. 1City of Farmington’s Stormwater Management Plan ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 39 5. POST-CONSTRUCTION STORMWATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT 5.1. Implementation Status Table 5-1 summarizes the status of the Post-Construction Stormwater Management in New Development and Redevelopment goals planned during this reporting period as well as the status on any goals where work has already begun in preparation for future deliverables. 5.2. Overall Compliance with Permit Conditions The measurable goals for the Post-Construction Stormwater Management in New Development and Redevelopment program area evaluate and revise staffing needs, ordinances, and processes as necessary to consider and address stormwater concerns after construction is complete. Goals also include education and outreach activities to help inform and prepare contractors. The City worked to achieve these goals. 5.3. Results of Information Collected and Analyzed During the Reporting Period The following sections provide information collected and analyzed during this reporting period. 5.3.1. Post-Construction Stormwater Runoff Control Ordinance The City will work to revise post BMP language in the city ordinances. 5.3.2. Stormwater Program Staffing An MS4 Coordinator was hired in October of 2007 to take the lead on the SWMP and implement the measurable goals. This Coordinator left in February of 2009. Ryan Gladden, an engineer with the City, is the acting MS4 coordinator. 5.3.3. Stormwater Construction Guidance The City of Farmington provided the following construction BMP guidance during this reporting period: ▪ BMP Guidance. In December of 2007, a new area was created on the City’s website for stormwater information. That site is reviewed annually to ensure the most relevant and up to date information is available. The site contains information on the SWMP as well as links to the USEPA’s National Menu of BMPs and guidance. The City’s stormwater site is located at the following link: http://www.fmtn.org/city_government/public_works/stormwater_management.html. ▪ Technical Specifications. The City Public Works continues to ensure the technical specifications contain effective BMP standards. The guide is posted on the City’s website and was made available at the Building Permit Counter. Online address: http://www.fmtn.org/city_government/public_works/informational_documents.html ▪ Brochures. The city uses space around the Building Permit Counter to post BMP information. The City of Farmington has also made the following brochures available at the Community Development and Building Permit counters when information is requested and this information is available on the stormwater site: ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 40 - Builder’s Stormwater Quick Reference Guide. This brochure was developed in March of 2008 by the City of Farmington and targets the construction industry and provides information on stormwater permit requirements, BMPs, the difference between erosion control and sediment control, and helpful BMP and resources. (Brochure is contained in Appendix B) - Does Your Construction Site Need a Stormwater Permit? A Construction Site Operator’s Guide to EPA’s Stormwater Permit Program, USEPA brochure (EPA 833-F-04-002, February 2004). - Reducing Stormwater Costs through Low Impact Development (LID) Strategies and Practices. USEPA Fact Sheet and Questions and Answers (EPA 841-F-07-006, December 2007) - The City has created some brochures mixing EPA information together on ways to prevent stormwater runoff pollution and information on how stormwater quality affects us. 5.3.4. Stormwater Construction Education & Outreach The City of Farmington promoted several stormwater educational activities during this reporting period. Promotions are summarized below. ▪ Informational Booths. The City of Farmington hosted a booth on March 2nd and 3rd of 2013, at the San Juan County Home Builders Association’s 18th Annual Home Improvement & Building Expo. The two-day event attracted local developers, builders, contractors, vendors, and residents interested in home improvements. The City’s booth contained stormwater educational information for the residential community and the construction industry. ▪ Educational Materials. The City of Farmington provided BMP guidance and technical specifications as well as informational brochures. See preceding section Stormwater Construction Guidance for more detail. ▪ Professional Associations. o National Society of Professional Engineers (NSPE). City of Farmington staff members actively participate with the local NSPE chapter, which meets once during lunch with an invited speaker. Two City staff members are currently officers in the local chapter and have helped to invite speakers whose topics are stormwater related. ▪ City Helpline – The City of Farmington’s Engineering Department is always ready to assist Contractors in the guidance of construction BMP’s. The engineering department frequently fields calls from contractors/builders for guidance. 5.3.5. Master Drainage Study The City of Farmington has hired HDR Engineering, Inc. to develop a master drainage study. The work includes development of a field-verified and updated storm drain map and geographic information system (GIS) database as well as hydraulic modeling and analyses of the storm drainage collection system. The Master Drainage Study is in its final review stage. Some scope has changed over the last year, with some areas being added to the study to provide a more complete result. 5.4. Activities Planned for the Next Reporting Cycle In the next reporting period, the City will continue work on reviewing existing ordinances to ensure they comply with MS4 requirements. The City will also continue to review BMPs and training ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 41 opportunities to determine if additional training or BMP updates are needed. Engineering staff will continue to review plans and give input with developers and builders about post BMP requirements and needs. The stormwater activities planned for the next reporting period are summarized in Table 5-1. 5.5. Proposed Changes The proposed changes for the Post-Construction Stormwater Management in New Development and Redevelopment goals are summarized in Table 5-1. The post BMP map/guide is being redesigned and will be reposted to the web when it is complete. 5.6. Permit Obligations The City of Farmington does not rely on another government entity to submit information necessary to satisfy permit obligations; however, the City of Farmington does cooperate with other local organizations to achieve some SWMP goals. For example, the City of Farmington works with the San Juan Homebuilders Association and San Juan College to provide information and updates to local builders and developers. 5.7. Inspections and Formal Enforcement Actions Under the City’s current plan review process, plan reviews are required for sites that disturb two or more acres and developers are required to build post-construction controls that maintain historic drainage levels. The Post-Construction Stormwater Management in New Development and Redevelopment program is progressing and still developing. It focuses on updating ordinances, training staff, acquiring resources, and educating local developers and builders. 5.8. Public Access, Review, and Comment Provisions Under the permit, the MS4 Annual Report is due October 1st of each year for the previous reporting period. The permit also requires a public comment period for at least thirty (30) days prior to the submission of the annual report. The City of Farmington met these requirements as described in the Public Meetings and Comment Periods paragraph of Section 1.3.1. No comments were made by the public prior to submittal. The Annual Report will be finalized and submitted to the permitting authority by October 1, 2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 42 Table 5-1 Post-Construction Stormwater Management in New Development and Redevelopment Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #1 – Year 5 of the Permit 1. Develop an ordinance addressing post- construction stormwater runoff control of construction sites greater than or equal to 1 acre. Public Works City Engineering; City Legal Department December 2008 Year 5 Progress and Year 6 Plans Year 5 – No work was completed on this ordinance during this reporting cycle. Year 6 – Plan to modify existing code relating to Post BMP’s. Proposed Changes No. As discussed in last year’s report: Due to a shortage in staffing, an ordinance was not completed. Will work towards this ordinance once the Illicit Discharge and Grading Ordinances have been adopted. GOAL #2 – Year 5 of the Permit 2. Develop a map/guide to existing successful post-construction stormwater controls within the City. Public Works City Engineering; Construction Inspection Personnel December 2008 Year 5 Progress and Year 6 Plans Year 5 - A map has been created but is currently being revised before reposting to the web. The city purchased new licensing with ARCGIS and plans use templates to upload this map to the City Website. Year 6 – Will recreate map using ARCGIS and post to web. Will continue to add to map as good BMP examples are used around town. Proposed Changes Yes propose to have final guide in year 5 of the permit. GOAL #3 – Year 1 of the Permit (Evaluated Annually.) 3. Make available a guide of Best Management Practices (BMPs) of structural and non-structural post-construction site controls. Public Works City Engineering September 2007 Year 5 Progress and Year 6 Plans Year 5 – Reviewed the stormwater information on the City’s website to ensure information is relevant to stormwater goals. Year 6 – Continue to review the stormwater information on the City’s website to ensure information is relevant to stormwater goals. Revise site as needed. Proposed Changes No ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 43 Table 5-1 Post-Construction Stormwater Management in New Development and Redevelopment Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #4 – Year 5 of the Permit 4. Hire/Subcontract with a Certified Construction Site Stormwater Inspector to conduct post- construction inspections. Public Works City Engineering December 2008 Year 5 Progress and Year 6 Plans Year 5 – City funding is still not adequate for hiring new personnel. Year 6 – Evaluate staffing requirements as ordinance revisions are recommended. Proposed Changes No proposed changes. GOAL #5 – Annually 5. Conduct outreach and education to contractors, homebuilders, developers, and engineers about the new post construction requirements. Construction Inspection Personnel; Public Works City Engineering Ongoing 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – Staffed an informational booth at the San Juan County Builders Association’s Home Improvement and Building Expo in March 2013. Also provided stormwater construction brochures, recommended BMP specifications and resources. Staff is available to interact with public. Posters demonstrating good BMP practices and information are posted near the Building Permit Counter. Year 6 – Continue to search for ways to communicate and reach out to builders. Explore partnership opportunities to learn how to better target each audience and provide useful and desirable information. Proposed Changes No proposed changes. GOAL #6 – Year 2 of the Permit 6. Begin work on a Master Drainage Study. Public Works City Engineering December 2008 ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 44 Table 5-1 Post-Construction Stormwater Management in New Development and Redevelopment Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 Year 5 Progress and Year 6 Plans Year 5 – The study is in the final review stage. The city has added some areas to the scope of the project that is undergoing further analysis. Year 6 – Plan to complete this next reporting period. Proposed Changes No proposed changes. GOAL #7 – Year 4 of the Permit 7. Identify potential retrofit of existing structural controls for enhanced pollutant removal within 18 months after completion of the Master Drainage Study. Public Works City Engineering July 2010 Year 5 Progress and Year 6 Plans Year 5 – Worked on Master Drainage Study. Year 6 – Continue to work towards completion of Master Drainage Study. Planned completion in year 6. Proposed Changes No proposed changes. 1City of Farmington’s Stormwater Management Plan ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 45 6. POLLUTION PREVENTION/GOOD HOUSEKEEPING FOR MUNICIPAL OPERATIONS 6.1. Implementation Status Table 6-2contains the status of the Pollution Prevention/Good Housekeeping for Municipal Operations Program goals planned during 2007 as well as the status on any goals where work has already begun in preparation for future deliverables. 6.2. Overall Compliance with Permit Conditions The measurable goals for the Pollution Prevention/Good Housekeeping for Municipal Operations program area include maintenance activities to keep stormwater drain inlets and lines free of debris and reduce dust generation from unpaved roads. Goals also focus attention on the MOC to identify pollution prevention and education opportunities that will improve the quality of stormwater leaving the facility. 6.3. Results of Information Collected and Analyzed During the Reporting Period The following sections provide information collected during this reporting period. 6.3.1. Street Sweeping The City’s street sweeping program sweeps paved city surfaces and properly disposes of collected debris. The sweeping program is fairly consistent and is not expected to deviate much from year to year. The city continued to sweep all streets (roughly 18,700 miles of paved surface). The total mileage swept includes regular sweeping at City parking lots, as shown in Table 6-1 Table 6-1 Street Sweeping at Municipal Parking Lots City Parking Lots Number of Times Swept During Reporting Period City Hall and City Annex 12 times City Police Department 12 times City Courthouse 12 times Downtown City Parking Lots 12 times MOC Parking Lots 12 times The table shows the routine sweeping that occurs once a month. Along with those sweepings, emergency sweepings were also performed over many streets within the City limits. In August 2010, wide spread flooding occurred over much of the city depositing sand and debris over streets and roads. City workers spent weeks cleaning and sweeping a good majority of many of the city’s streets. 6.3.2. Storm Drain Cleaning In January of 2008, the City of Farmington contracted with a third party to implement a video inspection and cleaning program. The total length of main lines inspected and cleaned is provided in Section 3 Illicit Discharge Detection and Elimination. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 46 The City’s Street Crew also inspects the city’s storm drains and crossing every spring and fall. Drains and inlets are cleaned as needed. The city also takes a pro-active approach to cleaning arroyos for the safe passage of water. The city has worked closely with the Army Corps of Engineers and FEMA to clean all arroyos and crossings since flooding in 2010 that deposited large amounts of sediment in drainage ways. 6.3.3. Dust Abatement Applications to Unpaved Roads Dust abatement applications were applied as needed to major unpaved roads within the City limits. There are approximately 32 miles of unpaved roads in Farmington. During the reporting period, there were approximately five applications for each unpaved road. 6.3.4. Municipal Operations Center Sampling and Operations Review The review from previous reports has been left in for historical information. New comments have been added at the end of this section 6.3.4. Operations at the City of Farmington’s Municipal Operations Center (MOC) are covered under the City’s MS4 Phase II permit. Baseline samples collected at MOC outfalls in February 2007 indicated elevated concentrations of specific conductivity and COD. (Sampling results are discussed in Section 3 Illicit Discharge Detection and Elimination and provided in Appendix As a result, the City began to review MOC operations and structural BMPs. The City of Farmington conducted an onsite visit at the MOC in February of 2007 to view operations areas and identify housekeeping improvements. Based on the visit, improvement opportunities were identified, and the following actions were taken: ▪ Swept paved surfaces and continued sweeping throughout the reporting period, ▪ Cleaned up and organized material storage areas, ▪ Removed trash from the yard and storm drain outlet areas, and ▪ Relocated several items to covered storage areas. Sampling results from MOC outfalls in August of 2007 showed improvements in specific conductance and COD but showed elevated concentrations of Aluminum and TSS. Two more site visits were was conducted on November 2, 2007 and January 16, 2008. The team reviewed onsite stormwater controls and discussed improvements for a planned parking lot upgrade project at the MOC. Approximately 1,660 feet of storm drain lines at the MOC were inspected via video camera in January and February 2008. Improvements were then added to the design package for the MOC parking lot upgrade project, which will be completed incrementally over the next few years as budget is available. The MOC parking lot redesign will improve overall site drainage, inlet designs, and add a berm or curb and gutter around the facility’s perimeter as a secondary control for stormwater management. The city will continue to focus on the importance of good housekeeping at the MOC. The results show improvements are taking place and the practices and goals set forth within the SWMP are having a positive effect. A planned installation of a salt storage facility at the MOC is still planned for future construction. The storage facility is expected to further decrease potential pollution. It is anticipated that the facility will allow for the gathering of potential contaminants that can be extracted and prevented from reaching the river. This was postponed due to budgetary constraints but is still planned as future construction. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 47 In the last report, the installation of storage for transformers and oil was discussed. These storage facilities are finishing the architectural phase and are planned to be built this reporting cycle. The current oil storage building is to be demolished and rebuilt without any drains where oil might find passage to the river. These improvements hope to make the MOC a cleaner environment and aid with maintaining clean stormwater from the site. 6.3.5. Stormwater Training for Municipal Employees The environmental coordinator for the MOC facilities instructs and holds annual training to employees concerning spills, cleaning, storing chemical, etc. The city has also purchased new material for training to share with MOC employees. 6.4. Activities Planned for the Next Reporting Cycle In the next reporting period, the City will continue to perform outfall sampling and implement current BMPs, such as dust abatement and drain cleaning activities. In addition, the City will focus on modifying operational procedures and providing stormwater training in municipal operations areas. 6.5. Proposed Changes Proposed changes to this program area are summarized in Table 6-2. 6.6. Permit Obligations The City of Farmington does not rely on another government entity to satisfy permit obligations. 6.7. Inspections and Formal Enforcement Actions Three site visits were conducted at the MOC. The first site visit was performed in February 2007; the second was performed in November of 2007; and the third was performed in January of 2008. City staff visits the MOC and maintains stormwater sampling from MOC outlets. Information gathered aids in decisions such as the storage facility construction and salt dome. The City’s Airport and Power Plant review their MSGP requirements and are at this time working to meet goals. They perform annual training on accidental spills prevents among other employee outreach. Additional inspections and reviews will be conducted at other City facilities covered under the MS4 permit to identify pollution prevention and good housekeeping opportunities. 6.8. Public Access, Review, and Comment Provisions Under the permit, the MS4 Annual Report is due October 1st of each year for the previous reporting period. The permit also requires a public comment period for at least thirty (30) days prior to the submission of the annual report. The City of Farmington met these requirements as described in the Public Meetings and Comment Periods paragraph of Section 1.3.1. No comments were made by the public prior to submittal. The Annual Report will be finalized and submitted to the permitting authority by October 1, 2013. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 48 Table 6-2 Pollution Prevention/Good Housekeeping Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #1 – Year 2 of the Permit 1. Develop written protocols for existing street sweeping and drain inlet cleaning programs. Continue these programs. Ruben Salcido Water/Wastewater Admin.; Jim Couch Streets December 2008 Year 5 Progress and Year 6 Plans Year 5– Performed street sweeping and drain inlet inspection regularly. Cleaning drains was performed as needed. Did not complete a written protocol. Waiting for Master Drainage plan to be completed. Year 6– Will Develop written protocol for inlet cleaning when the master drainage plan is completed. Proposed Changes No proposed changes. GOAL #2 – Annually 2. Continue storm drain cleaning program, with a percentage of storm drains cleaned each year. Include summary of efforts within Annual Report. Ruben Salcido Water/Wastewater Admin. Ongoing 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – Continued the camera inspection and cleaning program. Year 6 – Continue the camera inspection and cleaning program as needed. Proposed Changes No, the City is engaged in a master drainage study that will produce a field verified storm drain map and will determine percentage goals once the updated map is available. GOAL #3 – Annually 3. Continue dust abatement on non-paved roads on an as-needed basis. Jim Couch Streets Ongoing 2007 - 2012 Year 5 Progress and Year 6 Plans Year 5 – Dust abatement solution was applied to unpaved roads approximately five separate times during the year. There are approximately 32 miles of unpaved roads within the City. Year 6 – Continue to apply dust abatement as necessary. Proposed Changes No proposed changes. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 49 Table 6-2 Pollution Prevention/Good Housekeeping Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 GOAL #4 – Year 1 of the Permit (Propose rescheduling to Annually.) 4. Review and modify good housekeeping and structural Best Management Practices (BMPs) for the Municipal Operations Center (MOC). Review personnel training content and protocol. Britt Chestnut Environmental Coordinator; December 2007 Year 5 - Continued to evaluate MOC sampling results. Storage facility for road salt postponed due to budgetary constraints. See section 6.3.4. Year 6 – Continue to evaluate MOC sampling results and explore opportunities to improve good housekeeping procedures, employee training, and structural BMPs in an effort to improve water quality. Plan to install storage facility for road salt when budget allows. The City Electric Department is planning a building for electrical equipment, i.e. transformers and large equipment. Proposed Changes No, will continue to review MOC operations, training, and structural BMPs annually to determine if modifications or improvements are needed. GOAL #5 – Year 1 of the Permit 5. Continue to conduct quarterly stormwater sampling at MOC outfalls for 2 years (then re- evaluate). Include results in Annual Report. Public Works MS4 Personnel or Contractor Jan–Mar Apr–Jun Jul–Sep Oct–Dec 2007 2008 Year 5 Progress and Year 6 Plans Year 5 – A qualified contractor performed sampling last August. See section 3 for details. Year 6 – Continue to collect and analyze samples. Proposed Changes No – as discussed in 2008-2009 report, sampling has continued past the initial two years and is now taken semiannually with some areas of concern taken more frequently. See Section 3. GOAL #6 – Year 3 of the Permit 6. Ensure airport continues coverage under new Multi-Sector General Permit for Industrial Activities (MSGP) when re-issued. General Services Airport Manager (Ben Trujillo) To Be Determined (when MSGP is finalized) 2007 Year 5 Progress and Year 6 Plans Year 6 – The airport is under active coverage in the new MSGP. Proposed Changes No. GOAL #7 – Year 4 of the Permit ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 50 Table 6-2 Pollution Prevention/Good Housekeeping Program Area Status for Year 5, Planned Activities for Year 6, and Proposed Goal Changes Description of Goal Department/Personnel Responsible for Implementation Month in SWMP1 Year of Permit in SWMP1 7. Ensure power plants continue coverage under new MSGP when re-issued. City of Farmington Electric Utility Mike Sims/Britt Chestnut To Be Determined (when MSGP is finalized) 2007 Year 4 Progress Year 6 – The Animas and Bluffview Power Plants are on the newly issued MSGP. Proposed Changes No. GOAL #8 – Year 5 of the Permit 8. Obtain coverage for recycling center when new MSGP re-issued. Ruben Salcido Water/Wastewater Admin. Or Waste Management (depends on lease contract) To Be Determined (when MSGP is finalized) 2007 Year 3 Progress and Year 4 Plans Year 6 – Existing facility was replaced by a privately held Recycling facility. Proposed Changes No. GOAL #9 – Year 2 of the Permit (Propose rescheduling to Annually.) 9. Re-evaluate and modify (if necessary) routine training program for City personnel on pollution prevention and good housekeeping. Ryan Briggs Safety and Environmental Manager December 2008 Year 4 Progress and Year 5 Plans Year 5– Training is held annually for MOC facilities and MS4 coordinator. Year 6 – Training to be held for inspectors and other City personnel. Proposed Changes No. Will continue to work to get approval of stormwater training for all city employees. 1City of Farmington’s Stormwater Management Plan ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 51 This page left intentionally blank. ---PAGE BREAK--- ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 53 APPENDIX A PUBLISHED LEGAL NOTICES AND ANNOUNCEMENTS Appendix A contains notices and flyers used to announce public meetings and comment periods. Figure A-1 shows the notice that was published in the Farmington Daily Times in the legal section on Sunday, August 26th and Monday August 27th and September 2nd of 2013. It was also published on the Daily Times website at http://farmington.kaango.com/ad-public-notice-ofms4-annualreport- the-city-of-farmington-announces-the-availability-of-the-ms4-annual-report/21040652 Figure A-1. September 2013 Notice Published in the Farmington Daily Times. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 54 APPENDIX B EXAMPLE EDUCATIONAL PROMOTIONS Appendix B contains examples of educational promotions used in the stormwater program. Residential Promotions Figures B-1 through B-5 provide examples of residential promotions (B-5 contains both residential and construction information). Figure B-1. Flyers mailed with the April 2013 utility bills. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 55 Figure B-2. Xeriscape and Water Conservation Brochures. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 56 Figure B-3. Stormwater Promotions on City Buses. Red Apple Transit Buses Stormwater Bus Posters ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 57 Figure B-4. Stormwater Quality & How it Affects You Brochure. Front (Tri-fold) – Utility Flyer Mailing ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 58 Figure B-5. City of Farmington Stormwater Website. Address: http://www.fmtn.org/city_government/public_works/stormwater_management.html ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 59 Construction-Related Promotions Figures B-6 through B-8 provide examples of construction-related promotions. Figure B-6. City of Farmington’s Website with Technical Specifications and Recommended BMPs. Address: http://www.fmtn.org/city_government/public_works/informational_documents.html ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 60 Figure B-7. Builder’s Stormwater Quick Reference Guide Brochure. Front (Tri-fold) Back (Tri-fold) ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 61 Figure B-8. Stormwater Construction Brochures. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 62 Figure B-9. Posters Near Building Permit Counter ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 63 Figure B-10. Posters Near Building Permit Counter ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 64 This page left intentionally blank. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 65 APPENDIX C OUTFALL SAMPLING RESULTS SUMMARY ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 66 This page left intentionally blank. ---PAGE BREAK--- 10/01/12 MS4 Annual Report Page 67 Table Notes for Table C-1. The following notes pertain to Table C-1.  Benchmarks. The EPA benchmark values assist in evaluating stormwater impacts; however, they are not enforceable standards.  Shading. The following shades were used in table cells to highlight results higher than benchmark values. o Light Gold – Greater than benchmark value, but less than two times the benchmark value. o Dark Orange – More than two times greater than the benchmark value.  Acronyms: o COD – Chemical Oxygen Demand o E. coli – Fecal Coliform o NA – Not Analyzed o NE – Not Established o NM – Not Measured o NO3/NO2 – Nitrate/Nitrite o NS – Not Sampled o TSS – Total Suspended Solids o TKN – Total Kjeldahl Nitrogen  Normal Background Conditions: o Concentrations of TSS are indicative of soil sediments present in stormwater, and elevated TSS concentrations are typical in the arid Southwest. o Specific conductivity is generally found to be a good measure of the concentration of total dissolved solids (TDS) and salinity. Elements whose ionic forms contribute the most to these measures include: calcium (Ca2+), magnesium (Mg2+), sodium potassium bicarbonate (HCO3-), sulfate (SO42-), and chloride Elevated levels of specific conductivity are typical in the arid Southwest.  Precipitation Levels: o February 8, 2007 – 0 inches (significant snow melt) o July 11 and 12, 2007 – 0.15 inches o August 1 and 2, 2007 – 0.06 inches o August 27 and 28, 2007 – 0.23 inches o December 7 and 8, 2007 – 0.34 inches o March 17 and 18, 2008 – 0.06 inches o May 16, 2008 – 0.21 inches o September 8, 2008 – 0.24 inches o March 13, 2009 – 0.17 inches o April 2 – Dry Sampling o May 21, 2009 – Dry Weather Inspection o June 26, 2009 - 0.18 inches o Jan 19, 2010 – 0.23 inches o March 10, 2010 – 0.16 inches o September 22, 2010 – 0.49 inches o April 7, 2011 – 0.15 inches ---PAGE BREAK--- ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 69 FIELD DATA METALS – Lab Results NUTRIENTS – Lab Results ID Sample Location & Description Sampl e Date Flow Temperature DO pH Specif ic Cond uct‐ ance Aluminum Arsenic Cadmium Copper Iron Lead Nickel Zinc Selenium Mercury NO3/NO2 TKN NH3 Tota l Phos ‐ phor us TSS Oil & Gre ase COD Fecal E. coli (gpm) (ºC) (ºF) (pp m) (mS/c m) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L ) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/L) (mg/ L) (mg (mg (mg (cfu/10 0ml) (MPN/10 0ml) /(CFU/10 0mL) Benchmark Values 6.0‐ 9.0 <0.2 <0.75 <0.16854 <0.0159 <0.0636 <1.0 <0.081 6 <1.417 <0.117 0.2385 0.0024 NE NE NE NE <10 0 <15 <12 0 NE NE 1 Arroyo West of Lowe's Parking Lot 8‐Feb‐ 07 0 NO FLOW NOT SAMPLED NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED 12‐ Feb‐07 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 12‐Jul‐ 07 5 20.91 69. 64 7.2 9 7.99 0.523 2.07 0.00141 <0.00100 0.00969 1.56 0.0070 9 0.004 0.0503 NA NA <0.0500 1.03 0.0752 0.12 1 NA <1.0 0 <20 NA 1683 8‐Dec‐ 07 10 6.41 43. 5 NM 8.29 0.057 0.486 <0.00100 <0.00100 0.00917 0.409 0.0034 3 0.0014 1 0.0649 NA NA 0.19 0.809 0.216 <0.1 00 50.8 1.26 46.1 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 30‐Jul‐ 08 0 NO FLOW – Dry Weather Inspection NO FLOW – Dry Weather Inspection NO FLOW – Dry Weather Inspection 10‐ Sep‐08 30 16.3 61. 34 NM 7.04 0.61 0.35 0.00119 <0.0020 <0.0060 0.41 <0.005 0 <0.010 0.028 NA NA 0.14 <1.0 <0.50 0.15 80 1 23.6 1000 NA 13‐ Mar‐09 NM 10.29 50. 52 9.9 7.4 0.361 7.8 0.0095 <0.0020 0.056 5.1 0.029 0.018 0.4 NA NA <1.0 4.3 1.1 0.96 110 0 <5.0 390 NA NA 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 35.8 NM NM 4.9 3 7.96 0.383 15.6 0.008 <0.001 0.058 15.6 0.021 0.021 0.291 NA NA 1.6 <5.0 2.2 0.37 4 290 <5.2 252 NS NS 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 19‐Jan‐ 10 646.2 1.95 35. 51 16. 34 6.35 0.618 17 NA NA NA 18 NA NA 0.31 NA NA <1.0 1.5 <1.0 0.46 290 NA 200 18 10.9 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 19.03 66. 25 5.2 3 8.16 0.433 1.6 NA NA NA 1.5 NA NA 0.3 0.0014 <0.00020 3.3 12 2.5 0.65 320 NA 790 NA 1,732.9 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 13.2 14.59 58. 26 7.3 3 8.47 0.08 9.7 NA NA NA 7.1 NA NA 0.13 <0.001 <0.00020 <0.50 <5.0 1.1 0.25 8 110 NA 74.9 NA 866.4 15‐Jun‐ NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 70 11 14‐ Sep‐11 NM 16.9 62. 42 4.8 5 5.79 0.082 3.7 NA NA NA 3.2 NA NA 0.095 <0.0025 <0.00020 0.3 1.7 <1.0 0.16 9 83 <10. 0 39.1 NA 344.1 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 2 El Paso/ Middle Fork Square 8‐Feb‐ 07 10 10.27 50. 49 2.6 8 6.2 1.163 <0.0200 <0.00100 <0.00100 0.0131 0.153 <0.001 00 0.0102 0.035 NA NA NS NS NS NS 1.6 <1.0 <20 NA NA 12‐Jul‐ 07 7 22.01 71. 62 7.0 5 7.08 0.57 0.705 0.0013 <0.00100 0.0159 0.78 0.0068 1 0.0058 6 0.0531 NA NA <0.0500 0.838 <0.010 0 0.06 59 45.6 <1.0 0 <20 NA 1241.9 28‐ Aug‐07 3.5 19.32 66. 78 7.4 6 8.17 0.967 8.72 0.00474 <0.00100 0.0239 7.4 0.0277 0.0129 0.131 NA NA 0.435 2.74 0.0216 0.93 1,56 0 1.47 100 NA 2419.6 8‐Dec‐ 07 NM 7.51 45. 52 NM 7.84 0.561 5.4 0.00342 <0.00100 0.0231 5.08 0.0136 0.0086 4 0.16 NA NA 0.677 1.42 0.337 0.47 9 303 <1.0 0 102 NA NA 10‐ Mar‐08 <1 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection <1 NA 18‐ Mar‐08 1 9.28 48. 7 6.0 9 6.34 2.042 0.081 <0.001 <0.0020 <0.0060 0.26 <0.005 0 <0.010 0.037 NA NA 2.2 <1.0 <0.50 <0.0 50 <10 <5.0 6 <1 NA 2‐May‐ 08 5‐6 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 1 18.08 65. 54 5.2 5 7.94 1.951 0.052 <0.001 <0.0020 <0.0060 0.16 <0.005 0 <0.010 0.04 NA NA 1.9 <1.0 <0.50 <0.0 50 <10 <5.0 12 220 NA 30‐Jul‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Sep‐08 NM 16.9 62. 42 NM 7.1 0.724 0.71 0.00247 <0.0020 0.0092 0.98 0.01 <0.010 0.077 NA NA <1.0 <1.0 <0.50 0.56 270 <1 39.5 NA NA 13‐ Mar‐09 NM 9.16 48. 49 NM 7.11 0.894 4.1 0.0049 <0.0020 0.039 3.2 0.021 <0.010 0.25 NA NA 1.2 3.2 0.84 0.45 560 <0.5 0 250 NA NA 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM 18.43 65. 17 7.0 2 8.23 0.37 2.84 0.003 <0.001 0.011 2.68 0.01 0.003 0.061 NA NA <1.0 <1.0 <0.50 0.05 7 57 <5.2 29 NA NA 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 19‐Jan‐ 10 NM 1.63 34. 93 16. 82 6.34 0.889 29 NA NA NA 38 NA NA 0.52 NA NA <1.0 3.4 <1.0 1.1 1,50 0 NA 330 410 613.1 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 17.34 63. 21 5.0 4 8.73 0.302 1.3 NA NA NA 1.3 NA NA 0.3 0.001 <0.00020 0.87 5.6 <1.0 1.4 3,00 0 NA 280 3,800 15,531 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 11.05 51. 89 9.1 6 8.11 0.519 21 NA NA NA 18 NA NA 0.14 <0.001 <0.00020 0.51 <5.0 <1.0 0.45 3 420 NA 67.2 238 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 71 14‐ Sep‐11 0 16.87 62. 37 5.0 4 7.63 0.539 6.0 NA NA NA 6.6 NA NA 0.092 <0.0025 <0.00020 0.23 1.4 <1.0 0.15 8 280 NA 25.4 NA 1,300 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 3 Berg Park Location 8‐Feb‐ 07 20 12.05 53. 69 7.4 8 6.9 1.922 <0.0200 <0.00100 <0.00100 0.01 0.021 6 <0.001 00 0.0080 3 0.0223 NA NA NS NS NS NS <1.0 0 <1.0 <20 NA NA 12‐Jul‐ 07 1 22.58 72. 64 7.2 4 8.01 1.027 0.591 0.00123 <0.00100 0.00507 0.565 0.0040 9 0.0066 3 0.0277 NA NA 1.25 0.57 0.0166 0.03 69 35.2 <1.0 0 <20 NA 1,525.2 28‐ Aug‐07 0 20.92 69. 66 8.6 2 7.82 1.301 0.874 0.00128 <0.00100 0.0064 0.795 0.0043 7 0.0058 6 0.0832 NA NA 1.57 0.614 <0.010 0 0.07 44 117 2.21 32.8 NA 816.4 8‐Dec‐ 07 NM 8.63 47. 53 NM 7.89 0.299 1.06 0.00106 <0.00100 0.00706 1.09 0.0041 5 0.0023 7 0.0653 NA NA 0.781 0.965 0.336 <0.1 00 71 1.58 46.1 NA NA 10‐ Mar‐08 2‐3 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 4 NS 17‐ Mar‐08 5 12.82 55. 08 NM 6.86 1.615 0.037 <0.001 <0.0020 <0.0060 <0.05 0 <0.005 0 <0.010 <0.020 NA NA 3 <1.0 <0.50 <0.0 50 <10 <5.0 23 4200 NS 2‐May‐ 08 2‐3 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 2‐3 16.56 61. 81 6.6 4 8.38 0.915 0.023 <0.001 <0.0020 <0.0060 0.26 0.0061 <0.010 0.022 NA NA 1.3 <1.0 0.56 0.14 17 <5.0 12 23 NA 30‐Jul‐ 08 1‐3 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Sep‐08 50 18.5 65. 3 NM 7.15 0.59 0.44 0.00205 <0.0020 0.0081 0.39 0.0077 <0.010 0.065 NA NA 1 2.1 0.56 0.75 94 2 43.6 NA NA 13‐ Mar‐09 NM 11.3 52. 34 8.2 9 7.04 1.199 1.9 0.0018 <0.0020 0.012 1.2 <0.005 0 <0.010 0.055 NA NA 2.5 1.7 <0.50 0.19 48 <12 66 NA NA 21‐ May‐ 09 1 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM 20.25 68. 45 4.5 3 7.55 0.694 1.85 0.003 <0.001 0.012 1.62 0.004 0.003 0.047 NA NA 1.5 1.3 <0.50 0.10 9 24 <5.2 48 NA NA 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 6.24 43. 23 11. 23 8.23 0.618 21 NA NA NA 25 NA NA 0.24 <0.0025 <0.00020 <1.0 <5.0 <1.0 0.71 790 NA NA 800 1,296 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 240 313 22‐ Sep‐10 NM 18.51 65. 32 4.3 8 6.91 0.139 0.72 NA NA NA 0.61 NA NA 0.081 <0.0010 <0.00020 0.38 2 <1.0 0.31 1,20 0 NA 85 4,500 6,867 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ May‐ 11 14.68 58. 42 8.4 4 8.02 0.300 5 NA NA NA 4.5 NA NA 0.11 <0.0025 <0.00020 0.63 2.8 <1.0 0.32 120 NS 89 NS NS 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 14‐ 0 18.52 65. 5.3 7.62 0.614 2.2 NA NA NA 1.7 NA NA 0.055 <0.0025 <0.00020 0.83 <1.0 <1.0 0.10 52 <10. 107 NA >2419.6 ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 72 Sep‐11 34 7 5 0 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 4 MOC ‐ Sewer Outfall # 1 8‐Feb‐ 07 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 12‐ Feb‐07 1 5.01 41. 02 5.7 5 9.13 13.88 0.367 0.012 <0.00100 0.0139 0.876 0.0059 8 0.0045 3 0.0655 NA NA NS NS NS NS 42 <1.0 193 NA NA 12‐Jul‐ 07 0 NO FLOW NOT SAMPLED NO FLOW – NOT SAMPLED NO FLOW – NOT SAMPLED 2‐Aug‐ 07 5 29.59 85. 26 4.1 8.32 0.078 0.811 <0.00100 <0.00100 0.0125 0.826 0.0126 0.0026 9 0.0988 NA NA 0.814 20.1 1.09 2.22 250 12.2 162 NA NA 8‐Dec‐ 07 20 8.5 47. 3 NM 7.69 1.456 0.563 0.00493 <0.00100 0.00751 0.387 0.0012 2 0.0014 3 0.0522 NA NA 0.635 0.92 0.259 <0.1 00 11.2 1.05 31.2 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 30‐Jul‐ 08 0 NO FLOW – Dry Weather Inspection NO FLOW – Dry Weather Inspection NO FLOW – Dry Weather Inspection 10‐ Sep‐08 1.5 17.4 63. 32 NM 7.15 0.451 0.7 0.00332 <0.0020 0.018 0.72 0.0067 <0.010 0.14 NA NA 1 2.5 0.98 0.33 49 5 210 NA NA 13‐ Mar‐09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 1.6 9.53 49. 15 9.9 1 8.31 2.077 2.9 NA NA NA 3.2 NA NA 0.074 0.0035 <0.00020 <2.0 1.3 <1.0 0.18 42 NA 42 NA NA 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 18.45 65. 21 4.2 9 7.8 0.257 0.66 NA NA NA 0.59 NA NA 0.075 <0.0010 <0.00020 1.4 1.5 <1.0 0.19 110 NA 79 NA NA 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ May‐ 11 14.86 58. 75 10. 28 8.04 0.589 13 NA NA NA 10 NA NA 0.25 <0.0025 <0.00020 0.63 3.8 <1.0 0.42 250 <5.0 160 NA NA 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 73 14‐ Sep‐11 0 17.25 62. 05 5.1 7 7.83 0.75 11 NA NA NA 13 NA NA 0.16 <0.0025 <0.00020 0.39 1.8 <1.0 0.16 3 190 <10. 0 47.6 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 5 MOC ‐ Sewer Outfall # 2 8‐Feb‐ 07 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 12‐ Feb‐07 5 7.12 44. 82 4.7 9 9.62 1.224 0.355 0.00145 <0.00100 0.00559 0.477 0.0026 8 0.0022 0.019 NA NA NS NS NS NS 24 <1.0 47.2 NA NA 12‐Jul‐ 07 0 NO FLOW NOT SAMPLED NO FLOW – NOT SAMPLED NO FLOW – NOT SAMPLED 2‐Aug‐ 07 5 30.96 87. 73 5.8 9 8.03 0.692 1.09 0.00161 <0.00100 0.0215 1.07 0.0082 0.0027 3 0.0962 NA NA 1.1 2.61 1.05 0.20 2 109 2 119 NA NA 8‐Dec‐ 07 2 7.53 45. 55 NM 8.17 0.054 0.758 <0.00100 <0.00100 0.00374 0.634 0.0104 0.0010 4 0.0402 NA NA 0.153 1 0.0687 0.13 2 25 1.68 50.2 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 30‐Jul‐ 08 0 NO FLOW – NOT SAMPLED NO FLOW – NOT SAMPLED NO FLOW – NOT SAMPLED 10‐ Sep‐08 5 18.2 64. 76 NM 7.12 0.386 0.8 0.00217 <0.0020 0.032 0.54 0.021 <0.010 0.2 NA NA 1.05 2.9 1.1 0.8 77 10 116 NA NA 13‐ Mar‐09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 96 20.24 68. 43 4.4 1 7.87 0.498 9.06 0.006 <0.001 0.045 8.58 0.018 0.013 0.224 NA NA 1.5 5.6 1.8 0.46 3 98 <5.3 284 NA NA 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 243.2 8.94 48. 09 9.8 4 8.15 5.428 13 NA NA NA 15 NA NA 0.17 0.0044 <0.00020 <10 1.5 <1.0 0.3 510 NA 400 NA NA 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 19.09 66. 36 5.4 2 6.83 0.115 0.7 NA NA NA 0.95 NA NA 0.1 <0.0010 <0.00020 0.16 2 <1.0 0.47 360 NA 160 NA NA 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 13.3 55. 94 7.5 7 8.26 0.424 14 NA NA NA 13 NA NA 0.19 <0.001 <0.00020 <0.50 <5.0 <1.0 0.58 3 230 NA 103 NA NA 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 74 14‐ Sep‐11 0 17.89 64. 2 5.4 7.83 0.213 3.7 NA NA NA 4.0 NA NA 0.12 <0.0025 <0.00020 <1.0 2.1 <1.0 0.32 9 130 <10. 0 66.7 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 6 MOC ‐ Sewer Outfall # 3 8‐Feb‐ 07 0 NOT SAMPLED – DRY WEATHER INSPECTION NOT SAMPLED – DRY WEATHER INSPECTION NOT SAMPLED – DRY WEATHER INSPECTION 12‐Jul‐ 07 0 NOT SAMPLED – DRY WEATHER INSPECTION NOT SAMPLED – DRY WEATHER INSPECTION NOT SAMPLED – DRY WEATHER INSPECTION 2‐Aug‐ 07 50 29.89 85. 8 5.8 7.98 0.715 1.28 0.00192 <0.00100 0.0234 1.21 0.0087 4 0.0030 9 0.101 NA NA 1.13 2.41 1.04 0.21 8 91 1.05 126 NA NA 8‐Dec‐ 07 2 8.36 47 NM 8.22 0.065 1.11 <0.00100 <0.00100 0.0121 1.0 0.0068 1 0.0015 2 0.0712 NA NA 0.152 0.791 0.167 0.13 2 51 1.26 31.2 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 <1 5.52 41. 9 5.6 1 6.91 0.329 0.75 <0.001 <0.0020 0.02 0.59 0.0055 <0.010 0.16 NA NA 1.6 2.1 0.8 0.27 34 5.4 93 5 NA 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 30‐Jul‐ 08 0 NO FLOW Dry Weather Inspection NO FLOW Dry Weather Inspection NO FLOW – Dry Weather Inspection 10‐ Sep‐08 1 17.4 63. 32 NM 7.03 0.419 0.43 0.00151 <0.0020 0.019 0.49 <0.005 0 <0.010 0.11 NA NA 0.94 1.8 <0.50 0.31 28 1 102 NA NA 13‐ Mar‐09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 NM 6.73 44. 11 11. 56 8.64 0.367 6.9 NA NA NA 7.0 NA NA 0.12 <0.0025 <0.00020 1.1 <1.0 <1.0 0.19 120 NA 120 NA NA 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 18.27 64. 89 5.2 8 6.56 0.102 0.64 NA NA NA 0.6 NA NA 0.053 <0.0010 <0.00020 0.18 <1.0 <1.0 0.13 100 NA 68 NA NA 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ May‐ 11 13.8 56. 84 9.7 5 8.39 0.135 7.4 NA NA NA 5.7 NA NA 0.17 <0.0025 <0.00020 <0.50 3.1 <1.0 0.51 100 <5.0 200 NA NA 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry NOT SAMPLED – Dry ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 75 Weather Inspection Weather Inspection 14‐ Sep‐11 0 17.89 64. 2 4.7 4 7.94 0.115 3.8 NA NA NA 3.8 NA NA 0.097 <0.0025 <0.00020 <1.0 1.5 <1.0 0.27 3 110 <10. 0 22.7 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7 Murray Dr. Bridge Settling Pond 8‐Feb‐ 07 10 9.61 49. 3 6.7 2 7 1.244 <0.0200 <0.00100 <0.00100 0.00772 0.020 2 <0.001 00 0.0021 9 <0.010 0 NA NA NS NS NS NS <1.0 0 <1.0 <20 NA NA 12‐Jul‐ 07 5 23.59 74. 46 6.8 7.14 0.502 1.98 <0.00100 <0.00100 0.0129 1.24 0.0041 6 0.0041 0.0443 NA NA 0.156 0.58 <0.010 0 0.08 15 91.6 <1.0 0 <20 NA 406.8 8‐Dec‐ 07 50 8.26 46. 87 NM 8.05 0.15 5.67 0.00226 <0.00100 0.0302 5.46 0.0133 0.0063 6 0.158 NA NA 0.961 1.06 0.294 0.35 8 220 1.68 87.7 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 2‐May‐ 08 5 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ May‐ 08 5‐6 11.81 53. 26 NM 8.88 0.467 0.44 <0.001 <0.0020 <0.0060 0.48 <0.005 0 <0.010 0.41 NA NA <1.0 <1.0 <0.50 0.11 13 <5.0 10 37 NA 30‐Jul‐ 08 3 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Sep‐08 1 17.4 63. 32 NM 7.03 0.419 0.41 0.00119 <0.0020 0.016 0.49 0.0081 <0.010 0.061 NA NA 1.2 1.5 <0.50 0.38 73 <2 35.2 NA NA 13‐ Mar‐09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 153.1 19.51 67. 12 4.6 4 7.77 0.319 1.21 0.002 <0.001 0.012 1.23 0.007 0.002 0.048 NA NA <1.0 <1.0 <0.50 0.05 35 <5.4 16 NA NA 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 0‐Jan‐ 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 8 South Side Lift Station # 2 8‐Feb‐ 07 1 6.2 43. 16 7.5 9 7.7 1.592 0.342 <0.00100 <0.00100 0.0192 0.476 0.0021 8 0.0046 6 0.0292 NA NA NS NS NS NS 22.8 <1.0 32.9 NA NA 8‐Dec‐ 07 200 8.34 47. 01 NM 8.12 0.119 1.62 0.00148 <0.00100 0.0107 1.21 0.0065 4 0.0022 7 0.105 NA NA 0.645 1.31 0.318 0.25 83.3 1.58 64 NA NA 17‐ Mar‐08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 16‐ May‐ 08 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 10‐ Sep‐08 50 20.2 68. 36 NM 7.25 0.52 0.79 0.00357 <0.0020 0.014 0.88 0.015 <0.010 0.1 NA NA 1.2 3.6 0.7 0.46 250 <2 114 NA NA 13‐ Mar‐09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 76 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 0‐Jan‐ 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Cannery Court Location 8‐Feb‐ 07 40 11.12 52. 02 8.4 4 7.2 2.119 0.142 <0.00100 <0.00100 0.0106 0.147 <0.001 00 0.0077 9 <0.010 0 NA NA NS NS NS NS 6 <1.0 <20 NA NA 27‐ Aug‐07 1 22.71 72. 88 6.2 4 7.58 0.301 3.09 0.00214 <0.00100 0.0174 3.01 0.0205 0.0056 2 0.206 NA NA 0.569 1.66 0.585 0.28 2 150 1.58 113 NA NA 8‐Dec‐ 07 200 8.18 46. 72 NM 8.25 0.108 1.85 0.00165 <0.00100 0.00941 1.91 0.0067 4 0.0025 2 0.0907 NA NA 0.645 1.03 0.317 0.20 3 129 2.53 55.7 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 2 11.92 53. 46 5.8 1 6.76 2.05 0.086 <0.001 <0.0020 <0.0060 0.14 <0.005 0 <0.010 <0.020 NA NA 3.4 <1.0 <0.50 <0.0 50 <10 <5.0 <1 700 NA 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 30‐Jul‐ 08 <1 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Sep‐08 50 19.4 NM 7.2 2.54 0.19 <0.001 <0.0020 <0.0060 0.26 <0.005 0 <0.010 <0.020 NA NA 2.1 <1.0 0.12 20 <1 44.7 NA NA 13‐ Mar‐09 NM 9.05 48. 3 10. 55 7.48 0.371 5.3 0.0037 <0.0020 0.026 3.9 0.02 <0.010 0.15 NA NA <1.0 2.7 <0.50 0.33 210 <5.9 120 NA NA 21‐ May‐ 09 1 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 SUBMER GED 21.64 70. 95 4.6 3 7.77 1.441 1.56 0.003 <0.001 0.009 1.43 0.004 0.003 0.03 NA NA 2.6 1.3 <0.50 0.05 7 41 <5.1 43 NA NA 23‐ Sep‐09 SUBMER GED NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 180 NA 22‐ Dec‐09 SUBMER GED NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 19‐Jan‐ 10 SUBMER GED 9.37 48. 87 9.4 7 6.91 1.469 0.15 NA NA NA 0.22 NA NA 0.015 NA NA 3.7 <1.0 <1.0 <0.1 0 <10 NA 27 NS 272.3 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 20.34 68. 61 5.5 1 8.55 0.328 1.1 NA NA NA 1.2 NA NA 0.23 <0.0010 <0.00020 0.88 3.4 <1.0 0.29 600 NA 180 NA 5,475 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 9.89 49. 8 8.9 3 8.49 0.104 9.8 NA NA NA 8.5 NA NA 0.16 <0.001 <0.00020 <0.50 <5.0 <1.0 0.43 7 200 NA 77.2 NA 548 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐11 0 27.41 81. 34 5.8 8.17 0.376 2.8 NA NA NA 2.4 NA NA 0.19 <0.050 <0.00020 1.1 3.9 1.8 0.39 250 NA 210 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 77 10 Intersectio n of Gooding/ Riverview 8‐Feb‐ 07 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 12‐ Feb‐07 0 NO FLOW NOT SAMPLED NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED 2‐Aug‐ 07 100 25.27 77. 49 4.8 9 8.22 0.488 1.98 0.00149 <0.00100 0.0117 1.7 0.0166 0.0040 1 0.0762 NA NA 0.319 1.07 0.0612 0.22 3 439 <1.0 0 65.5 NA NA 8‐Dec‐ 07 0 NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED NO FLOW NOT SAMPLED 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 2‐May‐ 08 5 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 11 City Sports Complex Baseball Fields on Pinon Hills (Inlet of 30‐inch North HDPE Pipe) 8‐Feb‐ 07 NOT SAMPLED – DRY WEATHER INSPECTION NOT SAMPLED – DRY WEATHER INSPECTION NOT SAMPLED – DRY WEATHER INSPECTION 2‐Aug‐ 07 2 27.01 80. 62 5.2 7 8.06 0.791 0.996 0.00117 <0.00100 0.00968 0.97 0.0012 0.0042 3 0.0115 NA NA 3.37 2.65 0.421 0.69 620 <1.0 0 101 NA NA 27‐ Aug‐07 2 20.51 68. 92 7.6 9 8.28 0.11 4.24 0.00166 <0.00100 0.021 3.88 0.0192 0.0071 2 0.119 NA NA 0.583 1.61 0.62 0.96 1,99 0 1.58 98.2 NA NA 8‐Dec‐ 07 10‐15 5.67 42. 21 NM 8.7 0.118 4.72 0.00119 <0.00100 0.00865 3.7 0.0043 6 0.0032 5 0.041 NA NA 0.597 0.611 0.196 0.37 6 253 <1.0 0 27.1 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 0 NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 30‐Jul‐ 08 0 NO FLOW – Dry Weather Inspection NO FLOW – Dry Weather Inspection NO FLOW – Dry Weather Inspection 10‐ Sep‐08 0.1 NOT ENOUGH TO SAMPLE NOT ENOUGH TO SAMPLE NOT ENOUGH TO SAMPLE 13‐ Mar‐09 4 8.24 46. 83 11. 85 7.3 0.139 2.2 0.0052 <0.0020 0.018 1.9 0.0091 <0.010 0.052 NA NA <1.0 1.7 <0.50 1.6 150 0 <5.0 63 NA NA 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 82.5 8.35 47. 03 11. 46 9.83 0.292 20 NA NA NA 23 NA NA 0.12 <0.0025 <0.00020 4.5 <2.0 <1.0 0.75 760 NA <10 NA NA 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 16.42 61. 56 5.9 9 8.86 0.146 2.0 NA NA NA 0.95 NA NA 0.048 0.0017 <0.00020 8.4 2.8 <1.0 1.9 3,90 0 NA 120 NA 3,130 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 20.76 8.55 47. 39 9.0 8.72 0.082 78.0 NA NA NA 85 NA NA 0.23 <0.001 <0.00020 <5.0 <5.0 <1.0 1.42 1,50 0 NA 54.4 NA NA 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 14‐ Sep‐11 0 14.37 57. 87 6.4 7.83 0.101 44.0 NA NA NA 54 NA NA 0.17 <0.0025 <0.00020 <1.0 1.8 <1.0 0.63 9 1,80 0 <10. 0 14.5 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 78 Dec‐11 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 12 City Sports Complex Baseball Fields on Pinon Hills (Outlet of 30‐inch South HDPE Pipe) 8‐Feb‐ 07 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 2‐Aug‐ 07 1.5 26.92 80. 46 4.1 8 8.04 0.693 0.534 0.00112 <0.00100 0.0095 0.509 <0.001 00 0.0041 7 0.0223 NA NA 3.57 1.88 0.268 0.07 1 27.6 <1.0 0 70.5 NA NA 27‐ Aug‐07 60 21.4 70. 52 6.5 2 7.63 0.179 2.79 0.00172 <0.00100 0.00686 3.43 0.0030 8 0.0029 4 0.0775 NA NA 0.502 0.994 0.271 0.18 7 152 1.68 108 NA NA 8‐Dec‐ 07 10 5.84 42. 51 NM 8.31 0.09 0.433 <0.00100 <0.00100 0.00173 0.354 <0.001 00 <0.001 00 0.0178 NA NA 0.455 0.483 0.187 <0.1 00 50.9 1.89 <20. 0 NA NA 10‐ Mar‐08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 17‐ Mar‐08 0 NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED 2‐May‐ 08 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 13 Glade Arroyo Culvert on South Side of Navajo St. 8‐Feb‐ 07 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 12‐ Feb‐07 0 NO FLOW NOT SAMPLED NO FLOW ‐ NOT SAMPLED NO FLOW ‐ NOT SAMPLED 2‐Aug‐ 07 >1,000 26.66 79. 99 5.7 3 8.02 0.275 3.57 0.00468 <0.00100 0.0202 4.16 0.0249 0.008 0.194 NA NA 0.877 3.51 0.626 0.68 7 543 <1.0 0 186 NA NA 8‐Dec‐ 07 500 8.11 46. 6 NM 8.19 0.693 0.755 0.00109 <0.00100 0.00406 0.866 0.0023 5 0.0031 0.0359 NA NA 0.396 0.549 0.0595 <0.1 00 25.2 <1.0 0 37.9 NA NA 10‐ Mar‐08 <1 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Mar‐08 3 8.19 46. 7 NM 6.59 1.245 0.086 <0.001 <0.0020 <0.0060 0.34 <0.005 0 <0.010 <0.020 NA NA 0.4 <1.0 <0.50 <0.0 50 <10 <5.0 <1 <1 NA 2‐May‐ 08 1‐2 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 30‐Jul‐ 08 4‐7 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Sep‐08 200 17 NM 7.25 0.886 0.99 0.00304 <0.0020 <0.0060 0.73 0.0097 <0.010 0.038 NA NA <1.0 1.5 1.4 290 <2 23.2 NA NA 13‐ Mar‐09 60 8.66 47. 59 12. 06 7.59 0.629 2.7 0.0022 <0.0020 0.014 2.2 0.015 <0.010 0.16 NA NA 2.1 2.7 1.3 0.15 100 <5.3 170 NA NA 21‐ May‐ 09 0 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 5.89 42. 6 12. 57 10.3 0.611 11 NA NA NA 12 NA NA 0.18 <0.0025 <0.00020 <1.0 1.3 <1.0 0.3 540 NA 200 1,100 1,565 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 18.02 64. 44 5.2 2 8.77 0.187 0.8 NA NA NA 0.89 NA NA 0.26 <0.0010 <0.00020 0.67 2.4 <1.0 0.35 260 NA 170 2,700 1,483 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 79 7‐Apr‐ 11 10.11 50. 2 9.1 2 8.17 0.304 8.0 NA NA NA 7.1 NA NA 0.21 0.00106 <0.00020 0.7 <5.0 <1.0 0.25 1 150 NA 221 NA 10 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐11 0 24.03 75. 25 6.3 3 6.87 4.796 7.7 NA NA NA 5.9 NA NA 0.48 <0.050 <0.00020 13 3.4 <1.0 0.24 150 NA 120 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 14 S. of Murray (Sweetland ) 30‐Jul‐ 08 5 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Sep‐08 500 18.4 NM 7.25 0.721 1.7 0.00574 <0.0020 0.013 1.4 0.015 <0.010 0.078 NA NA <1.0 2.1 1.3 690 <1 70.5 43,000 NA 13‐ Mar‐09 NM 8.67 47. 61 11. 56 7.15 1.016 2 0.0032 <0.0020 0.014 1.8 0.012 <0.010 0.068 NA NA 1.4 2.4 <0.50 0.21 190 <5.0 110 NA NA 21‐ May‐ 09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 NM 22.41 72. 34 5.2 1 8.16 0.837 0.51 0.003 <0.001 0.007 0.55 0.002 0.002 0.023 NA NA <1.0 2.1 <0.50 0.05 4 <10 <5.2 85 NA NA 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ Mar‐10 3.91 39. 04 19. 58 9.71 0.733 6.70 NA NA NA 6.7 NA NA 0.11 <0.0025 <0.00020 <1.0 1.4 <1.0 0.31 280 NA <10 4,900 579.4 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 6,909 9,208 20‐ Sep‐10 NM 22.71 72. 88 7.0 2 7.94 0.591 3.90 NA NA NA 4.20 NA NA 0.36 <0.005 <0.00020 1.0 9.0 <1.0 3.39 5,30 0 NA 81 NA >2419.6 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 9.66 49. 39 8.6 4 8.05 0.487 23.0 NA NA NA 22.0 NA NA 0.19 0.00115 <0.00020 0.5 5.6 <1.0 0.73 7 820 NA 90.5 NA 816.4 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐11 0 26.21 79. 18 6.6 2 7.82 0.743 6.30 NA NA NA 4.6 NA NA 0.067 <0.050 <0.00020 <1.0 1.1 <1.0 0.12 220 NA 87 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 15 S. Butler 30‐Jul‐ 08 5 NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 10‐ 20 22 NM 7.25 0.886 0.72 0.00158 <0.0020 0.027 0.74 0.012 <0.010 0.14 NA NA 1.5 2.7 0.53 61 2.4 63.3 54,000 NA ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 80 Sep‐08 13‐ Mar‐09 180 9.47 49. 05 10. 3 7.18 0.709 4.5 0.0035 <0.0020 0.024 3 0.015 <0.010 0.15 NA NA 1.4 3.4 0.7 0.43 230 <5.0 140 NA NA 21‐ May‐ 09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 26‐Jun‐ 09 391.9 21.74 71. 13 4.1 7.7 0.985 2.2 0.003 <0.001 0.016 1.94 0.006 0.004 0.063 NA NA 1.5 2.8 0.37 3 30 <5.4 121 NA NA 23‐ Sep‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 31 NA 22‐ Dec‐09 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NS NS NOT SAMPLED – Dry Weather Inspection 19‐Jan‐ 10 394.3 4.86 40. 75 13. 09 6.73 0.499 11 NA NA NA 11 NA NA 0.23 NA NA 1 2.8 <1.0 0.49 310 NA 180 126 151.5 24‐ Mar‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐Jun‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 24‐ Aug‐10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 22‐ Sep‐10 NM 21.96 71. 53 4.8 7 7.79 1.187 0.45 NA NA NA 0.43 NA NA 0.07 0.002 <0.00020 2.8 2.8 <1.0 0.17 160 NA 180 270 613.1 9‐Dec‐ 10 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 7‐Apr‐ 11 NM 10.21 50. 38 8.8 6 8.39 0.169 8.9 NA NA NA 7.7 NA NA 0.15 <0.001 <0.00020 0.52 <5.0 <1.0 0.47 9 170 NA 93.3 NA 1553.1 15‐Jun‐ 11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 25‐ Aug‐11 0 29.06 84. 31 5.8 5 8.35 8.082 4.5 NA NA NA 4.1 NA NA 0.20 <0.050 <0.00020 1.3 3.9 1.4 0.74 340 NA 170 NA NA 27‐ Sep‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 27‐ Dec‐11 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 21‐Jun‐ 12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 18‐ Sep‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection 16 Airport Detention Pond 13‐ Mar‐09 2 8.39 47. 1 9.4 7 7.26 1.332 0.52 0.0019 <0.0020 0.011 0.58 0.0061 <0.010 0.10 NA NA 2.3 1.8 <0.50 <0.1 0 61 <5.0 63 NS NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 17 Brookside/ Auburn & Boyd 13‐ Mar‐09 NM 8.7 47. 66 8.8 7 7.2 0.801 0.53 0.0017 <0.0020 0.0099 0.51 <0.005 0 <0.010 0.042 NA NA <1.0 1.3 <0.50 <0.1 0 38 <5.0 51 NS NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 18 Carwash/ Dustin & 20th 13‐ Mar‐09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 19 Vine‐East of Butler 2‐Apr‐ 09 NM NM NM NM NM NM NM NM NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS <10 NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS ---PAGE BREAK--- City of Farmington 10/01/12 MS4 Annual Report Page 81 20 Vine at Irrigation (Manhole) 2‐Apr‐ 09 NM NM NM NM NM NM NM NM NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS 9 NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 21 Pinon/Ced ar (Manhole) 2‐Apr‐ 09 NM NM NM NM NM NM NM NM NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS <10 NS 26‐Jun‐ 09 NM NM NM NM NM NM NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 22 Civitan Pond Outlet 13‐Jul‐ 11 18.21 64. 78 4.6 4 7.5 1.936 0.25 NA NA NA 0.61 NA NA 0.024 0.0048 <0.00020 1.9 <1.0 <1.0 0.11 7 50 <1.0 14.7 NA 866.4 25‐ Aug‐11 74.88 24.55 76. 19 4.5 9 8.07 0.859 1.1 NA NA NA 0.89 NA NA 0.065 <0.050 <0.00020 1.4 2.2 <1.0 0.19 28 NA 120 NA NA 23 Travel Lodge/Bro okside Park 16‐ Mar‐12 NM NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NOT SAMPLED – Dry Weather Inspection NA= Not Analy zed NS= Not Sampled * 9/20/10 Outfall 14 S. of Murray (Sweetland) sample was analyzed at Hall Environmental and run for ecoli enumeration b/c OMI was unable to analyze the collected sample. * 4/7/11 Run at Hall for ecoli enumeration. Value reported in CFU/100 mL ---PAGE BREAK--- ---PAGE BREAK--- City of Farmington 10/01/10 MS4 Annual Report Page 83