ADDENDUM #1 To the BIDDING AND CONTRACT DOCUMENTS For the RICHARDS STREET IMPROVEMENTS PROJECT Project No. 22-069 Prepared for: City of Douglas 101 North Fourth St. Douglas, WY 82633 Date of the Addendum October 17, 2025 Receipt of this Addendum must be acknowledged by filling in the spaces provided below and including one copy attached to the bid. APPROVED: Jared Fehringer, Project Manager ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Company Name Signature Title Receipt Date ---PAGE BREAK--- 2 Addendum No. 1 ADDENDUM #1 To the BIDDING AND CONTRACT DOCUMENTS For the RICHARDS STREET IMPROVEMENTS PROJECT Project No. 22-069 Date of the Addendum October 17, 2025 This Addendum No. 1 to the Bidding Information and Construction Specifications and the Drawings is hereby made a part of the Contract Documents, for the above-entitled project, to the same extent as though it were originally contained therein. All bidders are expected to thoroughly examine each item enumerated herein, regardless of its apparent application and shall be responsible for furnishing all labor and materials required in the division of work that the items indicate. I. BID LETTING DATE/TIME CHANGE A. Sealed Bids for the City of Douglas – Richards Street Improvements Project will be received at Douglas City Hall, 101 North 4th Street, until 1:00 P.M. MST on October 22nd, 2025, and then will be publicly opened and read aloud. Any Bids received after the specified date and time will not be accepted or considered. II. SECTION I – CLARIFICATIONS A. HDPE storm pipe shall be dual wall, corrugated, smooth interior pipe. B. Curbwalk will not be allowed. C. All disturbed area shall be seeded with a minimum of 2-inches of topsoil. Final quantities are to be determined by the contractor. D. Per Detail 4 and 5 on Sheet 3, and per Section 01025 – Measurement and Payment – an 18-inch asphalt patch will be required adjacent to all new curb and gutter installation. E. Per Detail 1 and 2 on Sheet 4, and per Section 01025 – Measurement and Payment – an 18-inch asphalt patch will be required adjacent to all concrete approaches or aprons. F. Cold weather concrete placement shall be in accordance with Wyoming Public Works Standard Specifications Section 03310 - Concrete Work, Paragraph 3.03. ---PAGE BREAK--- 3 Addendum No. 1 III. SECTION II – PROJECT MANUAL A. DELETE the following DBE related sections from the project manual: i) DBE Participation Clause ii) DBE Certifications – E91 Form iii) DBE Regula Dealer/Distributor Affirmation Form B. Bid Schedule: DELETE existing BID SCHEDULE and REPLACE with the attached BID SCHEDULE – ADDENDUM 1 C. Section 01025 – Measurement and Payment: DELETE “Concrete Paving/flatwork” Section from MEASUREMENT AND PAYMENT and REPLACE with the following: Concrete Drive Aisle Section SY Includes all costs for placing the concrete flatwork in the areas shown in the drawing including 6-inches of concrete over 4- inches of grading base, subgrade preparation, base course for bedding, compacting, formwork, reinforcement, concrete, finishing, backfilling, and final grading complete. IV. SECTION III – CONSTRUCTION DRAWINGS A. SHEET 3 DETAILS-1: DELETE Sheet 3 DETAILS-1 and REPLACE with the following attached Sheet 3 DETAILS-1 ADDENDUM 1 B. SHEET 22 10th Street – 11th Street: DELETE Sheet 22 10th Street – 11th STREET and REPLACE with the following attached Sheet 22 10TH STREET – 11TH STREET - ADDENDUM 1 C. SHEET 25 Harrison Street: DELETE Sheet 25 HARRISON STREET and REPLACE with the following attached Sheet 25 HARRISON STREET - ADDENDUM 1 D. SHEET 31 Park Drive: DELETE Sheet 31 PARK DRIVE and REPLACE with the following attached Sheet 31 PARK DRIVE - ADDENDUM 1 V. SECTION III – INFORMATION A. Questions regarding the WYDOT bid forms and requirements may be directed to: Alyssa Quinn Local Programs Specialist [EMAIL REDACTED] (307) 777-4451 ---PAGE BREAK--- 4 Addendum No. 1 Cole Bostron Local Programs Coordinator [EMAIL REDACTED] (307) 777-4862 B. Pre-bid sign-in sheet is attached. END OF ADDENDUM ---PAGE BREAK--- LS = Lump Sum SY = Square Yard CY = Cubic Yard EA = Each LF = Linear Feet FA = Force Account Item Description Unit Quantity Unit Cost Total Cost 1 Mobilization and Bonds LS 1 2 Demolition and Traffic Control LS 1 3 Cast Iron Truncated Dome Mat EA 49 4 Curb Ramp EA 45 5 Striping (approx 1000 LF of 4" striping) LS 1 6 Thermoplastic Crosswalk LS 1 7 Solar Powered Pedestrian Activated Beacon EA 2 8 Reseeding (approx 5030 SY) LS 1 9 6-inch Base Coarse Driveway (alley between 10th and 11th) SY 215 10 Miscellaneous Asphalt SY 675 11 Parking Railing at Sidewalk LS 60 12 Concrete Sidewalk SY 2,875 13 Concrete Apron SY 1,100 14 Curb & Gutter (Type A) LF 350 15 Curb & Gutter (Type B) LF 1,400 16 Miscellaneous 5" Concrete over 4" Grading Base Course SY 415 17 Concrete Drive Aisle Section SY 300 18 Concrete Valley Gutter SY 90 19 Concrete Flow Channel SY 50 20 Sidewalk Chase EA 5 21 18" Galvanized Flared End Section (for HDPE or CMP) EA 2 22 24" Galvanized Flared End Section (for HDPE or CMP) EA 2 23 Area Inlet EA 15 24 Curb Inlet EA 16 25 Harrison Street Outfall (48"x60" boxes) EA 2 26 84" Manhole EA 1 27 12" HDPE LF 216 28 18" HDPE LF 920 29 24" HDPE LF 90 30 30" HDPE LF 281 31 30" RCP LF 7 32 Force Account FA 25,000 $1.00 25,000.00 $ TOTAL BID SCHEDULE BID SCHEDULE - ADDENDUM 1 E. Richards Street Improvements Project Bid Date - October 22nd, 2025 @ 1:00 P.M. Company Name: Address: Contractor shall furnish and install all work as shown on the Drawings and called for in the Contract Documents. All costs not specifically called out in this Bid Schedule that are necessary to provide a complete and functional project as intended by the Contract Documents, are to be considered incidental, and merged with the bid items in this Bid Schedule. Abbreviations used in this Bid Schedule have the following meanings: ---PAGE BREAK--- DETAILS -1 Civil Engineering Professionals, Inc. 6080 Enterprise Drive - Casper,Wyoming 82609 (307) 266-4346 (307) 266-0103 fax RICHARDS STREET IMPROVEMENTS 3 33 VERTICAL CURB ADA RAMP DETAIL NOT TO SCALE FLARED ADA RAMP DETAIL NOT TO SCALE 10 - GUAGE CAST IRON TRUNCATED DOME MAT COLOR: PATINA POWDER COATED BY: TOFTILE OR APPROVAL EQUAL NOT TO SCALE NOT TO SCALE SIDEWALK SECTION VARIES 1% MIN TO 2% MAX CROSS SLOPE DIRECTION VARIES -SEE PLANS 4" GRADING BASE COURSE 5" OF 4000 PSI PORTLAND CEMENT CONCRETE WITH POLYPROPYLENE FIBER REINFORCEMENT TYPE A-1 CURB & GUTTER (AS-NEED) LAY ASPHALTIC CONCRETE PAVEMENT 38" HIGHER THAN CONCRETE GUTTER ASPHALTIC CONCRETE PAVEMENT 6" 1" (0.08') 1'-6" 1'-0" 4" GRADING BASE COURSE 10-3/8" (0.86') 3-5/8" (0.30') 11" R 9" R 18" STREET PATCH 1 2 4 TYPE B CURB & GUTTER NOT TO SCALE 5 3 NOTE: SOME ADA RAMPS ARE A COMBINATION OF THESE STYLES. SEE PLANS NOT TO SCALE TYPIClAL ADA RAMP DETAIL 6 12:1 12:1 2.0% 6.0' 5.0' 6.0' 6.0' 6" CURB 10 - GUAGE CAST IRON TRUNCATED DOME MAT COLOR: PATINA POWDER COATED BY: TOFTILE OR APPROVAL EQUAL EXISTING ASPHALT LAY ASPHALTIC CONCRETE PAVEMENT 38" HIGHER THAN CONCRETE GUTTER ASPHALTIC CONCRETE PAVEMENT 18" STREET PATCH EXISTING ASPHALT 5" 6" 7" 23" 4" SLOPE 1/2"- FT 12" 6" 6" COMPACTED SUBGRADE BASE COURSE GRADING 4" FIBERMESH REINFORCED CONCRETE 10 - GUAGE CAST IRON TRUNCATED DOME MAT COLOR: PATINA POWDER COATED BY: TOFTILE OR APPROVAL EQUAL NOT TO SCALE CONCRETE DRIVE AISLE SECTION VARIES 1% MIN TO 2% MAX CROSS SLOPE DIRECTION VARIES -SEE PLANS 4" GRADING BASE COURSE 6" OF 4000 PSI PORTLAND CEMENT CONCRETE WITH POLYPROPYLENE FIBER REINFORCEMENT 7 1 ADDENDUM 1 1 ---PAGE BREAK--- 10TH STREET - 11TH STREET Civil Engineering Professionals, Inc. 6080 Enterprise Drive - Casper,Wyoming 82609 (307) 266-4346 (307) 266-0103 fax RICHARDS STREET IMPROVEMENTS 22 33 FOUR SEASONS CHINESE KEELER FAMILY 40.0' REMOVE ACCCESS DEMO DEMO 0 15' 30' INSTALL NEW INLETS PROPOSED BASE COURSE SURFACING PROPOSED CONCRETE VALLEY GUTTER REMOVE EXISTING APPROACH FOUR SEASONS CHINESE KEELER FAMILY 6.0' DEMOLITION PLAN CONSTRUCTION PLAN 40' ASPHALT BASE COURSE CONCRETE APPROACH CONCRETE VALLEY GUTTER CONCRETE MISC. SIDEWALK CURB & GUTTER (TYPE CURB & GUTTER (TYPE ADA RAMP (TYPICAL) TRUNCATED DOME MAT 1 ADDENDUM 1 1 ---PAGE BREAK--- HARRISON STREET Civil Engineering Professionals, Inc. 6080 Enterprise Drive - Casper,Wyoming 82609 (307) 266-4346 (307) 266-0103 fax RICHARDS STREET IMPROVEMENTS 25 33 ARROW ELECTRIC EDISS CHIROPRACTIC CLINIC ARROW ELECTRIC SUDSY DUDS EDISS CHRIROPRACTIC CLINIC 16.8' 24" SIDEWALK CHASE MATCH TO EXISTING SIDEWALK DEMO SUDSY DUDS 0 15' 30' INSTALL NEW INLET INSTALL NEW OUTFALL STRUCTURES DRAINAGE SWALE 6.0' 6.0' 6.0' DEMOLITION PLAN CONSTRUCTION PLAN INSTALL NEW INLET ASPHALT BASE COURSE CONCRETE APPROACH CONCRETE MISC. CONCRETE DRIVE AISLE SIDEWALK CURB & GUTTER (TYPE CURB & GUTTER (TYPE ADA RAMP (TYPICAL) TRUNCATED DOME MAT 5 1 5 2 30.0' 1 ADDENDUM 1 1 CONCRETE DRIVE AISLE ---PAGE BREAK--- PARK DRIVE Civil Engineering Professionals, Inc. 6080 Enterprise Drive - Casper,Wyoming 82609 (307) 266-4346 (307) 266-0103 fax RICHARDS STREET IMPROVEMENTS 31 33 VILLAGE INN SAFEWAY DEMO 0 15' 30' INSTALL NEW INLET INSTALL NEW INLET RELOCATE "NO PARKING" SIGN RELOCATE "NO PARKING" SIGN RELOCATE STOP SIGN DEMOLITION PLAN CONSTRUCTION PLAN VILLAGE INN SAFEWAY 6.0' 6.0' 4.5' 6.0' REMOVE AND REPLACE CONCRETE FLOW CHANNEL FLARED VALLEY PAN WITH NEW TYPE CURB EACH SIDE ASPHALT BASE COURSE CONCRETE APPROACH CONCRETE VALLEY PAN CONCRETE MISC. SIDEWALK CURB & GUTTER (TYPE CURB & GUTTER (TYPE ADA RAMP (TYPICAL) TRUNCATED DOME MAT RELOCATE "ONE WAY" SIGN 5 4 5 3 SIM 1 1 ADDENDUM 1 ---PAGE BREAK---