Full Text
(effective 01/01/2026) EMC 13.80.010 Plan Review Fee PW Inspection Fee 50 cubic yards or less 51 to 100 cubic yards 101 to 1,000 cubic yards 1,001 to 10,000 cubic yards 10,001 to 100,000 cubic yards 100,001 cubic yards or more Residential Lot Other Commercial / Industrial Subdivision (Plat) Short Subdivision (Short Plat) Other Parallel to Right-of-Way Non-Parallel to Right-of-Way Construct Fence in Right-of-Way Retaining Wall / Rockery Paving (Site Paving & Parking Lots) Miscelaneous Minor Permits PUBLIC WORKS PERMIT FEES Cut/Fill/Grading/Earthwork (1,000 CY and greater requires SEPA Review by the Planning Division) Driveway Access to Public Right-of-Way Erosion & Sedimentation Control $50.00 for the first 100CY, plus $20.00 for each additional 100CY or fraction thereof. $230.00 for the first 1,000CY, plus $15 for each additional 1,000CY or fraction thereof. $365.00 for the first 10,000CY, plus $80 for each additional 10,000CY or fraction thereof. $1,085.00 for the first 100,000CY, plus $50 for each additional 10,000CY or fraction thereof. $25.00 $50.00 PERMIT FEE BY ACTIVITY $200.00 $150.00 plus $10/Lot $50.00 plus $10/Lot $50.00/Acre or portion thereof of proposed clearing; $500.00 maximum $50.00 $25.00 $10.00/ft of height per 100LF of length or portion thereof; $40.00 min. $0.005/SF; $45.00 min. $25.00 Site Features / Improvements $3/LF; $45 minimum Concrete Apron / Curb Cut Asphalt Apron *applicable only where no curb and gutter improvements exist or none are required $25.00 Open Cut / Directional Bore / Trench Street or Alley $1/LF; $45 minimum $45.00 - Commercial / Industrial $25.00 - Residential Plan Review / Inspection Fees 1.5% of Public Works approved Engineer's Cost Estimate; $20.00 min. 3% of Public Works approved Engineer's Cost Estimate; $20.00 min. Land / Lot Machine Clearing $35.00 everettwa.gov/permits 01/01/2026 CITY OF EVERETT PERMIT SERVICES 2930 WETMORE AVE, EVERETT, WA 98201 [PHONE REDACTED] [EMAIL REDACTED]