← Back to Cartersville, GA

Document Cartersvillega_doc_efb8df776e

Full Text

CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 1 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. CARTERSVILLE ELECTRIC SYSTEM Contractor’s Manual Note: Please check www.cityofcartersville.org for the most recent version of this manual. The City of Cartersville Electric System (CES) would like to take this opportunity to thank you for allowing us to serve you. To provide a safe and reliable electrical service connection and to prevent unnecessary delays, we have provided this manual of CES specifications. We wish to thank you in advance for your cooperation. The guidelines in this manual should be incorporated into design and construction of services and wiring systems being installed on structures being served by CES. To report outages or unsafe conditions: (770) 387-5631 CES Engineering Contact Personnel: Chad Prater Engineering Supervisor Office: (770) 387-5631 Vacant Engineering Coordinator Office: (770) 387-5631 Michael Collier Engineering Technician Office: (770) 387-5631 John Ferrese Control Center Operator Office: (770) 383-5631 Other Useful Phone Numbers: Customer (770) 387-5607 Call this number for information on making an Application for Electric Service Inspections 387-5600 Call this number for electrical inspections, scheduling a Development Committee Meeting and/or obtaining building / grading / land disturbance permits. Electric 387-5631 Call this number to schedule a meeting for electrical service to your construction project Gas (770) 387-5642 Water 387-5653 ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 2 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. Contents 1. Introduction 5 1.1. Purpose 5 1.2. Deviation or Conflict 5 1.3. Current Version 5 2. Definitions 5 3. General Requirements and Schedule Information 6 3.1. Coordination and Site Plans 6 3.2. Requirements to Energize Service 6 3.3. Schedule 8 3.4. Use of Service / Additions to Service / Connections to Service 8 4. Service Availability and General Requirements: 10 4.1. Class of Service. 10 4.2. General Service information and Policies. 10 4.3. Grounding 11 4.4. Minimum and Maximum Service Sizes. 11 5. Temporary Services 11 5.1. Connection Fees 11 5.2. Overhead Temporary Services 11 5.3. Underground Temporary Services 11 6. Overhead Services 12 6.1. General Requirements. 12 6.2. Attachment Hardware. 12 6.3. Service Mast, Conduit, and Service Entrance Conductors. 12 7. Underground Services 13 7.1. General Requirements 13 7.2. Requirements for pad-mounted transformers: 13 7.3. Service Entrance Conduit and Conductors. 13 8. Service Conductors, Conduit, and Hardware. 14 8.1. Conductor Size, Type, and Number of Runs. 14 8.2. Connectors. 15 8.3. Conduit and Straps. 15 ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 3 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 8.4. Hardware for Meter Sockets and Conduit Straps. 16 9. Distributed Generation (including Solar photovoltaic) 16 9.1. Application Process 16 9.2. Distributed Generation Equipment Requirements: 16 10. Metering Requirements 17 10.1. General Requirements. 17 10.2. Mounting and Labeling of Meter Sockets and Metering Equipment Cabinets. 17 10.3. Metering Equipment Locations 18 10.4. Work Space Requirements. 19 10.5. Specifications for Meter Sockets 19 10.6. Metering Installations 225 Amperes or Less for Each Individual Meter Position: 20 10.7. Metering Installations Greater Than 225 Amperes for Each Individual Position: 20 10.8. Metering at Voltages Greater than 600 volts. 21 11. CES Access to Equipment / Meter Tampering. 22 11.1. CES Access to Meters and Metering Equipment. 22 11.2. CES Access to Lines and Other Equipment. 22 11.3. Meter Tampering and Interference with City Property. 22 12. Required Clearance and Workspace Around CES Equipment. 22 12.1. Overhead Lines and Equipment. 22 12.2. Pad Mounted Transformers, Switches, and Termination Cabinets. 23 12.3. Metering Equipment. 23 12.4. Trees and Vegetation 24 12.5. Special Circumstances and Other Codes. 25 13. Customer Utilization Equipment. 25 13.1. Requirement to Balance Load 25 13.2. Requirements for Motors. 25 13.3. Requirements for X-Ray, Welders, Power Electronic and similar equipment. 25 13.4. Current and Voltage Harmonic Distortion Limits. 26 13.5. Protection for Customer Equipment. 26 13.6. Emergency or Stand-by Generators. 26 13.7. Portable Generators. 26 14. Service Interruptions and Outage Restoration. 27 14.1. General. 27 ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 4 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 14.2. Outage Restoration. 27 15. Work around CES lines and equipment. 27 15.1. Georgia Utility Facility Protection Act and High-voltage Safety Act. 27 15.2. Overhead Lines. 28 15.3. Easements. 28 Index 29 DESCRIPTION 30 APPENDIX 30 ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 5 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 1. Introduction 1.1. Purpose 1.1.1. This manual represents the policies and objectives of CES concerning service installations and revenue metering and is intended to provide general guidance to Customers, Engineers, Architects, Contractors and other parties regarding design and installation of electric services and metering equipment on the CES distribution system. 1.1.2. This manual is intended to provide general guidance and information but should not be considered a design specification or instruction manual. 1.2. Deviation or Conflict 1.2.1. Specific requirements may vary with each installation. Under certain circumstances, CES personnel may require or allow deviation from the standards, policy, and procedures stated in this manual due to safety, reliability, engineering, or maintenance requirements. 1.2.2. If any policy in this manual conflicts with City of Cartersville Development Regulations, National Electric Code (NEC), or National Electric Safety Code (NESC), the more stringent requirement shall generally apply. 1.3. Current Version 1.3.1. This document may be updated at any time. The current version of this document is located on the City of Cartersville website at www.cityofcartersville.org. Please check this website to be sure you are using the current version of this document. 2. Definitions 2.1. CES: City of Cartersville Electric System. (also known as Cartersville Electric System or City of Cartersville Electric Department). 2.2. City: The City of Cartersville, Georgia. 2.3. Customer: an existing or future customer of CES, or an agent such as a contractor, engineer, architect, electrician or other person involved in establishing or modifying electrical service to a location served by CES. This term is used interchangeably with the term “Customer’s Representative”. 2.4. Customer’s Representative: see “Customer” 2.5. Distributed Generation: Generation facilities owned by a CES customer and meeting certain requirements of State Law, City Ordinance, and CES policy. 2.6. Premise: The land and buildings of a user located on the user side of the service point. As applied to this document and CES policies, the following requirements also apply to a premise: 2.6.1. The premise must have a unique address assigned by the City of Cartersville or Bartow County building official. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 6 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 2.6.2. The premise must be a stand-alone building or be separated by a floor to ceiling wall with a fire rating acceptable to the fire marshal. Inspection by the fire marshal may be required. 2.6.3. Two or more buildings connected by a breezeway, common roof, or other similar structure attached to the buildings will be considered as one premise. 2.6.4. Electrical circuits that originate from one premise may not pass through, terminate, or exist in another premise. 2.6.5. Other definitions may apply when interpreting or applying NESC, NEC, International Fire Code, or other relevant codes and standards. 2.7. Solar Photovoltaic (Solar PV): System for converting solar radiation into electrical energy. Where connected in parallel with the CES distribution system, Solar PV will be considered Distributed Generation, see definition and requirements for Distributed Generation. 3. General Requirements and Schedule Information 3.1. Coordination and Site Plans 3.1.1. Schedule an appointment with a CES engineer or other qualified CES employee prior to installing any customer owned service equipment. The CES engineer or qualified employee, shall review the method of service, type and voltage of service required, location of service, and location of any other CES equipment to be installed. Schedule and any other project requirements will be reviewed at this time. The location of metering equipment and point of service must be designated by a qualified CES employee. CES will not be responsible for the cost associated with relocating electrical equipment. All meetings with CES personnel should be scheduled well in advance. Meetings with CES personnel will typically require a minimum of 24 hours (one business day) notice to schedule. “Same Day” or “Drop-In” meetings should not be expected. 3.1.2. To avoid utility conflicts and/or schedule delays, it is the recommendation of CES that all Commercial and Industrial projects served by one or more City of Cartersville Utilities submit plans for review through the City of Cartersville Planning and Development department. Contact the City Planner at [PHONE REDACTED] to schedule a Plan Review Meeting. 3.1.3. Site Development Plans that have been approved by the Development Committee reflect what is to be built. If the site plans change, new Site Development Plans must be submitted to the Development Committee for another review. A Stop Work order may be ordered for construction sites using unapproved plans or for construction not according to signed plans that have been approved by the Development Committee. 3.2. Requirements to Energize Service 3.2.1. Electrical Inspection. There must be a final electrical inspection made by the governing authority (City of Cartersville or Bartow County). This electrical inspection must be received by the CES dispatcher in order for CES to schedule the work to energize the ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 7 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. service. CES is prohibited from making the final connection between the CES distribution system and the customer’s wiring system until approval by the City of Cartersville or Bartow County has been received. 3.2.2. Application for Electric Service. An Application for Electric Service must be made with the City of Cartersville Customer Service Department, located on the first floor of City Hall at 10 North Public Square. 3.2.3. Request for Service. A CES Request for Service Form (CES3011) must be thoroughly completed for all services well in advance of required service date. This sheet contains all information concerning class and type of service desired, and is necessary for proper sizing of transformers, services, and metering equipment. No service will be connected until a properly completed Request for Service Form has been submitted to CES. A COPY OF THIS FORM IS CONTAINED IN THE ATTACHMENTS SECTION OF THIS MANUAL, DRAWING CES3011. 3.2.4. Payment. Payment of any required fees must be received before installation or connection will be scheduled. 3.2.5. Site conditions. Site conditions must comply with signed development plans (if applicable). Other conditions that must be satisfied as applicable: 3.2.5.1. Construction area shall be within 2" of final grade, free of any and all debris. 3.2.5.2. The contractor is responsible for all staking, including vertical, required for CES installations including curbs, building footprint, easements, limits of disturbance, and any other required points. 3.2.5.3. When CES facilities are installed in the vicinity of curbs after the curbs are installed, the curbs shall be poured and cured for a minimum of seventy-two (72) hours. 3.2.5.4. Work area must be readily accessible to CES personnel and equipment. The customer is responsible for coordinating the schedule and work of contactors or other utilities to avoid access conflicts. 3.2.5.5. Any trenching or cutting of existing concrete must be repaired by the customer. The customer is responsible for disposal of any concrete or asphalt. 3.2.5.6. CES will backfill and compact trenches and other areas excavated by CES personnel with earth and/or gravel. Any required compaction testing is the responsibility of the customer. CES must be notified of any areas requiring additional fill or compaction within three business days of the backfill and compaction of the area. Failure to notify CES within five business days will be considered as acceptance of backfill by the customer. Any additional backfill or compaction will be the responsibility of the customer. 3.2.5.7. Completion of any work that was agreed to in prior meetings with CES. 3.2.6. Note that the final inspection by the governing authority does not constitute acceptance by CES; the final inspection assures that customer wiring meets pertinent provisions of ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 8 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. the NEC or other applicable codes. CES uses the National Electric Safety Code (NESC) as a guide for service installations. CES reserves the right to impose additional service requirements above and beyond the electrical inspection. 3.2.7. The customer or their representative must be present in order for CES to energize any service, except for temp poles. 3.3. Schedule 3.3.1. Where electric distribution facilities already exist to serve a facility, a minimum five business day period for final connection should be expected once inspection, application, request for service (load sheet), and other requirements for electric service have been satisfied. CES is required under Georgia law to contact the Utilities Protection Center (UPC) three business days prior to any digging. 3.3.2. Where overhead distribution lines must be constructed to provide electric service to a location, please allow a minimum 8 weeks for engineering, coordination with other utilities, material procurement and construction. 3.3.3. Where underground distribution lines must be constructed to provide electric service to a location, please allow a minimum of 16 weeks for engineering, coordination with other utilities, material procurement and construction. 3.3.4. For large industrial or commercial projects, certain materials may require more than 26 weeks lead time for procurement. These projects can also require a significant amount of engineering and coordination. Please allow sufficient time for material procurement and engineering. 3.3.5. Projects requiring CES lines or equipment to be installed in GDOT, railroad, electrical transmission, or other similar rights of way or easements are subject to permit approval prior to CES construction. Once submitted, CES does not have any control over permit approval timeline. Please allow sufficient time for permit submittal and approval if required. 3.4. Use of Service / Additions to Service / Connections to Service 3.4.1. Electric services and metering equipment are designed by CES to serve customer's load as it exists when connected to the distribution system; it is the customer's responsibility to notify CES in advance of any significant load additions. This includes but is not limited to air conditioners, heat pumps, and swimming pools. 3.4.2. Services will be used only in such a manner so as not to disturb CES service to other customers. 3.4.3. The customer's wiring and equipment should be maintained in condition required by relevant authorities and codes. 3.4.4. All connections between CES service and customer service entrance conductors and all connections at the secondary terminals of CES distribution equipment shall be made by qualified CES employees. Unauthorized connection by the customer may result in tamper ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 9 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. fees, fines, and repair costs being assigned to the customer. See section 11.3 for additional details. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 10 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 4. Service Availability and General Requirements: 4.1. Class of Service. CES will provide secondary voltages under the appropriate conditions as follows: 4.1.1. From Overhead Lines 4.1.1.1. 120V, 1-phase, 2-wire 4.1.1.2. 120/208V, 1-phase, 3-wire 4.1.1.3. 120/240V, 1-phase, 3-wire 4.1.1.4. 120/240V, 3-phase, 4-wire, Open Delta 4.1.1.5. 120/240V, 3-phase, 4-wire, Closed Delta (as approved by CES) 4.1.1.6. 120/208V, 3-phase, 4-wire, (as approved by CES) 4.1.1.7. 480V, 3-phase, 3-wire (as approved by CES) 4.1.1.8. 277/480V, 3-phase, 4-wire (as approved by CES) 4.1.2. From Underground Lines 4.1.2.1. 120V, 1-phase, 2-wire 4.1.2.2. 120/208V, 1-phase, 3-wire 4.1.2.3. 120/240V, 1-phase, 3-wire 4.1.2.4. 120/208V, 3-phase, 4-wire (as approved by CES) 4.1.2.5. 480V, 3-phase,3-wire (as approved by CES) 4.1.2.6. 277/480V, 3-phase, 4-wire (as approved by CES) 4.1.3. CES will provide primary voltage supply to customers at their discretion and as project conditions dictate. 4.2. General Service information and Policies. 4.2.1. CES will connect only one service to a premise (see definition for premise). 4.2.2. CES will install only one revenue meter per customer. Meter readings of two or more meters will not be combined for billing purposes except for certain applications as approved by a qualified CES employee. 4.2.3. A qualified CES employee will make the determination which service classes are available at your location. Please confirm service details with a qualified CES employee prior to starting work. 4.2.4. To ensure prompt service, the customer or customer’s representative must complete a CES Request for Service Form (CES3011). This form provides CES with the information needed to determine if the desired electrical service will be available at the electrical service location. A CES Request for Service must be thoroughly completed for services well in advance of required service date. This sheet contains all information concerning class and type of service desired, and is necessary for proper sizing of transformers, services, and metering equipment. No service will be connected until a properly ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 11 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. completed CES3011 Request for Service Form has been submitted to CES. A COPY OF THIS FORM IS CONTAINED IN THE ATTACHMENTS SECTION OF THIS MANUAL. See drawing CES3011. 4.3. Grounding 4.3.1. Grounds required by NEC must be provided by customer in all cases. 4.3.2. All systems (electrical, phone, catv, satellite, etc) shall be grounded in accordance with the latest revisions of the National Electric Code (NEC) and CES Contractor’s Manual. 4.4. Minimum and Maximum Service Sizes. 4.4.1. All residential and commercial services must meet a minimum kW requirement and the cost of service shall not exceed 3 times the anticipated annual revenue. Should the cost of service exceed 3 times the annual revenue, the customer will be required to pay all or a portion of the construction cost. CES reserves the right to make any adjustments to this calculation where special circumstances exist. 4.4.2. CES reserves the right to specify the maximum service size for any particular class of service. 4.4.2.1. Single-phase 120/240V residential services larger than 400A must be reviewed and approved by CES engineering prior to start of construction. 4.4.2.2. Single-phase 120/240V commercial services are limited to 600A unless specific approval has been obtained from CES engineering. 5. Temporary Services 5.1. Connection Fees 5.1.1. Residential Temporary Connection Fees are $45.00 per service. 5.1.2. Commercial Temporary Connection Fees are $90.00 per service. 5.2. Overhead Temporary Services 5.2.1. Where possible, overhead temporary service poles should be placed so that CES temporary service wires may be relocated to the permanent service location without splicing the wires. However, customer must contact CES to determine where temporary service structure may be located. 5.2.2. Temporary service installations should be constructed with the same care as permanent service installations and in accordance with all applicable electrical and building codes. 5.2.3. Temporary service poles and ground rods shall be installed by the customer in accordance with CES specifications. THIS SPECIFICATION IS CONTAINED IN THE ATTACHMENTS SECTION OF THIS MANUAL, DRAWING CES 3009 5.3. Underground Temporary Services ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 12 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 5.3.1. Underground temporary services should be located within five feet of the left rear corner of the pad-mounted transformer or other location designated by a qualified CES employee. 5.3.2. Temporary service installations should be constructed with the same care as permanent service installations and in accordance with all applicable electrical and building codes. 5.3.3. The temporary service pole and ground rod will be provided by the customer. However, due to safety concerns, this service pole will be installed by qualified CES employees. THIS SPECIFICATION IS CONTAINED IN THE ATTACHMENTS SECTION OF THIS MANUAL, DRAWING CES3008 5.3.4. The Customer is responsible for protecting CES stub-ups located on the Customer’s site, or within the Customer’s work area. The customer will be responsible for all costs to repair, extend, or relocate the stub-up if it is damaged, or if the site elevation (cut or fill) is significantly changed by the customer. 6. Overhead Services 6.1. General Requirements. 6.1.1. Availability and class of overhead service should be confirmed with qualified CES employee before construction begins. 6.1.2. The point of connection between CES service drop and customer wiring should be located at a point convenient to both parties; however, CES reserves the right to specify the point of connection. 6.1.3. To prevent problems and delays, service points should be coordinated with CES engineering well in advance of date service is required. The point of connection must provide clearances as shown on the appropriate drawings in this manual. The point of connection should not be more than twenty-five feet (25') above final grade unless necessary to provide required clearances. SEE DRAWING CES 3004, SHEET 1 OF 3, SHEET 2 OF 3 & SHEET 3 OF 3. 6.2. Attachment Hardware. 6.2.1. CES will provide the hardware necessary for attaching the service drop to the building. The customer is responsible for installing hardware in a secure manner. The Customer may provide attachment hardware subject to CES approval. For attachment points other than service masts, typical attachment hardware will be ½” diameter or greater eye bolt or toggle bolt that extends through a roof joist, rafter, or other solid lumber framing member. 6.2.2. The attachment point must be securely fastened and/or supported by structural members. Screw-eyes or screw in “House Knobs” cannot be used. 6.3. Service Mast, Conduit, and Service Entrance Conductors. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 13 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 6.3.1. General service conductor and conduit requirements are listed in Section 8 of this document. 6.3.2. As required by NEC, the service mast must be capable of safely withstanding the strain imposed by the service drop or overhead service conductors. 6.3.3. CES requires all overhead service attachment points to safely withstand a minimum of 200 pounds of force in any direction. Additional bracing, guying, or other requirements may apply depending on the specific circumstances of the service. 6.3.4. The grounded conductor of service entrance conductors shall be plainly marked, unless it is white, neutral gray, or bare. 7. Underground Services 7.1. General Requirements 7.1.1. Availability and class of underground service should be confirmed with CES before construction begins. 7.1.2. To prevent delays, underground fees and facilities charges (lot fees) should be paid well in advance of the required service date. 7.1.3. SEE DRAWING CES3007 for typical underground residential service. 7.1.4. The point of connection between CES service lateral and customer wiring shall be determined by a qualified CES employee. 7.2. Requirements for pad-mounted transformers: 7.2.1. Barriers or Bollards. Any pad-mounted transformer subject to vehicular traffic shall have six-inch protective barriers or bollards, filled with concrete, four feet above final grade installed by customer / contractor around each transformer and approximately three feet from transformer corners and must not impede the opening of the transformer doors or conflict with the meter pedestal. 7.2.2. Transformer Pad. Please refer to DRAWING CES3012 & CES3013 for pad specifications and dimensions. CES will provide the concrete pad. 7.2.3. A qualified CES employee will determine transformer location as well as where conduits should be located relative to the transformer pad. 7.2.4. See Section 12 for vegetation restrictions and clearance requirements around pad mounted equipment including transformers. 7.3. Service Entrance Conduit and Conductors. 7.3.1. General service conductor, conduit, and hardware requirements are listed in Section 8 of this document. 7.3.2. Surface mounted conduit must be securely fastened to the wall within twelve inches (12") of the meter socket and six inches of the final grade level. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 14 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 7.3.3. For three phase underground services, the customer shall provide the service cable, conduit, metallic metering conduit, and bollards per CES specifications. REFER TO THE FOLLOWING SPECIFICATIONS IN THIS MANUAL, DRAWING CES 3001 & CES 3006. 7.3.4. For three phase underground services that are being served from an overhead transformer bank, the customer shall provide the service cable, conduit, metallic metering conduit, and bollards (as required) per CES specifications. The customer is responsible for installing conduit and attaching to CES pole. SEE DRAWINGS: CES3001 & CES3017 7.3.5. For three phase underground services (served from overhead or underground transformers), it is the responsibility of the Customer to notify the CES Engineering Department of secondary service conductor size and number of conductors that are requested per phase. Refer to Section 8 for acceptable wire types and the maximum number of service runs allowed per service size. 7.3.6. CES will provide and install standard lugs to make final connections of customer service to CES distribution. Refer to Section 8 for connector details. 7.3.7. CES may refuse to connect service conductors that have a number of runs, type, or size other than those listed as acceptable in this manual. Refer to “Service Conductors” in section 8 for the maximum number of service runs, conductor type, and conductor allowed per service size. 7.3.8. CES will install underground single-phase commercial services up to and including 600 Amp services and at up to one hundred feet (100'). The customer is responsible for installing service conduit(s) from the service point to the transformer, property line, or city right-of-way as required by CES Engineering Department. Underground services will be governed by the appropriate reimbursement or facilities policy of CES. Please contact the CES Engineering Department for the latest policy information. SEE DRAWINGS: CES3003 & CES3016 for typical single phase, underground meter installations. 8. Service Conductors, Conduit, and Hardware. 8.1. Conductor Size, Type, and Number of Runs. 8.1.1. The following conductor sizes are allowed: 2 AWG, 1/0 AWG, 2/0 AWG, 3/0 AWG, 4/0 AWG, 250 kcmil, 350 kcmil, 400 kcmil, 500 kcmil, 600 kcmil, 750 kcmil. (NOTE: “kcmil” is also known as “MCM”). The allowed conductor sizes refer only to standard concentric conductors. Compressed or compact conductors may be used with CES approval but their use may result in delays in connecting service. CES is not responsible for delays in connecting service when sizes or types of wire other than those listed above are used. 8.1.2. Service Conductors shown above can be either stranded copper or stranded aluminum. 8.1.3. Maximum number of underground service runs allowed per service size: 8.1.3.1. Up to and including 400 amp 1 run ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 15 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 8.1.3.2. 401 amp to 600 amp 2 runs 8.1.3.3. 601 amp to 1000 amp 3 runs 8.1.3.4. 1001 amp to 1200 amp 4 runs 8.1.3.5. 1201 amp to 1600 amp 5 runs 8.1.3.6. Greater than 1600 amp Coordinate with CES Representative 8.2. Connectors. 8.2.1. For service conductors that meet the requirements of section 8.1 above, CES will provide the connectors to terminate customer owned three phase service conductors at the power transformer. Any deviation from the conductor sizes requires prior approval from a CES representative. 8.2.2. If compacted or compressed conductors are used, the customer may be required to provide appropriate UL listed lugs for termination by CES personnel. CES reserves the right to inspect and approve customer provided lugs prior to installation. 8.3. Conduit and Straps. 8.3.1. Conduits for service masts used as an attachment point for CES service conductors shall be Rigid Galvanized Steel with a minimum trade size of 2 inches. 8.3.2. Conduit for underground service laterals shall be a minimum of two and one half inch (2 1/2") trade size. 8.3.3. Conduit for underground service laterals shall extend vertically downward twenty-four inches to thirty inches (24" to 30”) below final grade level. The customer must extend the conduit below or beyond the concrete footing so as to provide a minimum of six inches of clearance between the concrete and the conduit end. 8.3.4. Conduits used for metering circuits shall be Rigid Galvanized Steel or Intermediate Metal Conduit. Other conduit types are not allowed. Minimum conduit trade size is 1.5 inches. 8.3.5. A spare conduit is allowed for underground services. 8.3.6. Conduit straps for service masts and service entrance conduit shall be the correct size for the conduit and shall be installed to fully support the weight of the conduit system and conductors. Service masts shall not use the meter socket as a support structure. Other service entrance conduits shall not use the meter socket as a support structure except as specifically allowed by NEC or other portions of this manual. 8.3.7. Conduit straps shall be attached directly to the face of the supporting structure. If space exists between the conduit and the face of the supporting structure, install blocking between the conduit and supporting structure as required to extend the supporting structure to the conduit. No gap shall exist between the strap and the mounting surface and/or blocking. 8.3.8. Customer owned electrical conduits attached to CES pole. 8.3.8.1. No more than 2 customer owned conduits can be attached directly to CES pole. See drawing CES3017, figure 1. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 16 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 8.3.8.2. No more than 3 customer owned conduits can be attached to CES pole if using construction as shown on drawing CES3017, figure 2. 8.3.9. Specific requirements for overhead services are listed in Section 6. 8.3.10. Specific Requirements for underground services are listed in Section 7. 8.4. Hardware for Meter Sockets and Conduit Straps. 8.4.1. The following hardware shall be used for mounting meter sockets, instrument transformer cabinets, and conduit straps. 8.4.1.1. Metal anchors - in brick or solid concrete 8.4.1.2. Toggle bolts - in other masonry or wood siding 8.4.1.3. Wood screws - in 2" x 4" studs, log walls or other solid lumber 8.4.1.4. All screws and bolts used to secure any socket or cabinet shall be a minimum of 1/4" stainless steel. A minimum of four fasteners shall be installed on any socket or cabinet. 8.4.2. All hardware shall be of sufficient strength and quantity to securely withstand the strain imposed by conductors, conductor attachment points, and meter installation and/or removal. 9. Distributed Generation (including Solar photovoltaic) 9.1. Application Process 9.1.1. Customers desiring to interconnect and/or sell electrical energy to CES produced by a distributed generation facility must meet certain eligibility requirements as defined by applicable State Law, City Ordinance, and CES policy. 9.1.2. Prior to interconnecting a distributed generation facility, the customer must complete and have approved the following documents as required by city ordinance: 9.1.2.1. Application for Interconnection of Distributed Generation Facility. 9.1.2.2. Interconnection Agreement. 9.1.2.3. Electrical power exchange Agreement. (Note: CES currently uses a combined Power Exchange-Interconnect Agreement). 9.2. Distributed Generation Equipment Requirements: 9.2.1. Detailed equipment requirements are described in the Application for Interconnection of Distributed Generation Facility, and Interconnect and Power Exchange agreements. 9.2.2. In addition to other applicable standards, distributed generation equipment must meet current UL1741 and IEEE1547 requirements. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 17 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 9.2.3. The Customer must provide a manual, lockable, load break disconnect switch that provides a visible air gap to provide electrical separation between the Customer’s system and CES facilities. 10. Metering Requirements 10.1. General Requirements. 10.1.1. Metering is typically performed at secondary distribution voltages. See Section 4 for standard secondary distribution voltages. 10.1.2. CES will furnish, test and maintain adequate revenue metering equipment to accurately measure the customer's use of electrical energy. 10.1.3. All meter locations and installation methods must be approved by qualified CES personnel. 10.1.4. Only ringless meter sockets may be installed. Ring type meter sockets shall not be used. Where electrical service has been disconnected from a location with a ring type meter socket, CES may require the meter socket to be replaced with a ringless type meter socket. See Section 10.5 for additional meter socket specifications. 10.1.5. Any metering equipment furnished by CES is to be installed by the customer (meter sockets, meter cabinets, etc.) and will be supplied as complete units in good operating condition. This equipment is the property of the customer and shall be used only for metering CES customers. Access will be controlled by CES. 10.1.6. Connections to all meters, current transformers, or metering equipment which affect the accuracy of these devices, shall be made by a qualified CES employee. CES will control access to this equipment. 10.1.7. Non-current-carrying metal parts of meter sockets and current transformer cabinets shall be bonded to the service grounded conductor (neutral) in the enclosure. Grounding electrode conductors shall not originate in, pass through, or be attached to meter sockets or current transformer cabinets. 10.1.8. Meter sockets and current transformer cabinets shall not be used as junction boxes or race-ways for the connection of branch circuit or feeder conductors, or for the connection of sub-sets of service conductors supplying separate service locations for the same or different premises. 10.1.9. Where aluminum conductors are terminated in meter sockets or other service or metering equipment, inhibitor of the non-grit type shall be used in each conductor terminal and around the circumference of each conductor, including the grounded conductor (neutral). 10.1.10. Only one conductor shall be permitted in each terminal of meter sockets. 10.1.11. For safety reasons, CES requires that the customer must provide and install a disconnect switch on the line side of the any self-contained meter for all 480 volt services. 10.2. Mounting and Labeling of Meter Sockets and Metering Equipment Cabinets. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 18 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 10.2.1. Meter sockets are listed as surface mounted equipment and must be installed as such. No other method will be approved. 10.2.2. To insure safety, accuracy, and reliability of service it is necessary that meter sockets and metering equipment cabinets be securely installed in level and plumb position. 10.2.3. Meter sockets, instrument transformer cabinets, and conduit straps shall be installed with hardware as specified in Section 8. 10.2.4. In order to avoid delays in providing service, for meter sockets installed on multi-unit buildings (apartments, condominiums, or commercial) both the building and the building unit served must be accurately, clearly, and permanently labeled before meters are installed. Each meter socket position must be labeled on both the inside and outside surfaces with letters or numbers at least one inch in height of a contrasting color. Painted numbers or numbered stickers to be used. Labeling with a permanent marker is not permitted. 10.2.5. Proof of electrical permit will be required before CES issues any metering equipment. Equipment issued must be installed at location listed on permit. 10.3. Metering Equipment Locations 10.3.1. Metering equipment shall be located on the outside of the customer's building. Indoor installation of metering equipment, including equipment rooms or meter rooms, is not allowed. 10.3.2. In certain circumstances, CES personnel may approve or require metering equipment to be installed on an approved pedestal adjacent to the CES pad-mounted transformer. Meter socket and pedestal, if instructed will be provided by CES. The customer must install these devices as per DRAWING CES3006. 10.3.3. Meters and meter sockets will not be installed on pad-mounted transformers. 10.3.4. Current transformers shall be located outdoors. 10.3.5. For locations where permission has previously been granted by CES to locate metering equipment indoors, adequate lighting shall be provided to allow for safe installation, operation, and testing. The customer is responsible for furnishing, installing, and maintaining all boards necessary for mounting metering equipment on indoor installations. Such boards must be 3/4" exterior grade plywood. 10.3.6. Meter sockets and current transformer cabinets shall not be located in coal or wood bins, sheds, attics, bedrooms, bathrooms, toilet rooms, kitchens, stairways, carports, patios, furnace rooms, basements where the only entrance is through a trap door, or in any location where there is less than six feet, six inches of headroom. 10.3.7. Meter sockets and current transformer cabinets shall be located so the center will be between 3’-6” and 5’-6” above final grade level. These dimensions also apply with respect to the floor where special permission has been obtained to locate the metering equipment indoors. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 19 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 10.3.8. Metering equipment shall not be installed within three feet of any gas meter, gas regulator, or gas fuel line. Gas utility regulations may be more stringent and may require additional separation. Please consult with the natural gas utility to determine appropriate clearances between electrical service equipment and natural gas facilities. 10.3.9. Metering equipment should not be installed adjacent to a driveway, walkway, parking lot or any location that will subject the meter to damage. If CES personnel determine that the meter location is subject to damage, the customer may be required to furnish and install protective barriers or enclosures to prevent damage to the equipment. 10.3.10. Metering accuracy is of most importance to CES and its customers. Therefore, the Meter Department Supervisor shall have the option to disallow any meter location he/she determines may cause erroneous registration. 10.4. Work Space Requirements. 10.4.1. See Section 11 for CES access requirements to metering equipment and other CES equipment. 10.4.2. See Section 12 for work space requirements around CES metering equipment and other CES equipment. 10.4.3. CES reserves the right to disconnect power without notice to locations that do not have adequate work space around CES metering equipment. 10.5. Specifications for Meter Sockets 10.5.1. Customer furnished equipment shall be UL listed, and the label, symbol, or other identifying mark used by the testing laboratory shall be affixed to the unit. 10.5.2. Each meter socket position shall be rated not less than the rating of the service equipment when used on single-family dwellings. When multi-position meter sockets are used on multi-family dwellings, each meter socket position shall be rated not less than the ampacity of the service or feeder conductors connected to the load-side of the socket position. 10.5.3. Line-side connectors of meter-socket assemblies to be connected to CES-owned underground service laterals may be obtained from CES. Connectors provided by the customer must be approved by CES. The main bus of assemblies so connected shall be rated not less than 100 amperes multiplied by the number of meter positions in the assembly and not more than 1000 amperes. 10.5.4. Line-side connectors shall be designed, tested, and listed (UL486B) for the conductors (size and number) utilized in the assembly. Recommended torque values for all connectors shall be clearly marked in the compartment where the terminal is located. All conductors’ strands shall be contained beneath the connector pressure device (set screw, pad, etc.). 10.5.5. All meter socket jaws shall be spring reinforced. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 20 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 10.5.6. Only ringless meter sockets may be installed. Ring-type meter sockets shall not be used. Where existing ring type sockets are already in service, they must be equipped with CES approved screw-type sealing rings. 10.5.7. Terminals for more than one conductor and terminals used to connect aluminum conductors must be of a type approved for the purpose. CES will not terminate more than one conductor (CES-owned underground service lateral) under one pressure device (set screw, pad, etc.). 10.5.8. Conductors carrying unmetered energy shall not be contained in the same compartment or raceway with conductors carrying metered energy. 10.5.9. Units installed outdoors must be of weatherproof (NEMA Type 3R) construction. A unit is considered to be outdoors unless it is installed within the confines of the main structure of the building and totally protected from the weather. 10.5.10. Multi-position customer furnished meter sockets shall be constructed such that the line- side wiring compartment is separate from compartments housing service equipment or meter sockets and is accessible without having to remove any meter(s). Each individual meter position's cover shall be removable without having to remove any other meter(s). 10.5.11. The customer shall be responsible for all maintenance of meter sockets. 10.6. Metering Installations 225 Amperes or Less for Each Individual Meter Position: 10.6.1. A standard self-contained UL listed meter socket shall be installed by the customer. Meter socket may be obtained from CES or supplied by customer. 10.6.2. See drawings CES3002, CES3014, and CES3015 for typical meter socket installation. 10.6.3. When more than one metering position is needed, as in apartments, multiple ganged meter sockets or meter packs must be used. All meter sockets or meter packs must be UL rated. These units must be installed to the following specifications: Refer to drawing # CES3018 and CES3019 for recommended meter installation which uses multiple individual meter sockets. 10.6.4. See section 6 for specific overhead service requirements. 10.6.5. See Section 7 for specific underground service requirements. 10.6.6. See Section 8 for conductor and conduit requirements. 10.7. Metering Installations Greater Than 225 Amperes for Each Individual Position: 10.7.1. When the service entrance conductor ampacity is greater than 400 amperes, current transformers furnished by CES shall be used. 10.7.2. At the discretion of CES Engineering Department Supervisor and Meter Department Supervisor, commercial services up to 600 amp may be self-contained and no instrument transformers will be used. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 21 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 10.7.3. Current transformers may be issued to the customer for installation or installed by CES employees. When installed by CES employees, the customer may be required to install a device for the purpose of mounting the transformers. A transformer rated meter socket shall be furnished by CES and installed by the customer. 10.7.4. The customer shall furnish and install a one and one-half inch trade size rigid metal conduit or intermediate metal conduit from a point within twelve inches of the current transformers into the meter socket or test switch cabinet. A qualified CES employee will determine where to mount the conduit. 10.7.5. The maximum allowable distance from the meter location to the instrument transformers will be determined by a qualified CES employee. A maximum of two 90-degree bends or equivalent is allowed in each run of conduit. All conduit ends must be reamed to protect the meter control cable. All conduit fittings and joints must be threaded and listed for grounding purposes. SEE DRAWING: CES3006 10.7.6. CES metering transformers shall not be located in the customer's switchgear, unless approved in advance by qualified CES personnel. Metering transformers installed in customer’s switchgear will typically only be approved when no other metering installation acceptable to CES is possible. When metering transformers are approved to be located in the customer’s switchgear, they shall be installed by the switchgear manufacturer at the customer's expense. Such transformers shall be installed ahead of all load and be in a separate compartment of the switchgear of each service. Each compartment shall be equipped with a hinged and sealable door and each compartment shall be located such that CES metering personnel will have clear and unobstructed access to the transformers. Access shall be controlled by CES. 10.7.7. On multi-unit buildings where a wiring trough is utilized in feeding several customers, and one or more of these customers is metered with transformers, CES requires that a disconnect switch be installed by the customer and readily accessible to CES and on the load side of the transformer cabinet(s). The disconnect device shall accept a CES lock. The purpose of this switch is to enable CES to disconnect and reconnect service to such customers without interruption of other customers fed from the same trough. SEE DRAWING: CES3001 & CES3003. 10.7.8. The Customer is responsible for providing and installing lugs to make connection of customer service in wiring troughs. 10.8. Metering at Voltages Greater than 600 volts. 10.8.1. Service at voltages greater than 600 volts is subject to special negotiations between the customer and CES. The meter and service installations for this type of service require special engineering consideration. A CES engineer should be consulted well in advance of the time such service will be required so that necessary design and construction work and equipment availability may be properly coordinated. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 22 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 11. CES Access to Equipment / Meter Tampering. 11.1. CES Access to Meters and Metering Equipment. 11.1.1. CES metering equipment shall be unobstructed and accessible to CES personnel or other authorized city personnel at all times as required by City Ordinance. 11.1.2. Metering Equipment shall not be located within an enclosed fence, behind a locked gate or door, or in any other location that is not readily accessible to CES personnel. 11.1.3. Metering equipment may be considered obstructed if the customer does not provide or maintain clearances around metering equipment as required by this document and other relevant codes, ordinances, or standards. 11.2. CES Access to Lines and Other Equipment. 11.2.1. All CES equipment, including Meters, Transformers, Cable, and other CES owned equipment shall be readily accessible to CES personnel at all times. CES reserves the right to disconnect service without notice to equipment that is not readily accessible to CES personnel. Fees, penalties, and/or fines may apply as allowed by City Ordinance. 11.2.2. Most CES lines have a 30’ easement around overhead lines and a 15’ easement around underground lines. Contact CES prior to any construction in CES easements. 11.3. Meter Tampering and Interference with City Property. 11.3.1. It is illegal for any person intentionally and without authority to damage or destroy any meter or metering equipment, or to prevent any meter from properly registering the service supplied by CES, or to divert or otherwise use without authority any service supplied by CES. Violators are subject to a $250.00 fee by CES plus labor, equipment and material costs as applicable. Violators are also subject to prosecution and/or fines to the fullest extent allowed by City Ordinance. Cutting a meter seal or any other unauthorized access, removal, or alteration to CES metering equipment will be considered as meter tampering. 11.3.2. All persons are prohibited from interfering with or disturbing CES electric distribution lines and equipment. Violators are subject to penalties and/or prosecution to the fullest extent allowed by City Ordinance or State Law. Examples of interference or disturbance of CES distribution equipment include but is not limited to: 11.3.2.1. Unauthorized use, manipulation, operation, removal, or relocation of CES equipment or lines. 11.3.2.2. Causing damage to CES equipment or lines. 11.3.2.3. Un-authorized connection to (or disconnect from) CES equipment or lines. 11.3.2.4. Any action that causes a safety hazard involving CES owned lines or equipment. 12. Required Clearance and Workspace Around CES Equipment. 12.1. Overhead Lines and Equipment. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 23 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 12.1.1. CES requires a minimum clearance of 14 feet in all directions between CES overhead lines and any new sign or billboard. This requirement applies to the system neutral and to all lines over 750V to ground. 12.1.2. For overhead lines less than 750V to ground, CES requires a minimum clearance of 16.5 feet over roads, alleys, driveways, and any other area subject to truck traffic. For areas not subject to truck traffic, CES typically requires a minimum clearance of 12.5 feet above ground. 12.2. Pad Mounted Transformers, Switches, and Termination Cabinets. 12.2.1. Distance from Eave or Overhang of Building. The State Fire Marshal of Georgia requires that any pad-mounted transformer be installed with at least 10’ between the edge of the transformer pad and building, building overhangs, canopies, exterior walls, balconies, exterior stairs and/or walkways connected to the building. Because some transformers overhang the edge of the pad, transformer pads will typically be installed at least 12’ from the building to ensure adequate clearances. 12.2.2. Distance from Entrance or Exit of Building. The State Fire Marshal of Georgia requires that any pad-mounted transformer be installed with at least 14’ between the edge of the transformer pad and any door on the building. Because some transformers overhang the edge of the pad, transformer pads will typically be installed at least 16’ from any door on the building to ensure adequate clearances. 12.2.3. Distance from Back of Curb or obstruction. CES requires that any pad-mounted transformer be installed with at clearance of at least 3 feet from the edge of the transformer pad to the back of curb or other obstruction. 12.3. Metering Equipment. 12.3.1. For safety reasons, metering equipment shall be located so that CES and other electrical personnel are provided level, unobstructed working space. 12.3.2. The width of the working space in front of all metering equipment shall be the width of the equipment or 36” whichever is greater. 12.3.3. In all cases, the workspace shall permit at least a 90 – degree opening of equipment doors or hinged panels. 12.3.4. Where meter sockets or meter equipment cabinets are installed beside, above, or below other equipment, A minimum space of four inches must be maintained between meter sockets and any adjacent equipment. This space must be increased where needed to allow any cabinet or equipment door to open 90 degrees without interfering or contacting metering sockets or metering equipment cabinets. Contact CES for approval prior to installing any meter sockets with spacing less than 4” between the meter socket and adjacent equipment. 12.3.5. The depth of the working space in the direction of live parts shall not be less than 3’ for equipment operating at less than 250V to ground, and 3’6” for equipment operating at greater than 250V to ground. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 24 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 12.3.6. The height of this dedicated electrical space extends from ground/floor level to a height 6’6” above the metering equipment. 12.3.7. No piping, ducts, or equipment foreign to the electrical installation, such as gas meters, water meters, phone/CATV attachments, etc., shall be located above or below the metering equipment. (This does not prohibit grounding and bonding connections for Phone/CATV). 12.3.8. A clearance of at least six feet shall be provided from machinery or devices having moving parts that are not protected by guards, barriers, or other means to prevent physical contact. 12.3.9. CES strongly discourages the presence of vines, ivy, or any other creeping or climbing vegetation in the working space. Such vegetation can damage the metering equipment and service equipment, pose a safety hazard for CES personnel, and can create a fire hazard. CES reserves the right to trim, cut, or remove any landscaping interfering with the required workspace without notice. 12.4. Trees and Vegetation 12.4.1. Vegetation Planted Near Pad-Mounted Equipment, including Transformers, Switches and Termination Cabinets. CES requires that no trees or shrubs be planted within 10 feet of the front of any pad-mounted equipment or within 4 feet of any other side of a pad- mounted transformer. CES may remove such vegetation without notice. Pad mounted equipment can have more than one “front”. Any side with a door, switch handle, or other compartment component that can be opened or operated by CES personnel is considered a “front” of the equipment. 12.4.2. CES does not permit any trees to be planted within the right-of-way, on its easements, or on City utility easements. Any trees found in these areas may be removed without notification to owner. Bushes, shrubs, or grasses may be planted in these areas at the owner’s risk. CES will not repair or replace landscaping in these areas or areas dedicated to utility use. 12.4.3. In areas outside of right-of-way and easements, CES recommends that only low-growth and slow-growth trees be located within 15 feet of an overhead line or within 7.5 feet of an underground line. In no case should trees be planted directly under an overhead power line or directly over an underground power line. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 25 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 12.5. Special Circumstances and Other Codes. 12.5.1. Certain circumstances, such as proximity to swimming pools, railroads, interstates, navigable waterways, Interstate Highways, State Highways, and other conditions may require additional clearances around CES lines and equipment beyond those stated in this document. 12.5.2. Required clearances to CES lines and equipment may be subject to NEC, NESC, or other relevant codes or standards. Clearances may also be adjusted due to Electrical Transmission line clearance requirements, railroad or GDOT permit requirements or other similar restrictions. 13. Customer Utilization Equipment. 13.1. Requirement to Balance Load 13.1.1. The customer must balance the load connected across each phase of the service or service bus as nearly as practical. 13.2. Requirements for Motors. 13.2.1. All installed motors should have devices to protect the motor and motor circuit from overload and short circuit. In addition, three phase motors should be protected from single-phase operation. Installation of motor protective devices is the responsibility of the customer. 13.2.2. Single-phase, 115 V motors having a locked-rotor current less than 40 amps, and single- phase 230 V motors having a locked-rotor current less than 100 amps, may normally be started at line voltage. 13.2.3. Single-phase motors having locked-rotor currents exceeding these limits may require special service consideration, and CES engineering must be consulted before purchasing or connecting such motors. 13.2.4. Because allowable locked-rotor currents vary at different locations, a CES engineer shall be consulted before connecting poly-phase motors to CES distribution system. 13.2.5. CES reserves the right to disallow motors to be started without the application of reduced voltage motor starters. A 25 hp motor or smaller can normally be started without aid of a starter unless problems exist. The starting characteristics of motors larger than 25 hp will be verified by CES engineer to determine if reduced voltage motor starters are needed. 13.3. Requirements for X-Ray, Welders, Power Electronic and similar equipment. 13.3.1. The customer should consult with CES prior to purchasing or installing any utilization equipment that has the potential to cause voltage fluctuation, waveform distortion, or other system disturbances. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 26 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 13.3.2. The customer may be required to install corrective devices or apparatus, limit operation of this equipment, or take other steps to prevent disturbances caused by this equipment from affecting service to other customers. 13.4. Current and Voltage Harmonic Distortion Limits. 13.4.1. Certain non-linear loads can cause harmonic distortion. Current and voltage distortion should be limited to the values specified in IEEE519-2014 (or current version). 13.4.2. Total Demand Distortions (TDD) should be typically limited to 5% - 20% of the total maximum metered annual demand. The exact limit will depend on the available short circuit current at the customer’s location. Contact CES to obtain the TDD limit for a specific location. 13.4.3. Voltage Total Harmonic Distortion (THD) should be limited to 8% for delivery voltages less than 1000V and 5% for delivery voltages between 1000V and 69kV. 13.4.4. Individual component harmonic levels for both voltage and current are required to be less than the stated total limits above. 13.4.5. The customer is responsible for providing and installing any required devices or apparatus, or taking any other necessary action to limit harmonics to acceptable levels. 13.5. Protection for Customer Equipment. 13.5.1. The customer shall provide and maintain suitable protective devices to prevent any loss, damage, or injury that might result from single phasing conditions or other fluctuations or irregularity in the supply of energy. 13.5.2. To prevent equipment failure and data loss, computers, programmable controllers, and other sensitive devices should be protected against abnormal system conditions by using commercially available AC line conditioners, surge suppressors, or uninterruptible power supplies. 13.6. Emergency or Stand-by Generators. 13.6.1. All Emergency or Stand-by Generators, Transfer switches, and other associated equipment must be installed per the requirements of the National Electric Code (NEC), and shall have adequate interlocks or other means to prevent backfeed into CES distribution system. 13.6.2. CES may inspect generator installations or require documentation to verify that adequate measures are in place to prevent backfeed into CES distribution system. 13.6.3. CES reserves the right to disconnect service without notice or refuse to restore service to any location that poses a safety hazard to CES personnel, the public, or other customers. 13.7. Portable Generators. 13.7.1. Portable Generators must be isolated from the CES distribution system. Failure to properly isolate portable generators creates a hazardous condition for CES personnel. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 27 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 13.7.2. Damage to the Portable Generator and/or fire can result if the portable generator is not properly isolated when power is restored. 13.7.3. Portable Generators must be connected to the load in accordance with all applicable codes and the manufacturer’s recommendations. 13.7.4. CES reserves the right to disconnect service without notice or refuse to restore service to any location that poses a safety hazard to CES personnel, the public, or other customers. 14. Service Interruptions and Outage Restoration. 14.1. General. 14.1.1. CES will at all times strive to provide continuous, reliable service as is reasonably practicable; however, CES does not guarantee that electric service will be free from temporary disruptions and outages. 14.1.2. Temporary disruptions of service shall not constitute breach of CES service obligations, and CES shall not be liable for damages resulting from such temporary interruptions. 14.2. Outage Restoration. 14.2.1. In the event of an outage, CES will restore service as soon as it can reasonably and safely do so. 14.2.2. In the event a disruption is caused by conditions on the customer's premises, CES reserves the right to disconnect the customer until unsatisfactory conditions are corrected. 15. Work around CES lines and equipment. 15.1. Georgia Utility Facility Protection Act and High-voltage Safety Act. 15.1.1. The State of Georgia has passed the High-voltage Safety Act (46-3-30 G) and the Georgia Utility Facility Protection Act (GUFA) (25-9-1). These laws have been passed to safeguard life and property. Full text of these laws can be found at www.Georgia811.com. In general, they limit how close an individual can get to an electrical line that is energized over 750 Volts as well as define requirements when digging into the earth while in Georgia. Please download these laws at the above website for your information and safety. 15.1.2. The Georgia Utility Facility Protection Act (GUFPA) was established to protect the underground utility infrastructure of Georgia. Your familiarity with and adherence to this law is extremely important in assuring the safety of our underground facilities and the general public. GUFPA mandates that, before starting any mechanized digging or excavation work, you must contact Georgia 811 at least 48 hours but no more than 10 working days in advance to have utility lines marked. This law covers activities such as excavation, tunneling, grading, boring, demolition or any similar work. Georgia 811 accepts calls Monday thru Friday, excluding holidays, for normal locate requests. Damage and Emergency locate request may be called in 24 hours a day, seven days a week. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 28 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. 15.1.3. The Georgia Public Service Commission also requires, by law, that anyone doing work in the vicinity of overhead high voltage lines must notify Georgia 811 at least 72 hours in advance, excluding weekends and holidays, so that appropriate arrangements for the completion of required safety precautions. 15.2. Overhead Lines. 15.2.1. For work around CES lines and equipment, CES may install insulating covers or other protective means in accordance with the Georgia High-voltage Safety Act and CES policy. In many cases insulating covers or protective means can be implemented at no cost to the Customer. However, CES does reserve the right to charge fees for required labor, equipment, and materials to provide insulating covers or other protective means. In ALL cases, the Customer will be responsible for and damage caused to CES insulating covers or other CES equipment installed as a protective means for work near CES lines or equipment. 15.3. Easements. 15.3.1. See Section 11 for typical easements around CES lines and Equipment. Work within CES easements and construction or installation of any facilities within CES easements may require specific permitting and approval from CES. ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 29 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. Index CES Access to Equipment, 19 Lines and Other Equipment, 19 Meters, 19 Conduit, 12 attached to CES poles, 13 hardware for straps, 13 metering, 12 straps, 13 underground service lateral, 12 Current Distortion. See Total Demand Distortion Distortion Harmonic, 22 Voltage, 22 Distributed Generation, 13 Easements typical, 19 work within, 24 Fees connection, 9 Generators Emergency, 23 Portable, 23 Stand-by, 23 Georgia Utility Facility Protection Act, 24 Grounding, 8 Hardware, 13 High-voltage Safety Act, 24 Interference with City Property, 19 Load requirement to balance, 21 Meter sockets surface mount, 15 Meter Sockets labeling, 15 mounting, 15 Meter Tampering. See Tampering Metering General Requirements, 14 ringless socket, 14 Motors, 21 25hp or less, 22 greater than 25hp, 22 Protection, 22 single-phase, 22 Power Electronic Equipment, 22 Protection for Customer Equipment, 22 Required Clearance, 19 Overhead Lines and Equipment, 19 Pad Mounted Transformers, Switches, and Termination Cabinets, 20 Schedule, 6 Service Additions to, 7 Application for Electric, 6 attachment hardware (overhead), 10 Class of, 7 conduit (overhead), 10 conduit (underground), 11 Connections to, 7 Information, 8 mast, 10 min/max size, 8 overhead, 9 overhead temporary, 9 Policies, 8 Request for, 6 Requirement to Energize, 5 underground, 10 underground temporary, 9 Use of, 7 Site Development Plans. See Site Plans Site Plans, 5 Solar photovoltaic. See Distributed Generation Solar Photovoltaic, 5, See Distributed Generation Solar PV. See Solar Photovoltaic Straps, 12 Tampering, 19 Total Demand Distortions (TDD), 22 transformers pad-mounted, 11 Voltage Total Harmonic Distortion (THD), 22 Welders, 22 X-Ray, 22 ---PAGE BREAK--- CES Contractor’s Manual Revision Date: May 1, 2025 PAGE 30 DISCLAIMER: The information contained in this manual may be changed at anytime. It is the responsibility of the user of this manual to ensure that it has not been updated by the CES Engineering Department. Please call the CES Engineering Department @ [PHONE REDACTED] for the current version of this manual. APPENDIX DRAWING # DESCRIPTION CES3001 COMMERCIAL TROUGH CES3002 3 PHASE, 200 AMP SELF CONTAINED OVERHEAD METER SOCKET CES3004 1 OF 3 TYPICAL RESIDENTIAL OVERHEAD SERVICE CES3004 2 OF 3 TYPICAL RESIDENTIAL OVERHEAD SERVICE CES3004 3 OF 3 ALTERNATE TWO STORY RESIDENTIAL OVERHEAD SERVICE – REQUIRES CES APPROVAL CES3006 3 PHASE COMMERCIAL, TRANSFORMER RATED SERVICE CES3007 TYPICAL RESIDENTIAL UNDERGROUND SERVICE CES3008 TEMPORARY UNDERGROUND SERVICE CES3009 TEMPORARY OVERHEAD SERVICE CES3010 POWER LEG, 4-WIRE DELTA METER SOCKET CES3011 REQUEST FOR SERVICE CES3012 45 TO 1000 KVA PAD SPECIFICATION CES3013 1000 TO 2500 KVA PAD SPECIFICATION CES3014 1 PHASE, 2WIRE, 120VAC METER SOCKET CES3015 1PHASE, 3WIRE, 240VAC METER SOCKET CES3016 METER PEDESTAL SERVICE INSTALLATION (NON-TRANSFORMER RATED) CES3017 CUSTOMER OWNED CONDUITS ATTACHED TO CES POLE CES3018 MULTIPLE METERING SPECIFICATION– OVERHEAD CES3019 MULTIPLE METERING SPECIFICATION - UNDERGROUND CES3020 TYPICAL SELF-CONTAINED, MULTI-METER SERVICE AND TROUGH GROUNDING SCHEMATIC FOR TWO TO SIX METERS