Exhibit 4 Concept Design Brewster Avenue/Arlington Boulevard, El Cerrito Existing Condition ARLINGTON BOULEVARD P P STOP XING PED XING PED Install “PED XING AHEAD” Sign Install “PED XING AHEAD” Sign COUNTERMEASURE 3: Install Speed Feedback Sign with “CURVE AHEAD” with Speed Advisory Signs COUNTERMEASURE 3: Install Speed Feedback Sign Paint Diagonal Crosshatch Markings COUNTERMEASURE 2: Stripe Ladder Crosswalk and Install ADA Curb Ramps Remove Crosswalk Move PED XING legend 40’ east COUNTERMEASURE 1: Construct Sidewalk COUNTERMEASURE 1: Construct Sidewalk Private Driveway Construct Curb Extension Stripe Crosswalk min 4’ 12’ Install Botts Dots on Center Line Install Botts Dots on Shoulder Stripe BREWSTER AVENUE (South) 7 H BUS STOP 7 H BUS STOP Construct Curb Extension Relocate PED XING Assemblies PED bus bench Paint sharrows XING Move PED XING legend 40’ north ARLINGTON BOULEVARD BREWSTER AVENUE Boundary of City Right-of-Way All Proposed Improvements Within City Street Right-of-Way