← Back to Eagle

Document Eagle_doc_d285caaa8e

Full Text

ADDENDUM No.1 Page 1 of 2 G:\16022\bidding process\addendum #1\Addendum#1.doc ADDENDUM NO. 1 April 1, 2020 This Addendum is addressed to all Bidders who have Contract Documents for the preparation of Bids for the following project. Project Title: Eagle Bypass (SH44) Access & N. Palmetto Drive Extension Project No.: 16022 Owner: City of Eagle, Idaho Engineer: RiveRidge Engineering Co. Bid Date: 12:00 P.M. MDT, Friday (rev.) May 1, 2020 (rev.) Location: RiveRidge Engineering Co. 2447 S. Vista Avenue Boise, Idaho 83705 Addendum Acknowledgement Bidders shall acknowledge receipt of this Addendum and all attachments listed below on page BID-1 of the “Bidder’s Proposal”. Any Bid that fails to comply with this requirement will be considered non-responsive. Contract Modification This Addendum shall become part of the Contract Documents for the project listed above. This Addendum consists of the following revision and clarification: 1. The bid date has been changed to Friday, May 1, 2020 at 12:00 P.M. MDT. 2. Item #31 – “Pavement Markings and Street Signage” shall be added to the N. Palmetto Drive Schedule of Values as a Lump Sum item. 3. Item #5 – “Permits” for both Schedules of Values shall have a $5,000.00 lump sum assigned as a contingency and shall be included in the Bid. Actual permits costs will be determined at the time of construction and the actual cost will be paid as a lump sum at cost with no markup. The total contract amount will be increased or decreased accordingly by Change Order. 4. Construction Plans for Palmetto Drive, Sheet 6.0 – For the purposes of bidding, the size of the existing pressure irrigation line to be relocated shall be assumed ---PAGE BREAK--- ADDENDUM No.1 Page 1 of 2 G:\16022\bidding process\addendum #1\Addendum#1.doc to be Upon field confirmation of the line size, the contract amount shall be adjusted, based on the actual line size, by Change Order.