Full Text
Farmington Metropolitan Planning Organization Federal Fiscal Year 2016-2021 Transportation Improvement Program (TIP) ---PAGE BREAK--- Farmington MPO Rec Num: 3 CN: F100091 Lead Agency: City of Aztec Est. Letting: Proj East Arterial Route Phase II Fr: Current end of Legion Rd To: NM 173 Project Desc.: Construct remaining road section from end of Phase I to NM 173 including a detached multi-use pedestrian path. Utility work consisting of a 10- inch water line will be constructed for the entire length of the project. Est. Proj. Cost: $7,319,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Capacity Proj Remarks: Legion Rd added to the FFY2014-2019 TIP through Amendment #4 (approved January 16,2014), Removed Legion Rd from TIP per amendment #6 to FFY 2014-2019 TIP on 8.21.14 substituted Phase II of East Arterial Route. 2.13.15 reworded scope of work to include pedestrian path and utility work (10" water line). Mod #16 Moved $1M from StateSevTax funds PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100091 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,990,400 $2,990,400 $7,319,750 $2,819,750 $4,500,000 Totals $0 $0 State Match $509,600 $509,600 Local Match $2,819,750 $2,819,750 Severance Tax $1,000,000 $1,000,000 Local Non-Match 01 15 17 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 1 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 42 CN: F100100 Lead Agency: City of Farmington Est. Letting: Proj East Pinon Hills Boulevard Extension Phase I Fr: NM 516 (E.Main) To: Hubbard Project Desc.: Includes earthwork, asphalt, street lighting, drainage improvements and signalization upgrades. Est. Proj. Cost: $3,950,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 FL4356 Length: 0 Category: Capacity Proj Remarks: Amendment #9 (Dec 1, 2014) includes describing Phase II ($14,250,000 - Hubbard to CR 3000 & Phase III ($8,250,000 - CR 3000 to CR 390) to this project as future phases outside of 2014-2019 TIP cycle. This amendment #9 also adds $250,000 for FY2019 for Final Design & PS&E Certifications. Deleted $250,000 CMAQ Flex from FFY2019 moved to a new PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100100 Construction ■ Right-of-way ■ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,853,696 $2,853,696 TCSP $48,000 $48,000 $3,700,000 $3,700,000 Totals $486,304 $486,304 State Match $12,000 $12,000 Local Match $300,000 $300,000 Local Non-Match 01 01 16 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 2 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 42.1 CN: F100101 Lead Agency: City of Farmington Est. Letting: Proj East Pinon Hills Blvd Extension Phase II Fr: Hubbard To: CR 3000 Project Desc.: Includes earthwork, asphalt, intersection lighting, bridges over the Animas River and oxbow, drainage improvements, environmental mitigation. Est. Proj. Cost: $13,265,454 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Capacity Proj Remarks: Added Phase II to the TIP with $250,000 to CMAQ Flex in FFY 2017, added new scope for Phase II 2.13.15. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100101 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 CMAQ-Flex $213,600 $213,600 $250,000 $250,000 Totals $0 $0 State Match $36,400 $36,400 Local Match 15 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 3 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 83 CN: F100102 Lead Agency: San Juan County Est. Letting: Proj New Project East Pinon Hills Blvd Extension Phase III Fr: New South Side River Road (CR 3000) To: New Project Wildflower Parkway (CR 390) Project Desc.: New Project Includes earthwork, asphalt, intersection lighting, drainage improvements, environmental mitigation Est. Proj. Cost: $8,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 Length: 2.2 Category: Roadway Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100102 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?■ Signif. Work Zone: RT2 Rt 1 BMP Rt 2 BMP: Rt 1 EMP: Rt 2 BMP: $8,000,000 Totals $8,000,000 Local Non-Match 01 $8,000,000 $8,000,000 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 4 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 101.1 CN: F100110 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase IV Fr: MP 57.8 To: MP 60.2 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $15,600,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2.4 Category: Capacity Proj Remarks: Amended in the FFY 2014-2019 TIP through Amendment #2 (approved on Sep 19,2013). Split ROW and Construction funding as part of Modification #4 (Feb 10, 2014). Decreases NHPP by $4,440,034 in FY 2016 and STP by $2,655,239 also in FY 2016 as part of Amendment #7 to FFY2014-20190 TIP 9.18.14. TIP Modification 11 moves $3,018,546 from PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100110 Construction ■ Right-of-way ■ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 57.8 Rt 2 BMP: 0 Rt 1 EMP: 60.2 Rt 2 BMP: 0 NHPP $2,171,389 $2,171,389 $2,541,420 $2,541,420 Totals $370,031 $370,031 State Match $0 $0 Local Match 03 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 5 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 101.2 CN: F100112 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase V Fr: MP 56 To: MP 58 Project Desc.: CP-91 Widen to 6 Lanes Est. Proj. Cost: $17,655,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). Brings total FY 2015 total to $974,000 and changes from NHPP to STPF per amendment #7 to FFY2014-2019 TIP. TIP Modification #14, added CP-91 language to Scope of PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100112 Construction ■ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 56 Rt 2 BMP: 0 Rt 1 EMP: 58 Rt 2 BMP: 0 NHPP $4,240,116 $7,059,080 $11,299,196 $13,224,714 $4,962,682 $8,262,032 Totals $1,925,518 $722,566 $1,202,952 State Match $0 $0 $0 Local Match 03 03 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 6 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 101.3 CN: F100113 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase VI Fr: MP 54 To: MP 56 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $9,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100113 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 54 Rt 2 BMP: 0 Rt 1 EMP: 56 Rt 2 BMP: 0 NHPP $6,565,803 $6,565,803 STP-Sm Urb $1,123,797 $1,123,797 $9,000,000 $9,000,000 Totals $1,310,400 $1,310,400 State Match $0 $0 Local Match 03 03 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 7 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 104 CN: F100114 Lead Agency: NMDOT D-5 Est. Letting: Proj Bridge Preservation: US 550 #9178 & #9179 Fr: 169.5 To: 169.5 Project Desc.: Bridge Maintenance and Preservation, resurface bridge. Est. Proj. Cost: $260,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0550 Length: 0 Category: Maintenance Remarks: Added to TIP as part of amendment #7 (FFY2014-2019) $260,000 NHPP funding for FY2017. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100114 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Reg. Sig. Work Zone: RT2 Rt 1 BMP 169.5 Rt 2 BMP: 0 Rt 1 EMP: 169.5 Rt 2 BMP: 0 NHPP $222,144 $222,144 $260,000 $260,000 Totals $37,856 $37,856 State Match $0 $0 Local Match 05 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 8 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 102 CN: F100170 Lead Agency: NMDOT D-5 Est. Letting: Proj NM 173 Fr: MP 2.0 To: NM 575 Project Desc.: Safety Improvements Est. Proj. Cost: $2,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 NM0173 Length: 1.5 Category: Safety Remarks: Modification #10 moved FY2015 HSIP Safety Funds to FY2016 in the amount of $1M.Amendment #8 (Oct 8 2014) adds an additional $110,000 to FY2015 in STPF funds. (Dec 1, 2014) TIP Amendment #9 amends the termini description from MP 2.0 to NM 575. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100170 Construction ■ Right-of-way ■ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 2 Rt 2 BMP: 0 Rt 1 EMP: 3.5 Rt 2 BMP: 0 Safety (HSIP) $926,400 $926,400 $1,000,000 $1,000,000 Totals $73,600 $73,600 State Match $0 $0 Local Match 21 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 9 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 81 CN: F100210 Lead Agency: County of San Juan Est. Letting: Proj CR 350/ CR 390 Intersection Fr: 500' South of intersection on CR 350 To: 500' North of Intersection on CR 350 Project Desc.: Preliminary Engineering, ROW acquisition, and construct improvements CR 350/CR390 intersection- 500ft North and South of intersection on CR 350, 500ft west of intersection on CR 390. Est. Proj. Cost: $650,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 453500 Length: 0.19 Category: Safety Remarks: Revised work description, funding, and fiscal years as part of Modification #3 (Dec 5, 2013). 12.02.14 updated project termini description as part of TIP modification #12 FFY2014-19. Modification #14 moves $35K FY2015 ROW funds to FY2016 to Safety Funds. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100210 Construction ■ Right-of-way ■ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document ■ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 Safety (HSIP) $495,624 $495,624 $535,000 $535,000 Totals $39,376 $39,376 State Match $0 $0 Local Match 21 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 10 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 21.1 CN: F100230 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase II Fr: Existing Trail To: .324 Miles East Project Desc.: Construct river trail Est. Proj. Cost: $199,636 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: ROW, Envt, Design previously completed under CN 0002(091). Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100230 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $119,012 $119,012 $153,325 $153,325 Totals $0 $0 State Match $20,281 $20,281 Local Match $14,032 $14,032 Local Non-Match 28 28 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 11 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 21.2 CN: F100231 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase III Fr: End of Phase II To: .495 Miles East Project Desc.: Construct River Trail Est. Proj. Cost: $203,050 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100231 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?□ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $158,580 $158,580 $203,050 $203,050 Totals $0 $0 State Match $27,024 $27,024 Local Match $17,446 $17,446 Local Non-Match 28 28 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 12 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 85 CN: F100270 Lead Agency: San Juan County Est. Letting: Proj New Project Kirtland Schools Walk Path System Fr: New Project US 64 and CR 6575 To: New Project Kirtland Elementary on CR 6446 Project Desc.: New Project Asphalt walk path and sidewalks with curb and gutter Est. Proj. Cost: $1,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 456100 Length: 2.84 Category: Bike/Ped Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100270 Construction □ Right-of-way □ Prel. Engr. ■ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other □ TIP Informational Years TIP Amendment Pending?■ Routine Work Zone: RT2 456400 Rt 1 BMP 4.9 Rt 2 BMP: 0 Rt 1 EMP: 5.67 Rt 2 BMP: 0.61 TAP-Sm Urb $102,527 $102,527 TAP-Sm Urb $751,873 $751,873 $1,000,000 $119,999 $880,001 Totals $0 State Match $145,600 $17,472 $128,128 Local Match 15 28 15 28 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 13 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 201 CN: TF00001 Lead Agency: City of Farmington Est. Letting: Proj New Project Red Apple Transit Capital/Operating Fr: New Project N/A To: New Project N/A Project Desc.: New Project Annual operating costs and capital purchases for bus and security cameras Est. Proj. Cost: $1,289,587 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Transit Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: TF00001 Construction □ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design □ Environ. Document □ Other ■ TIP Informational Years TIP Amendment Pending?■ Exempt Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 FTA 5307 (Sm Urb Oper) $500,000 $500,000 $2,000,000 FTA 5311 Capital $22,400 $22,400 FTA 5339 (MAP-21 Bus/Facil ) $65,600 $65,600 $4,110,000 $1,110,000 $1,000,000 Totals State Match $2,022,000 $522,000 $500,000 Local Match 23 23 23 23 23 23 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 14 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 202 CN: TF00010 Lead Agency: City of Farmington Est. Letting: Proj New Project Red Apple Transit Bus Route Accessibility Fr: To: Project Desc.: New Project Bus shelters, bus pull outs, ADA ramps at multiple locations Est. Proj. Cost: $81,577 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Transit Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: TF00010 Construction ■ Right-of-way □ Prel. Engr. □ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design ■ Environ. Document □ Other ■ TIP Informational Years TIP Amendment Pending?■ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $3,400 $66,300 $81,577 $3,979 $77,598 Totals State Match $579 $11,298 Local Match 15 15 $69,700 $11,877 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 15 of 15