← Back to Douglas

Document Douglas_doc_9c0eb74639

Full Text

City of Douglas Public Works Annex Roof Replacement Addendum # 1 7/21/21 1. Scope of Work – Delete “Shop Roof” section entirely. 2. Scope of Work “Main office roof” Change Item 1. to read “Remove existing roof to the tar top of the existing built-up Gypsum layer” 3. Scope of Work “Annex main shop” Change Item 1. to read “Remove existing roof to the tar top of the existing built-up Gypsum layer” 4. Manufacturer’s Warranty to be 15 year Minimum. 5. Project completion date shall be no later than June 15th 2022. Project work not to exceed 30 Calendar days from start to final completion. 6. Versico VersaWeld QA TPO Fully Adhered System will be considered an approved equal. 7. Use attached Schedule of prices noting the addition of an add alternate for an additional layer of 2.6 inch insulation (R30 total) to the lower level roof only. Clean-up, Building Permit and 15 year manufacturers warranty all to be considered Included in the unit prices. End of addendum 1 ---PAGE BREAK--- SCHEDULE OF PRICES Unit prices for all items, all extensions and total amount of bid must be shown. Show unit prices in both words and figures and where conflict occurs, the written or typed words shall prevail and the bid shall be adjusted accordingly. SEE SCOPE OF WORK Item No. Approx. Quantity Item with Unit Price to be Written in Words Unit Price Dollars/Cents Total Price Dollars/Cents 1. Remove the existing roof and disposal. 2. Fully adhere new 2.6” Polylso Insulation (Twin Pack Method). 3. Fully adhere new 60 mil white Firestone TPO SA single-ply roof as per Firestone specifications. 4. Install all necessary flashing, fasteners, plates, adhesive, caulking, sealants, tapes and termination bars. 5. Flashing of all roof penetrations. 6. Fabrication and installation of new 24 gauge metal roof edging and metal gutter in choice of color. ---PAGE BREAK--- Total Base Bid Price (In numbers and words): $ . Add Alternate. Additional layer to achieve R30 to lower level roof. Fully adhere new 2.6” Polylso Insulation (Twin Pack Method). $ . Submitted on: , 20 . Bidder: ---PAGE BREAK--- PRE-BID CONFERENCE ATTENDEES July 21st 2021 Public works Annex roof replacement Name/Representing Email Jerry Miller Covered Const. and Billboards [EMAIL REDACTED] Joe Gross Douglass Colony Group [EMAIL REDACTED] Cody Thomas Limmer Roofing Inc. [EMAIL REDACTED] Other Plan holders Arik Koch Rocky Mountain Reps [EMAIL REDACTED] Daniel Inman Roofing Inc. [EMAIL REDACTED].