Short-Term Concept Design Brewster Avenue/Arlington Boulevard, El Cerrito July 2012 XING PED STOP SOUTH BREWSTER AVENUE P P Install “CURVE AHEAD” Sign with Speed Advisory Paint Diagonal Crosshatch Markings Stripe Ladder Crosswalk and Install ADA Curb Ramp Remove Crosswalk Construct Asphalt Curb Painted White min 4’ Install “PED XING AHEAD” Sign Construct Asphalt Curb Painted White with Hand Rail Install Botts Dots on Shoulder Stripe Relocate PED XING Assemblies 12’ bus bench 7 H BUS STOP 7 H BUS STOP ARLINGTON BOULEVARD XING PED XING Move PED XING legend 40’ east Move PED XING legend 40’ north Paint sharrows Install “PED XING AHEAD” Sign Paint Diagonal Crosshatch Markings Install Botts Dots on Center Line