DEMOLITION REQUIREMENTS Original/Notarized letter from the property owner giving authorization to demo structure if a contractor is applying for a permit. Homeowner acting as contractor will need a copy of the recorded warranty deed and photo ID. The person taking out the permit must be on the warranty deed. If Disturbed area is over an acre, water is within 200ft or if flood plain is on property Storm Water approval is required, homeowner will most likely need to hire a licensed contractor. Photos of three sides of structure are required for Zoning approval Asbestos testing and removal is the contractors responsibility P.O. BOX 1390 CARTERSILLE, GA. 30120 (770) 387-5600 WWW.CITYOFCARTERSVILLE.ORG ---PAGE BREAK--- Demolition Permit Application PERMIT DATE: Property Owner: Phone Property Address: City: State: Zip: Subdivision: Lot#: Description of what is being removed: Contractor/Company: ☐Sewer or ☐ Septic Address: City: State Phone: Attach photos of three sides of structure Notify the Environmental Protection Division by mail 10 business days before the demolition is to begin. Notification is required even if there is no asbestos present in the building. If asbestos is present in the building, it should be addressed before the demolition. If asbestos is present and the demolition continues, the owner of the building and the demolition contractor carry equal responsibility if asbestos is disturbed. The following E.P.D. Offices can provide information: Atlanta (404) 363-7026 Brunswick (912) 264-7284 Savannah (912) 353-3225 Notification forms provided by the E.P.D. website at All building material and debris must be properly disposed of and is not allowed to be buried on site. I hereby certify that I have read and examined this application and know the same to be true and correct. Signature of Applicant: Printed Name: Building Dept. Zoning P.O. BOX 1390 CARTERSILLE, GA. 30120 (770) 387-5600 WWW.CITYOFCARTERSVILLE.ORG