Full Text
Building Department (208) 878-2256 2020 Park Avenue Burley, ID 83318 Building Inspector Plumbing Inspector Electrical Inspector HVAC Inspector Gary Mark Floyd Gary (208) 431-5425 (208) 650-1258 (208) 650-1098 (208) 431-5425 Please fill out this application completely and submit with payment. If you have questions or need assistance completing the application please call the Building Department. Please note: permit fees are non-refundable and non-transferable. Applicant Information Property Address of Construction Owner: Address: City State: Zip Code: Email: Contractor Information Name: License # : Address: City: State: Zip Code: Email: Phone Type of Work : New Addition Alteration Repair Roof Move Remove Describe Work: Valuation of Work: $ Building Permit Fee: $ DATE: SIGNATURE: PRINTED NAME: Amount you are enclosing: Please bill my credit card: $ Visa Discover Card MasterCard Card # : Exp. Date: 3 Digit Sec. Code: Your security code is located on the back of your credit card, next to the signature box. SIGN ---PAGE BREAK--- PLUMBING PERMIT WORKSHEET (FEE SCHEDULE) This worksheet must accompany the Contractor/Homeowner Application. Use this worksheet to calculate the fees and transfer the grand total to the application. RESIDENTIAL Total $ • New: Single Family Dwelling, including all buildings with plumbing being constructed on each property. * Based on living space (see definition below) □ Up to 1,500 sq.ft. $130 □ 1,501 to 2,500 sq.ft. $195 Total Square Footage □ 2,501 to 3,500 sq.ft. $260 □ 3,501 to 4,500 sq.ft. $325 □ Over 4,500 sq.ft. $325 plus $65 for each additional 1,000 sq.ft. or portion thereof $325 + ( $65 х # of additional 1,000 sq.ft. or portion thereof ) $ • New: Multi-Family Dwelling □ Duplex Apartment $260 □ Three or more multi-family units: $130 per building plus $65 per unit (Contractors Only) ( $130 х # of buildings ) + ( $65 х # of units ) $ Existing Residence Detached Shop: $65 fee plus $10 per additional fixture, up to the maximum of the corresponding sq.ft. of the building (one fixture is included in the $65.00) $65 + ( $10 х # of additional fixtures ) $ • Sewer & Water: □ $38 Sewer Line □ $38 Water Line □ $65 Sewer & Water – if inspected at the same time □ $65 Sewer turnaround / Domestic water (change from septic to city, water re-pipe under house) $ Lawn Sprinklers: $65 $ Modular, Manufactured or Mobile Homes: $65 for sewer and water stub connections $ Fire Sprinkler: $65 fee or $4 per sprinkler head, whichever is greater $ Requested Inspection Water Heater Replacement Gas Line : $65 $ Water Conditioning Equipment: $65.00 $ Hydronic Heating: $65 + ( $10 х # of zones ) $ Plan Check : $65 per hour $ COMMERCIAL/INDUSTRIAL • The fees listed under this inspection type shall apply to any and all plumbing installations not specifically mentioned elsewhere on this form. This shall include all labor, materials, equipment, overhead and profit, as well as all labor, materials, and equipment supplied by others. The project value cannot be reduced by labor, material or equipment that is donated or supplied by others. At the time of “Final” inspection, the Scope of Work, valuation, and permit fees will be verified. Total cost of plumbing system (Job Value Amount): $ $ □ Up to $10,000: ( total cost of system x 0.02 ) + 60 = $ □ Between $10,001 - $100,000: ( (total cost of system – 10,000) x 0.01 ) + $260 = $ □ Over $100,001: ( (total cost of system – 100,000) x 0.005 ) + $1,160 = $ GRAND TOTAL: $ Please transfer this fee to your application * Living Space – space within a dwelling unit intended for human habitation which may reasonably be utilized for sleeping, eating, cooking, bathing, washing, recreation, and sanitation purposes. An unfinished basement is considered part of the living space. Page 2 Revised 11/6/2014