ABOUT THE PROGRAM The BART Earthquake Safety Program will upgrade the original BART system to ensure safety and the ability to return to operation shortly after a major earthquake. Priorities for strengthening work include BART’s Transbay Tube, elevated structures and many stations. Thank you for supporting BART’s efforts to protect this Bay Area asset. Continued Construction and Pedestrian Impacts Along the Ohlone Greenway April 2012 Dear Community Member: As part of our systemwide Earthquake Safety Program, BART is strengthening the elevated structures along the Ohlone Greenway. In general, work can occur between the hours of 7 am and 6 pm, Monday through Friday, with nighttime work as necessary. However, some areas will have limited hours of work as designated by the local jurisdiction. During construction, segments of the Ohlone Greenway will be closed to bicycles and pedestrians. Users of the Ohlone Greenway will need to access local city streets to detour around the closures. A map showing the Ohlone Greenway closures is on the reverse side of this notification. Vehicle traffic should not be affected. Below are the approximate construction start dates and locations of work. Please watch for suggested detours, and look for signs with safety information and other notices. To contact the Earthquake Safety Program, for paratransit information, or other inquiries, please visit our website at www.bart.gov/earthquakesafety, email [EMAIL REDACTED], or call our Program Information Line at (510) 412-5546. We appreciate your patience during this work, and will attempt to minimize construction-related inconveniences. Si necesita información en español, por favor llame al (510) 412-5546. OHLONE GREENWAY CLOSINGS ANTICIPATED START DATE ANTICIPATED COMPLETION DATE Portland Ave. to Brighton Ave. (Albany) Under Construction March 2012 Cutting Blvd. to San Pablo Ave. (El Cerrito) Under Construction August 2012 Potrero Ave. to Hill St. (El Cerrito) Under Construction August 2012 Dartmouth St. to Solano Ave. (Albany) Under Construction September 2012 Neilson St. to Santa Fe Ave. (Berkeley) Under Construction September 2012 Santa Fe Ave. to Dartmouth St. (Berkeley/Albany) March 2012 October 2012 Brighton Ave. to Fairmount Ave. (Albany/El Cerrito) April 2012 October 2012 Stockton Ave. to Portola Ave. (El Cerrito) April 2012 December 2012 Solano Ave. to Portland Ave. (Albany) TBD TBD Central Ave. to Stockton Ave. (El Cerrito) TBD TBD Portola Ave. to Manila Ave. (El Cerrito) TBD TBD Manila Ave. to Potrero Ave. (El Cerrito) TBD TBD ***All Dates are Subject to Change*** BART EARTHQUAKE SAFETY PROGRAM P.O. Box 12688 (LKS-17) Oakland, CA 94604-2688 Construction Notification Earthquake Safety Program Updated March 15, 2012 ---PAGE BREAK--- Earthquake Safety Program Current Ohlone Greenway Construction El Cerrito Plaza BART Station BART Alignment/Ohlone Greenway North Suggested pedestrian and bicycle detours • East/west vehicle, bicycle and pedestrian traffic will not be affected. • Additional detours will accompany future construction areas. Albany Middle School and Athletic Fields Under construction/Ohlone Greenway closed • Current closures • Please reference the other side of this notification for future closures. Albany Community Center and Public Library Albany Senior Center El Cerrito Public Library, Fairmont Elementary School and Open House Senior Center Pedestrian Route El Cerrito del Norte BART Station El Cerrito City Hall, Police and Fire