Full Text
City of Douglas Public Works Annex Roof Replacement Addendum # 2 7/23/21 1. Please use the attached schedule of pricing Noting the gutters have been removed from schedule of prices The intent of the project is for the existing gutters to remain undisturbed. Please acknowledge addendum 1 and 2 on the bid documents. End of addendum 2 ---PAGE BREAK--- SCHEDULE OF PRICES Unit prices for all items, all extensions and total amount of bid must be shown. Show unit prices in both words and figures and where conflict occurs, the written or typed words shall prevail and the bid shall be adjusted accordingly. SEE SCOPE OF WORK Item No. Approx. Quantity Item with Unit Price to be Written in Words Unit Price Dollars/Cents Total Price Dollars/Cents 1. Remove the existing roof and disposal. 2. Fully adhere new 2.6” Polylso Insulation (Twin Pack Method). 3. Fully adhere new 60 mil white Firestone TPO SA single-ply roof as per Firestone specifications. 4. Install all necessary flashing, fasteners, plates, adhesive, caulking, sealants, tapes and termination bars. 5. Flashing of all roof penetrations. ---PAGE BREAK--- 6. Fabrication and installation of new 24 gauge metal roof edging in choice of color. Total Base Bid Price (In numbers and words): $ . Add Alternate. Additional layer to achieve R30 to lower level roof. Fully adhere new 2.6” Polylso Insulation (Twin Pack Method). $ . Submitted on: , 20 . Bidder: ---PAGE BREAK--- PRE-BID CONFERENCE ATTENDEES July 21st 2021 Public works Annex roof replacement Name/Representing Email Jerry Miller Covered Const. and Billboards [EMAIL REDACTED] Joe Gross Douglass Colony Group [EMAIL REDACTED] Cody Thomas Limmer Roofing Inc. [EMAIL REDACTED] Other Plan holders Arik Koch Rocky Mountain Reps [EMAIL REDACTED] Daniel Inman Roofing Inc. [EMAIL REDACTED]. ---PAGE BREAK---