← Back to Broomfield

Document Broomfield_doc_9768df3412

Full Text

WETLANDS BRIDGE 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 GRAVEL PARKING LOT AND TRAILHEAD Forty space gravel parking lot with potential for future 40 space expansion. In- cludes bus drop-off, san-o-let enclosure and landscaping $97,492 IRRIGATION REUSE LINE Irrigation tap/meter at reuse line, irrigation mainline to farmstead entry, and drip irrigation at farmhouse planting $45,188 TRAIL - TRAILHEAD TO BIG DRY CREEK Crusher fines trail from trailhead at parking lot to Big Dry Creek. Includes bridge at Big Dry Creek and wetland work at Lowell Blvd. and along Big Dry Creek Trail; wet- land permitting $185,206 TRAIL - LOWELL BOULEVARD TO LOWER POND (SOUTHSIDE) Connection to Lowell Blvd. by underpass and trail along south side of ponds $27,242 SITE AMENITIES Benches and trash receptacles $5,843 FARMSTEAD CORE First level building stabilization on all structures except pumphouse. Includes deco- rative fencing and pedestrian and maintenance gates $143,315 SITE SIGNAGE Entry, regulatory, and some interpretive signage $5,194 INTERPRETIVE SIGNAGE AT FARMSTEAD Signs at farmstead (plaques on structures) for self-guided tours $3,246 DRYLAND FARMING AT NORTH PASTURE The north pasture may remain as grassland or could be converted to dryland farm- ing with some grazing on the eastern portion of the site No cost TRAIL TO CROFTON PARK Crusher fines trail on the existing historic farm access road to the windmill $2,118 TRAIL AND OVERLOOK AT CAULKINS DITCH Crusher fines trail from farmstead to Caulkins Ditch Overlook. Includes structure at overlook, benches, and trash receptacles $67,878 TRAIL TO FEDERAL BOULEVARD UNDERPASS Crusher fines trail from Big Dry Creek to existing Federal Blvd underpass $2,370 FISHING DOCK AND OVERLOOK Fishing dock/small overlook structure at lower pond. Includes trash receptacles $40,124 NORTH PASTURE FENCING Includes interior site fencing at the north pasture and livestock gate $30,155 PICNIC AREA Small picnic structure, picnic tables, benches, and trash receptacles $26,100 PERIMETER FENCING AT FARMSTEAD $42,851 NORTH LOOP TRAIL Trail along the perimeter of the site $55,348 PUBLIC ART IF JOINT FUNDING CAN BE OBTAINED IN THE FUTURE ESTIMATED COST (AUGUST 2009) - $779,670 NORTH 0 25 50 100 TRAILHEAD/PARKING 40 FUTURE SPACES 40 SPACES WINDBREAK FARMSTEAD FARMSTEAD EXISTING UNDER- PASS PROPOSED PEDESTRIAN UNDERPASS* WINDMILL EXISTING CROSSWALK TO BRANDYWINE NEIGHBORHOOD LOWER POND FISHING OPPORTUNITIES AT SHORE UPPER POND WETLANDS 120th AVENUE 124th AVENUE W. 121st PL. LOWELL BOULEVARD FE DE RA L B OUL EVA RD SOUTHEAST COMMUNITY LOOP SEGMENT 8’ GRAVEL TRAIL CONNECTION TO CROFTON PARK PROPOSED CROSSWALK OPEN SPACE MANAGEMENT W. 122nd AVE. CAULKINS DITCH EX IS TI NG BIG DRY CREEK TRAIL EX IS TI NG BIG DRY CREEK TRAIL B I G DRY CR E E K * TRAIL 3-4’ WIDE SPILLWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 B I G DRY CR E E K PROPOSED DETACHED SIDEWALK (COMPLETED AS PART OF LOWELL BLVD. IMPROVEMENTS)* PROPOSED DETACHED SIDEWALK (COMPLETED AS PART OF W. 120TH AVE. IMPROVEMENTS)* * DENOTES IMPROVEMENTS TO BE COMPLETED IN THE FUTURE WITH SEPARATE FUNDING B R O O M F I E L D W E S T M I N S T E R O P E N S PA C E F O U N D A T I O N • 29 W I N T E R 2 0 1 0 FIGURE 4: MASTER PLAN