Full Text
Proposed MPO Regional BicyclePedestrian Improvements Map Num City or Area Location Road/Facility Name From Road/ Place To Road/ Place Type of facility Location Type Surface Connects to Length (feet) ESTIMATED COST Comments Economic Vitality Safety Accessibility Connectivity Funding/ Cost BPAG Top 10? Other Range Issues or Concerns 8 Farmington Butler to San Juan College along Sunrise Butler San Juan College Multimodal MultiUse Path Concrete residential, college, transit 4700 $136,535 Strong public support X X X X X Yes BPAG Top Vote #2 Short ROW; need SJ College involvement 11 Farmington/ County Wildflower Parkway Approx. at Yarbrow CR 350 Multimodal MultiUse Path Hard residential 19500 $566,475 ARRA funding providing Bike Lanes & Sidewalks from Browning to approx Yarbrow X X Mid ROW on CR 390 in the County 14A Farmington Pinon Hills Blvd 30th Sports Complex Bike lanes Onroad Hard park 3500 $143,010 Connects gap in bike lanes on PHB X X X Short Need to narrow medians at Sports Complex to be able to mark bike lanes 14B Farmington/ County Twin Peaks Rd from NM 170 to Troy King Road NM 170 Troy King Rd Bike lanes Onroad Hard park, residential 6575 $268,655 Requires widening road for bike lanes X X Mid Is there ROW for bike lanes on Twin Peaks 18 Aztec to Farmington Animas River trail from east Farmington to Riverside Park in Aztec Animas River (south of Farmington Lake) Hartman Park (Aztec) Multimodal Offroad Crusher fines residential, parks 34000 $81,940 Connects proposed Farmington Parks and Aztec/ATOS trails X X X Parallel to #24 and #27; can a combination of the 3 work? Mid property ownership along river 19 Aztec to Bloomfield Connect from Animas River trail (above) to Bloomfield Hartman Park (Aztec) Blanco/Ruth Ln (Bloomfield) Multimodal MultiUse Path Hard parks, schools, residential 37300 $1,083,565 May initially be gravel or other aggregate for peds and mtn bikes X X Yes BPAG Top Vote Parallel to #55 Mid Preserve ROW before development is built 20 Bloomfield, County, Farmington CR 5030 CR 5030/ CR 350 CR 5030/ US 550 Multimodal MultiUse Path Hard 30600 $888,930 Follows a pipeline road X Yes BPAG Top Vote #5 Long Pipelines might not make project feasible 21 Bloomfield, Fmtn, County Path parallel to US 64 Andrea/US 64 Ruth Ln/US 64 Multimodal MultiUse Path Hard Bloomfield, Farmington (Regional) 42000 $1,220,100 X X X X Incorporate into US 64 project? Mid Remove from list? 22 Farmington, County PHB Extension/ CR 3900 CR 390/ CR3900 PHB/ E Main Multimodal MultiUse Path Hard residential, retail 26000 $755,300 Connects #18, #24 & #11 X X X X Part of PHB project Short 23 Bloomfield, County CR 5500 (West Hammond) US 64 US 550 Bike Route (Bike lanes) Onroad existing residential 39700 $0 X N/A Bike Route N/A Is there ROW for bike lanes? 24 County CR 3000 Browning Pkwy US 550 Bike route Onroad existing residential 63200 $0 Alt to #18 & #27 X N/A Bike Route; parallels #18/ #27 N/A 25 County (Kirtland) Kirtland path Troy King/ Twin Peaks CR 6675/ CR 6100 Bike rt on Twin Pks & CR6500; Multiuse path on CR6400 & CR6100 Onroad, Multiuse path existing, Asphalt residential/ school 14100 $409,605 X X X X Yes BPAG Top Vote #9 Mid 26 County La Plata Rd (NM 170) US 64 North end MPO boundary Bike route Onroad existing parks, residential 63400 $0 X N/A Bike Route N/A 27 County Old Aztec Hwy (CR 3520 and CR 3050) NM 516/ CR 3520 NM 516/ CR 3050 (east end) Bike route Onroad existing residential 35000 $0 Alt to #18 & #24 X N/A Bike Route; parallels #18/ #24 N/A 28 Aztec, County Light Plant Rd (NM 574) NM 516 North end MPO boundary Bike route Onroad existing residential, school, transit 30600 $0 X N/A Bike Route N/A Need to look at intersections; ROW 36 Farmington Pinon Hills Path PHB/30th PHB/East Main (NM 516) Multimodal MultiUse Path Hard East and west Farmington 29300 $1,000,000 Bike lanes exist on entire length X X X Mentioned in PHB Corridor Study Mid ROW available for a multiuse path? ---PAGE BREAK--- Proposed MPO Regional BicyclePedestrian Improvements Map Num City or Area Location Road/Facility Name From Road/ Place To Road/ Place Type of facility Location Type Surface Connects to Length (feet) ESTIMATED COST Comments Economic Vitality Safety Accessibility Connectivity Funding/ Cost BPAG Top 10? Other Range Issues or Concerns 37 County CR 350 US 64 NM 516 Bike lanes Onroad Asphalt Crouch Mesa, Flora Vista (Regional) 39700 $1,622,142 X X Can be restriped to create bike lanes? Mid Requires widening road for bike lanes? 38 Bloomfield Blanco Blvd. (east) US 550 N (1st St) US 64 Bike lanes and sidewalks Onroad Concrete Residential, school 14200 $830,700 Need sidewalks E of US 550 X X X X Bloomfield #1 priority Short 41 Aztec, County, Farmington North Farmington Aztec route Farmington Lake US 550/ NM 173 Multimodal Offroad Crusher fines Aztec, Farmington 44500 $107,245 X Preserve ROW for future development Long 42 Bloomfield CR 4935 (Arroyo) Arroyo/ E. Blanco CR 4900 (Arizona)/ US 550 Bike route Onroad existing Residential 16200 $0 X N/A Bike Route N/A 43 Farmington San Juan and East Main San Juan/Butler E Main/ Piñon Hills Wide sidewalk/path Multiuse path Hard Residential, retail 24500 $711,725 Connects downtown to parks & shopping areas X X X X Parallel to #65 Mid ROW issues along East Main 45* Aztec Ruins Road Trail Chaco/NM 516 Trail Junction Multimodal Offroad Crusher fines 4600 $11,086 46* Aztec Riverside Trail North end of River trail Ruins Road Trail Multimodal Offroad Crusher fines Parks 1200 $34,860 51* Aztec Riverside Trail B Existing river trail Existing Riverside Pk loop trail Multimodal Offroad Crusher fines Downtown, park 800 $1,928 *NOTE Aztec Combination of 45, 46, and 51 see above see above Multimodal Offroad Crusher fines 6600 $47,874 X X X X X Property ownership along river? Short 49 Aztec OliverMcWilliams trail 50 acre open space Ruins Road trail junction Multimodal On and Off road Concrete, Asphalt Residential, school, park NOTE: 8600 ft onroad and 4600 ft multimodal $986,406 Via Oliver, McWilliams, and Estes arroyo X X Short 55 Aztec, Bloomfield Bloom.Aztec Hike/Mtn Bike trail Wilderness Park (west of Ruth) S. Rio Grande (Aztec) Multimodal (mtn bike/ hike) Offroad Crusher fines Aztec, Bloomfield 40800 $98,328 Becomes regional priority for unless #19 is a sidepath X X X Parallel to #19 Long 63 Farmington, County Glade Road PHB/GladeRd FarmLakeTrail Multimodal Offroad Crusher fines 20400 $49,164 X Preserve ROW Mid 64 Farmington, County Farmington Lake Multimodal Offroad Crusher fines 43700 $105,317 X Preserve ROW Long 65 Farmington, County Animas River/East Main GatewayPark Farmington Lake Multimodal Offroad Crusher fines Parks 42300 $101,943 X X X X Parallel to #24; property ownership along river? Long Prop. Acquisition, trail easements 66 Farmington Lions Wilderness Trail LionsWildPk Fmtn Lake Trail Multimodal Offroad Crusher fines 15800 $38,078 College & Hood Mesa to get bike lanes & sidewalks X X X Preserve ROW Mid COF Parks working with BLM to get ROW for trail 71 Farmington, County La Plata River SportsComplex JacksonLk Junctio Multimodal Offroad Crusher fines Regional (for recreation) 22400 $53,984 X X X Property ownership along river? Long Need trails easements & property 72 Farmington La Plata River WestlandPark SportsComplex Multimodal Offroad Crusher fines Recreation, parks 6700 $16,147 X X X X Property ownership along river? Mid Need trails easements & property 73 Farmington, County San Juan River SanJuan/Animas River junction CR 5500 Multimodal Offroad Crusher fines Regional (for recreation) 44000 $106,040 X X X X Property ownership along river? Long Need trails easements & property 79 Farmington, County San Juan River SanJuan/Animas River junction River Bend Park Multimodal Offroad Crusher fines Regional (for recreation) 11300 $27,233 X X X X X Property ownership along river? Mid Need trails easements & property 31 Identified Regional Projects Estimated Total Cost of Regional Projects $11,456,441