Full Text
REVISIONS TO THE MPO MAJOR THOROUGHFARE PLAN (approved by the Policy Committee on August 7, 2012) In May and June of 2012, the Farmington City Council approved revisions to the City of Farmington Major Thoroughfare Plan. At the request of the City of Farmington, the MPO also approved the following revisions to its regional Major T-Plan to ensure consistency between the two plans. Road Name Termini DESCRIPTION Hood Mesa Trail Foothills to East Road Alignment revised to match what was approved by the City of Farmington Marseille Blvd Current End of Road to Lakewood Added as a proposed Collector Glade Road Pinon Hills Blvd to the North Added back to the MPO Major T-Plan; noted that it functions as a Collector but will remain an unpaved road Herrera Cliffside to East Main St Added as a proposed Collector Herrera East Main St to English Added as a Collector Malta US 64 to Southside River Road Added as a Collector Unnamed Road North of Four Corners Airport to Pinon Hills Blvd Added as a proposed Collector Spine Road NM 170 to Pinon Hills Blvd Added as a proposed Collector Piedras St Current End of Road to NM 170 Added as a proposed Collector MPO Major T-Plan Administrative Modification (to correct a labeling error) Labeled Wall from Main St to Apache as a Minor Arterial (was previously labeled as a Collector)