Full Text
9.2 Schedule of Values ITD RIGHT-OF-WAY No. Description Quantity Unit Unit Cost Extended Cost General 1 Mobilization 1 LS 2 Demobilization 1 LS 3 Erosion & Sediment Control 1 LS 4 Traffic Control 1 LS 5 Permits 1 LS $5,000.00 $5,000.00 Earthwork & Paving 6 Clearing and Grubbing LS 7 Removal of Asphalt SF 8 Excavation CY 9 Offsite disposal of excess/unsuitable material CY 10 Embankment CY 11 Import of suitable structural material CY 12 Final subgrade preparation SF 13 Subgrade Separation Geotextile Type III SF 14 Granular Subbase CY 15 ¾" Crushed Aggregate Base, Type CY 16 Asphalt paving TON 17 Grading and final cleanup 1 LS Concrete 18 ITD Curb & Gutter Type 2 - including terminus LF 19 Type 1 Curb - including terminus LF Miscellaneous 20 Striping & Signage 1 LS 21 18" PVC sleeve LF 22 Topsoil placement CY Total Project Cost ---PAGE BREAK--- N. PALMETTO DRIVE No. Description Quantity Unit Unit Cost Extended Cost General 1 Mobilization 1 LS 2 Demobilization 1 LS 3 Erosion and Sediment Control 1 LS 4 Traffic Control 1 LS 5 Permits 1 LS $5,000.00 $5,000.00 Earthwork & Paving 6 Clearing and Grubbing SF 7 Topsoil strip and stockpile CY 8 Excavation CY 9 Embankment CY 10 Final subgrade preparation SF 11 6" Structural Subbase CY 12 ¾" Minus Road Base CY 13 Asphalt paving TON 14 Grading and final cleanup 1 LS Concrete 15 Standard 6" Curb and Gutter LF 16 Intersection Traffic Separation Curb LF 17 10' Wide Concrete Sidewalk (Palmetto) LF 18 5' Wide Concrete Sidewalk (Plaza) LF 19 Valley Gutter LF 20 Concrete Pedestrian Ramp, Modified Type EA 21 Concrete Pedestrian Ramp, Type "C3" EA Storm Drain 22 12" Storm Drain Pipe LF 23 Inlet Catch Basin, Type 1 EA 24 Standard Concrete Catch Manhole EA 25 Vertical Sand Filter - complete incl. all components LS Gravity Irrigation 26 18" RCP LF 27 24" RCP LF 28 48" Irrigation Manhole EA 29 Irrigation Box A - complete incl. all components EA 30 Irrigation Box B - complete incl. all components EA 31 Existing component demolition LS Miscellaneous 32 Pressure Irrigation System relocation 1 LS 33 Pavement Markings & Street Signage 1 LS Total Project Cost