← Back to Columbia County, GA

Document Columbiacountyga_doc_5bda156faf

Full Text

LAND DISTURBANCE PERMITS May 2023 Projects Not Requiring LDP Approval: Minor land-disturbing activities such as home gardens and individual home landscaping, repairs, maintenance work, fences, etc. MINOR MAJOR Area of Disturbance Less than 1000- square-feet 1001-square-feet up to an Acre Equal to or Greater than 1 acre Application Fees $250 flat fee 1 – 5 Acres $300 (per acre) 5 – 10 Acres $350 (per acre) 10 – 25 Acres $400 (per acre) 25 Acres or Greater $450 (per acre) Project Details Within 200-feet of state waters* Part of a Common Development with an Open Primary Notice of Intent Part of a Common Development with a Closed Primary Notice of Intent Stand Alone, Residential Stand Alone, Commercial Stand Alone Linear/ Infrastructure Common Development If NOT within 200-ft of State Waters* If within 200-ft of State Waters* If NOT within 200- ft of State Waters* If within 200-ft of State Waters* If NOT within 200-ft of State Waters* If within 200- ft of State Waters* Type of Plan ES&PC Grading ES&PC ES&PC Grading ES&PC Grading ES&PC ES&PC ES&PC ES&PC Required Document(s) with Plan Checklist(s)  Green Book (Stand Alone Construction Projects)  Grading  Stormwater (Commercial only)  Green Book (Common Development Construction Projects)  Stormwater (Commercial only)  Green Book (Common Development Construction Projects)  Stormwater (Commercial only)  Grading  Green Book (Stand Alone Construction Projects)  Grading  Stormwater  Green Book (Stand Alone Construction Projects)  Stormwater  Green Book (Stand Alone Construction Projects)  Stormwater  Green Book (Linear Construction Projects)  Stormwater  Green Book (Common Development Construction Projects)  Stormwater Notice of Intent Secondary Tertiary None None Primary Primary Primary Pre-Construction Meeting Required X X X X Environmental Bond Required X X X * As measured from limits of disturbance to stream bank “Green Book” = Manual for Erosion and Sediment Control in Georgia. Checklist established by the commission as of January 1 of the current year shall be used. For ALL permit types and exemptions a Land Disturbance Permit application and Proof of certification (minimum Level IA) is required.