Full Text
Figure 4 Phase 2 Concept Design Brewster Avenue/Arlington Boulevard, El Cerrito Existing Condition August 2012 Ex Ex Ex Ex Ex Exisisisisistititititit ng ng ng ng ng ng ng n Con on on on on o dididididididitititititititititition on on on on on on ARLINGTON BOULEVARD P P STOP XING PED XING PED Install “PED XING AHEAD” Sign Install “PED XING AHEAD” Sign Install Speed Feedback Sign with “CURVE AHEAD” with Speed Advisory Signs Install Speed Feedback Sign P Paint Diagonal Crosshatch Markings P Stripe Ladder Crosswalk and Install ADA Curb Ramps Remove Crosswalk PE P D k Move PED XING legend 40’ east Construct Sidewalk Construct Sidewalk Private Driveway Priv Construct Curb Extension ST ST ST STOP OP OP O Stripe Crosswalk min 4’ 12’ Install Botts Dots on Center Line P Insta A Install Botts Dots on Shoulder Stripe BREWSTER AVENUE (South) 7 H BU B S ST S OP OP O 7 H BU B S STOP OP OP OP Construct Curb Extension Install ADA Curb Ramps Relocate PED XING Assemblies PED bus bench bus bench Paint sharrows XING I t ll B tt D t C t Li XI X N X Move PED XING legend 40’ north ARLINGTON BOULEVARD BREWSTER AVENUE