← Back to Campbell, CA

Document Campbellca_doc_c7b78365e4

Full Text

CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Revised 3/08 ENGINEER'S ESTIMATE FOR LAND DEVELOPMENT PROJECTS Date: For File No(s): Site Address: ENC. No. ITEM UNIT PRICES FOR PROJECT AMOUNT NO. DESCRIPTION QTY UNIT < $250 K > $250 K $ AMOUNT I. DEMOLITION/CLEARING 1. CLEARING & GRUBBING LS $2,000.00 $1,500.00 2. SAWCUT P.C.C./A.C.(UP TO LF $6.10 $4.10 3. P.C.C. REMOVAL SF $4.00 $3.00 4. CURB AND GUTTER REMOVAL LF $7.05 $3.45 5. MEDIAN REMOVAL SF $5.25 $2.65 6. DEMOLISH EXISTING INLET/PLUG RCP'S EA $1,800.00 $1,200.00 II. STORM DRAINAGE 1. 12" R.C.P. (CLASS V) LF $210.00 $180.00 2. 15" R.C.P. (CLASS III) LF $225.00 $195.00 3. 18" R.C.P. (CLASS III) LF $240.00 $210.00 4. 24" R.C.P. (CLASS III) LF $260.00 $240.00 5. 30" R.C.P. (CLASS III) LF $280.00 $260.00 6. T.V. INSPECTION (12") LF $1.25 $0.80 7. STD. DRAINAGE INLET (C.C. DETAIL 5) EA $2,800.00 $2,300.00 8. FLAT GRATE INLET (C.C. DETAIL 6) EA $1,620.00 $1,275.00 9. STD MANHOLE (C.S.J. DETAIL D-11) EA $5,000.00 $4,000.00 10. STD MANHOLE (C.S.J. DETAIL D-12) EA $6,500.00 $6,000.00 11. BREAK AND ENTER M.H./D.I. EA $1,000.00 $835.00 III. CONCRETE IMPROVEMENTS 1. SIDEWALK SF $12.00 $8.00 2. DRIVEWAY APPROACH SF $14.00 $10.00 3. CURB AND GUTTER LF $45.00 $35.00 4. VALLEY GUTTER SF $20.00 $15.00 5. CURB RAMP EA $1,800.00 $1,500.00 6. TYPE B-1 CURB LF $34.00 $29.00 7. TYPE A1-B3 CURB LF $20.00 $17.00 8. COBBLESTONE MEDIAN SURFACE SF $20.00 $15.00 9. P.C.C. DRIVEWAY CONFORM SF $8.20 $6.30 10. A.C. DRIVEWAY CONFORM SF $5.25 $4.40 J:\FORMS\Templates\Land Development\Street Improvements\EngEst (Rev. 03/08) Page 1 of 4 ---PAGE BREAK--- CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Revised 3/08 ENGINEER'S ESTIMATE FOR LAND DEVELOPMENT PROJECTS Date: For File No(s): Site Address: ENC. No. ITEM UNIT PRICES FOR PROJECT AMOUNT NO. DESCRIPTION QTY UNIT < $250 K > $250 K $ AMOUNT IV. PAVEMENT 1. ASPHALT DIGOUT AND REPLACE CF $5.80 $4.10 2. PAVEMENT WEDGE CUT LF $5.00 $2.65 3. PAVEMENT GRINDING SF $0.95 $0.63 4. PAVEMENT FABRIC (PETROTECH) SY $2.30 $2.10 5. ASPHALT CONCRETE (TYPE A) T $210.00 $150.00 6. AGGREGATE BASE (CLASS 2) T $80.00 $40.00 7. SLURRY SEAL (TYPE II) SF $0.25 $0.20 8 AC REMOVAL/OFFHAUL/DISPOSAL CF $14.00 $12.00 V. TRAFFIC SIGNALS/LIGHTS 1. DETECTOR LOOP ROUND) EA $520.00 $347.00 2. DETECTOR LOOP x 30') EA $752.50 $626.25 3. DETECTOR LOOP x 50') EA $1,042.00 $868.30 4. ELECTROLIER EA $4,000.00 $3,500.00 5. 1 1/2" RIGID CONDUIT LF $10.40 $8.20 6. 2" RIGID TRAFFIC SIGNAL CONDUIT LF $19.70 $15.05 7. CONDUCTOR LF $0.85 $0.65 8. PULL BOX (NO. 3 1/2) EA $347.00 $278.00 9. TRAFFIC SIGNAL PULL BOX (NO. 5) EA $463.00 $405.25 10. PULL ROPE LF $0.57 $0.57 VI. STRIPING AND SIGNS 1. REMOVE PVMT. MARKINGS (PAINT) SF $2.65 $1.60 2. REMOVE PVMT. MARKINGS (THERMO) SF $3.70 $3.40 3. REMOVE PVMT STRIPING LF $1.50 $1.00 4. STRIPING DETAIL 9 LF $3.00 $2.00 5. STRIPING DETAIL 22 LF $3.00 $2.00 6. STRIPING DETAIL 29 LF $4.00 $3.00 7. STRIPING DETAIL 32 LF $4.00 $3.00 8. STRIPING DETAIL 37 (THERMO) SF $5.00 $3.50 9. STRIPING DETAIL 38 (THERMO) SF $5.00 $3.50 J:\FORMS\Templates\Land Development\Street Improvements\EngEst (Rev. 03/08) Page 2 of 4 ---PAGE BREAK--- CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Revised 3/08 ENGINEER'S ESTIMATE FOR LAND DEVELOPMENT PROJECTS Date: For File No(s): Site Address: ENC. No. ITEM UNIT PRICES FOR PROJECT AMOUNT NO. DESCRIPTION QTY UNIT < $250 K > $250 K $ AMOUNT 10. STRIPING DETAIL 39 LF $5.00 $3.00 11. LIMIT LINE LF $6.00 $4.50 12. CROSSWALK, 12" WHITE LF $6.00 $4.50 13. PAVEMENT MARKINGS (PAINT) SF $3.25 $2.50 14. PAVEMENT MARKINGS (THERMO) SF $6.60 $5.05 15. PAVEMENT MARKER (NON-REFL.) EA $5.20 $3.50 16. PAVEMENT MARKER (REFLECTIVE) EA $6.95 $4.75 17. TYPE K MARKER EA $109.50 $92.50 18. TYPE N MARKER EA $109.50 $92.50 19. SALVAGE ROAD SIGN EA $99.00 $87.35 20. RELOCATE ROAD SIGN (W81 ON NEW POST) EA $115.75 $99.00 21. INST. RD. SIGN ON EXIST. POLE EA $231.55 $168.50 22. ROAD SIGN WITH POST EA $347.30 $277.85 23. INSTALL 1226S SIGN WITH POST EA $350.00 $252.60 24. STANDARD BARRICADE LF $19.50 $15.75 VII. LANDSCAPING 1. IRRIGATION, PLANTING WORK SF $8.00 $7.35 2. PRUNE TREE ROOTS EA $147.35 $115.75 3. TREE REMOVAL EA $684.10 $526.25 4. ROOT BARRIER (12") LF $21.05 $10.50 5. ROOT BARRIER (18") LF $26.30 $15.80 6. STREET TREE EA $447.30 $342.05 7. STREET TREE (36" BOX) EA $710.40 $589.40 8. TOP SOIL BACKFILL CY $26.30 $22.60 9. IRRIGATION LS $1,368.25 $710.40 VIII. MISCELLANEOUS 1. PEDESTRIAN BARRIER LF $86.85 $69.45 2. CHAIN LINK FENCE LF $17.35 $13.70 J:\FORMS\Templates\Land Development\Street Improvements\EngEst (Rev. 03/08) Page 3 of 4 ---PAGE BREAK--- CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Revised 3/08 ENGINEER'S ESTIMATE FOR LAND DEVELOPMENT PROJECTS Date: For File No(s): Site Address: ENC. No. ITEM UNIT PRICES FOR PROJECT AMOUNT NO. DESCRIPTION QTY UNIT < $250 K > $250 K $ AMOUNT 3. RAISE MISC. BOX TO GRADE EA $315.75 $210.50 4. RAISE MANHOLE TO GRADE EA $421.00 $364.45 5. INSTALL MONUMENT BOX EA $1,500.00 $900.00 6. MEDIAN BACKFILL CY $22.10 $19.70 SUBTOTAL PREPARED BY: 10% MOBILIZATION, CONSTRUCTION TRAFFIC CONTROL/PHASING, REVIEWED BY: CONSTRUCTION STAKING, CONSTRUCTION TESTING APPROVED BY: 10% CONTINGENCY 10% SECURITY ENFORCEMENT TOTAL FAITHFUL PERFORMANCE SECURITY USE THIS AMOUNT FOR SECURITY J:\FORMS\Templates\Land Development\Street Improvements\EngEst (Rev. 03/08) Page 4 of 4