← Back to Dubl, IN

Document Dublin_doc_47619c6061

Full Text

G:\Forms & Handouts - 2026\Residential Projects - 2026\14. Resd Photovoltaic Systems-Submittal Chklist (Rev 2026).docx Page 1 of 3 RESIDENTIAL PHOTOVOLTAIC SOLAR SYSTEMS Plan Submittal Checklist: Ground ● Roof Mounted Purpose This handout summarizes the permit process and fees for the installation and inspection of Small Residential Solar Photovoltaic (PV) Systems. It also provides information about submittal requirements, structural requirements, fire classification, and the inspection process. The following guideline shall be reviewed before commencing any work. Additional Agency Approvals Planning. If installing a ground- mounted PV system please contact planning staff at (925) 833-6610 to ensure zoning regulations are met. PG&E. Contact their Solar Customer Service line at (877) 743-4112 to verify the agency’s requirements. Review Process Provided that all the code regulations and plan criteria are complete, the review and permit may be issued over-the-counter. As an option, applicants can apply electronically via email [EMAIL REDACTED] and submit the complete documentation as listed below. A permit technician will notify the applicant confirming receipt of the application with further instructions on plan check status and fee payment. Note: Ground- mounted PV systems will require a normal plan review submittal. Plan Submittal for Construction Complete plans and documents can be submitted directly to the Building & Safety Division counter between 8:00 am to 4:00 pm, Monday through Friday. Contact the Building & Safety Division at (925) 833-6620 for fee or submittal inquiries Permit Application A fully completed and signed Permit Application Worksheet. Electronic Plans and Documents • Plans for roof or ground- mount. Plans must be signed by designer or stamped and signed by licensed professional (if applicable). • Structural calculations prepared, stamped and signed by a California design professional (if applicable). • Manufacturer’s specifications for the proposed PV panels and PV inverter(s) showing all electrical information. • Electrical panel and sub-panel photos (must be legible). • If main electrical service is 125 amps or less, provide electrical load calculations. • Permit fee payment. Plan Size Electronic plans must be drawn to scale, fully dimensioned and legible on minimum 11 x 17 inch document size site plan: 1/8-in = 1-ft) in a concise, detailed and professional manner. • Cover Sheet / Site Plan. Identify job address; name and address of owner, contractor and contact person; address, phone number, title and registration of designer or design professional; clear description of work; applicable codes; sheet index. Show lot and major components on the property and lot lines. • Roof Plan. Show the slope of the roof and location of the proposed PV panels; minimum access pathways at all PV locations and roof access points in relation to any ridge, hip or valley. Identify type and number of roof coverings and subsequent weatherproofing of the roof. Show all existing plumbing and mechanical vents. • Framing Plan. Roof-mounted solar projects shall include a roof framing and support structure plan; specify spacing and size (trusses or rafters) of framing members; maximum weight of individual PV panels; attachment details of panels to roof structure; size and weight of ballasts; ---PAGE BREAK--- Page 2 of 3 access, pathways and spacing requirements per CRC R329.6. Where alterations are required to existing structures, structural plans shall be provided that are sufficient in detail and scope to demonstrate the required load path to the ground. This method is not eligible for over-the-counter review. Note: Structural calculations shall be required if the total weight of the photovoltaic system is over five pounds per square foot. Ground-mounted solar systems shall include a foundation and framing plan; footing details; connection details for solar water heater system. Show complete details identifying the load path to the ground. • Manufacturer’s Electrical Data Sheets. Electrical single-line diagram identifying all devices installed in the PV system and total kVA rating of system; point of interconnection with the utility supplied wiring system; details of main breaker; PV breaker and rating of bussing; type and size of all conduit and conductors throughout the PV system; overcurrent protection; inverter; disconnects; signage; AC connection to building; grounding and bonding of rails and modules. Manufacturer’s specifications and installation instructions for all manufactured components: PV modules, inverter(s), combiner box (if used), disconnects, mounting system with base and rail attachment and connections. • Verification of Existing Service. Provide copies of photos of the existing main service panelboard and any sub-panels and photos of their interior labels. The electrical single-line diagram shall be representative of field conditions. Inspection Guidelines General • Customer / installer shall provide approved plans on site for inspector. • Photovoltaic module number and location of installation must match approved site plan. Note: Revisions to the PV panel layout shall be submitted to the Building & Safety counter for review prior to final inspection. Additional fees may be charged. • Customer / installer shall provide access to all areas needed for inspection. • Roof mounted panels: Installer shall provide a proper and secured ladder(s) to access all areas. • In house: If wiring in attic and/or garage area, the customer/installer shall ensure access to these areas. Roof Access and Pathways • Verify minimum 18-in to 36-in clearance from arrays to ridge and edge of roof. (CRC R329.6.1) o PV arrays occupying no more than 33% of the roof area (plan view),shall have no less than 18” of clear setback required on both sides of a horizontal ridge. (CRC R329.6.2) • Verify all structural supports are properly installed and sealed per listing. • Verify all metallic raceways, J-boxes, supports and modules are properly labeled and grounded in accordance with product listings. (CEC Art 690.43) • Verify all exposed wiring is listed Sunlight Resistant. (CEC Art 690.31(A)) • Verify all module interconnection connectors require a tool for opening. (CEC Art 690.33) Rapid Shutdown • PV system circuits installed on or in buildings shall include a rapid shutdown function that controls specific conductors as follows. (CEC Art 690.12) o Controlled conductors outside of the array boundary shall comply with CEC Art 690.12(B)(1) and inside the array boundary shall comply with CEC Art 690.12(B)(2). o Controlled conductors shall be limited to not more than 30 volts and 240 volt-amperes within 10 seconds of rapid shutdown initiation. o Voltage and power shall be measured between any two conductors and between any conductor and ground. o Include signage for rapid shutdown in accordance with CEC 690.56. o Equipment that performs the rapid shutdown shall be listed and identified on site placard. DC Disconnect • Verify proper location of DC disconnect and that it shall be readily accessible - within sight of inverter - and properly listed for 600 volt DC power. (CEC Art 690.13) • If DC wiring is run through the building, a DC disconnect shall be installed prior to the conductors entering the building or the conductors shall be installed in metallic raceways or metallic enclosures from the point of entrance ---PAGE BREAK--- Page 3 of 3 to the DC disconnect. All J-boxes shall be labeled. (CEC Art 690.31(D)) • Verify proper and permanent labeling with the following information (CEC Art 690.13(B)): WARNING ELECTRIC SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION • The DC disconnect shall also be properly and permanently labeled with the following Installed System Information: (CEC Art 690.53) Maximum Voltage Maximum Circuit Current Maximum Rated Output Current of the Charge Controller or DC to DC Converter (if installed). • Verify labeling of wiring. (CEC Art 690.4) • Verify if DC circuits are more than 80 volts. Arc- fault protection shall be required. (CEC Art 690.11) AC Point of Connection • The breaker must be secured in place and not be equipped with line/load connection. (CEC Art 690.9) Note: Roof-top micro-inverter systems have no DC disconnect switches. AC disconnect shall be installed on the roof or at the utility panel and be capable of being locked OFF. Installed system information shall be installed on Utility Service Panel. Design Criteria The City of Dublin has adopted the following codes and amendments: 2025 California Residential Code (2024 IRC) 2025 California Building Code (2024 IBC) if using engineered parameters 2025 California Mechanical Code (2024 UMC) 2025 California Electrical Code (2023 NEC) 2025 California Plumbing Code (2024 UPC) 2025 California Fire Code (2024 IFC) 2025 California Energy Code (2025 Building Energy Standards) 2025 California Wildland-Urban Interface Code 2025 California Green Building Standards Code Wind speed design factor: Vult = 92 mph, exposure based on geographical location Seismic design category: D2 Climate zone: 12 Plan Check Time For roof mount solar without a battery system, see Permit Issuance below. For roof mount solar with a battery system, please allow 6 business days for each review. For ground mount solar please allow 10 business days for the first review and 6 business days for each subsequent review. Please note, ground mount solar will require approval from Dublin San Ramon Services District City Business License Contractor’s business license must be valid with the City. Applications and renewals will be through the HdL Portal: For business license assistance please email or call the following: o Email Support: [EMAIL REDACTED] o Phone Support: (925) 359-2952 Permit Issuance For roof mount solar without a battery system, a notification will be sent within three business days on the status of the permit through CSS or by email from Permit Technician staff. Fees can be paid through CSS or at the Building Counter and issuance will be through CSS. Please print the necessary documents (permit record, approved forms and inspection record card). Inspections When you are ready for your inspection(s) please do so from your project in CSS. Online inspections can be scheduled each day up until 5:00 AM the day of your inspection. The inspection record card, the permit and all required energy form(s) must be presented to the City Building Inspector before each inspection. Please note, when inspectors schedule their routes each morning (Mon-Fri) the applicant will receive an email notification with the start time of the 2-hour inspection window. If you do not receive an email notification, your 2-hour inspection window will start at the time of the inspection slot you scheduled (8 AM or 11 AM). Questions Contact the Building & Safety Division at (925) 833-6620 for inquiries on plan check, building fees, and school district fees. Project information such as valuation cost and new square footage area are necessary to provide estimates on fees. ---PAGE BREAK--- Page 4 of 3