Full Text
CITY OF CARTERSVILLE 2023 VISIONING SESSIONPUBLIC ---PAGE BREAK--- 2022MEASURED WORK Yard Waste Collected - 1,856 Tons Recycling - 255 Tons Res. Garbage Collected – 7,814 Tons Com. Garbage Collected - 8,524 Tons Storm Pipe Cleaned/Jetted – 2,108 LF Storm Pipe Installed - 486 LF Camera Pipe Inspection – 14,941 LF Ditches Cleaned/Dipped – 4,373 LF Street Sweeping – 7,419 Lane Miles Catch Basins Cleaned – 3,287 Each ---PAGE BREAK--- 2022MEASURED WORK Pot Holes Filled - 307 Each Asphalt Installed - 134 Tons Utility Cuts Repaired - 180 Each Sidewalk Repaired/Poured – 9,319 SF Tractor Mowing - 653 Shoulder Miles Trees Removed/Trimmed - 41 Each