← Back to Cayugacounty Gov

Document cayugacounty_gov_doc_7161a903f9

Full Text

Town of Sterling Public Hearing Water District No. 3 June 5, 2017 Phone: [PHONE REDACTED], 70 Main St., Canton, NY 13617 Oswego Office: [PHONE REDACTED], 23 CR 6, Suite A, Phoenix, NY 13135 ---PAGE BREAK--- Development of the Town Water System… Only property owners in the Water District can vote (gray area shown on map). Property owners not in the Water District will not be charged for this project. ---PAGE BREAK--- Why Consider a Town Water System? Some documented water quality and quantity problems in this area of the Town, Interest expressed in recent questionnaire, Reasonable funding available. ---PAGE BREAK--- Public Water Can Save Money & Headaches! ELIMINATE: Pump repairs or replacement, Expensive water treatment systems and ongoing maintenance, Electric costs to operate well pump, Health related well contamination, Bad odors, tastes, stained laundry and fixtures from nuisance contaminants, Cost of bulk water when the well runs dry, Need to purchase bottled water. ---PAGE BREAK--- Cost for 20 oz. bottle of water = $1.36 Sales Tax = .10 TOTAL = $1.46 Sterling WD #3 Cost for 170 gallons = $1.96 Sales Tax = $0 TOTAL = $1.96 ---PAGE BREAK--- Public Water Can Save Money & Headaches! ENJOY: Water supply, even during power outages, Safe, monitored water, Good water pressure at all times, Enhanced fire protection, Potential reduction in insurance costs, Property sale advantages, Ability to fill pools without running well dry, Water to farms for crops and livestock. ---PAGE BREAK--- Engineering Report Details Potential Water Distribution System for the Residents of this area in the Town of Sterling ---PAGE BREAK--- Project Area Water Distribution System and 10” distribution pipes –25,000 L.F. –Hydrants every 600 feet. –Water service lines (4,500 L.F.) –All users will have water meters and meter pits. –No water storage tank required. ---PAGE BREAK--- Water Supply – Water District will receive water from the Village of Fair Haven. – Water quality is monitored by NYS Department of Health, and Village of Fair Haven. – Water supply is from two groundwater wells ---PAGE BREAK--- ---PAGE BREAK--- Water Project Funding and Financing Project Funding Agency: – USDA Rural Development ( RD) Town submitted pre-application in January 2017 for this project. RD issued a Preliminary Funding Estimate (PFE) for this project in April 2017. After negotiations with C2AE, a revised PFE was issued in May - $59,000 in add’l grant Interest Rates may start increasing The Town Board must complete the District formation process for USDA-RD to obligate the funds ---PAGE BREAK--- Historically speaking… This area’s water problems made it a priority NYS community for getting funding. Score = 85 pts Funding is based on Median Household Income (MHI) of the Town. The Town of Sterling MHI, as per the 2010 Census, is $44,364. (NYS Average is $56,882) ---PAGE BREAK--- Water Project Funding & Financing Total Project Cost $1,820,000 2.0 % RD Loan for 38 Years $1,270,000 RD Grant $550,000 Equivalent Dwelling Units (EDU) 104 1st Year Fixed Cost ( Loan Payment ) $48,044 Town Reserve Fund $50/EDU/Yr $5,200 1st Yr Fixed Cost/EDU (Loan + Reserve) $512/Yr Estimated Water Usage Cost $202/Yr Projected Annual Cost per Household $714/Yr Projected Daily Cost per Household $1.96/Day ---PAGE BREAK--- Estimated Water Project District Costs Average project 1st year cost per typical household will be approximately $714/yr.** Vacant Parcel is ½ EDU and cost – $256/yr. **Based on a residential home using 62,050 gallons per year (170 gpd) of water at the present 2017 Water Rate from the Village of Fair Haven - $3.25/1,000 gallons. Estimated typical connection cost will be between $600-$800. ---PAGE BREAK--- Typical Annual User Costs Voted on for Other Projects Town of New Haven WD #5 (approved) $672 Town of New Haven WSA #6 (approved) $779 Town of Mexico WSA #3 (approved) $743 Town of Volney CR 57 South WD (approved) $725 Town of Volney MacDougal 6/45 WD (approved) $781 Town of Volney Airport WD Ext #2 (approved) $755 Town of Volney Airport WSA #3 (approved) $812 Town of Volney CR 45/6 Baldwin WD (approved) $770 Town of Volney CR 57/6 North WSA (approved) $765 Town of Sterling WD #1 (approved) $701 Town of Sterling WD #3 (estimated Max) $714 ---PAGE BREAK--- Scheduled Events for Project –After the Public Hearing, the Town will schedule a Referendum Vote. ---PAGE BREAK--- In Conclusion District Vote – August 2017 Voting Rules If supported, construction could start Spring of 2018 at the earliest.