← Back to Douglas

Document Douglas_doc_547e4e51a3

Full Text

Public Works Buildings 1 Addendum No. 1 Replacement Project July 23, 2019 ADDENDUM #1 To the BIDDING AND CONTRACT DOCUMENTS For the PUBLIC WORKS ROOF REPLACEMENT PROJECT Prepared for: City of Douglas 101 North Fourth St. Douglas, WY 82633 Date of the Addendum July 23, 2019 Receipt of this Addendum must be acknowledged by filling in the spaces provided below and including one copy attached to the bid. APPROVED: John Harbarger, Project Manager Date ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM: Company Name Signature Title Receipt Date ---PAGE BREAK--- Public Works Buildings 2 Addendum No. 1 Replacement Project July 23, 2019 ADDENDUM #1 To the BIDDING AND CONTRACT DOCUMENTS For the PUBLIC WORKS ROOF REPLACEMENT PROJECT Date of the Addendum July 23, 2019 This Addendum No. 1 to the Bidding Information and Construction Specifications and the Drawings is hereby made a part of the Contract Documents, for the above entitled project, to the same extent as though it were originally contained therein. All bidders are expected to thoroughly examine each item enumerated herein, regardless of its apparent application and shall be responsible for furnishing all labor and materials required in the division of work that the items indicate. I. GENERAL INFORMATION A. The contractor shall provide material that is equivalent or better than the specified Firestone product. B. Warranties will cover at minimum two-year weather-tightness for the entire roofing system; a manufacturer’s warranty with an FM I-120 rating against uplift; and a one and one-half inch (1 hail warranty. C. A manufacture’s inspection report of the completed roofing installation will be required. END OF ADDENDUM