Full Text
i Transportation Master Plan CONTENTS Page EXECUTIVE SUMMARY 1.0 INTRODUCTION 1.1 Project Purpose and 1.2 Planning Principle and Policies 1.3 Study 2.0 EXISTING 2.1 Current Land 2.2 Existing Roadway 2.3 Transit 3.0 FUTURE TRANSPORTATION PLANS AND FACILITIES 3.1 US 85 Access Control 3.2 Adams County Transportation Plan 3.3 E-470 3.4 Metro Vision 3.5 Statewide Transportation Improvement Program 3.6 Bromley Lane Signal 4.0 2020 MAJOR THOROUGHFARE 4.1 Study 4.2 Transportation Modeling 4.3 2020 “Base Case” 4.4 Recommended Major Thoroughfare Plan 4.5 Analysis of Proposed Transportation 4.5.1 Capacity and Level of 4.5.2 Air 4.5.3 Traffic 4.6 Functional Street Classifications 4.7 Downtown Parking and Circulation ---PAGE BREAK--- ii Transportation Master Plan 5.0 IMPLEMENTATION PLAN 5.1 Cost of Needed Improvements 5.2 Funding 5.3 Near-Term Priority Projects 5.4 Transportation Plan Monitoring and Updating 6.0 BICYCLE AND PEDESTRIAN 6.1 Public Input: Trails 6.2 Existing 6.3 Future Trails 6.4 Trail 6.5 Integration of Pedestrian/Bicycle 7.0 PUBLIC TRANSPORTATION 7.1 North Metro Transportation Study 7.2 North Front Range Transportation Alternatives Feasibility 7.3 Bus Pullout Appendices 1. Model Land Use Assumptions 2. City Adopted Roadway Cross-sections 3. Project Concept-Level Cost Estimates List of Figures 2-1 Existing Level of Service 4-1 Study Area and Traffic Analysis Zones 4-2 Base Case Transportation Plan 4-3 2020 Roadway Operations Forecasted with “Base Case” Transportation Plan 4-4 Proposed Major Thoroughfare Plan 4-5 Changes to “Base Case” with Proposed Major Thoroughfare Plan 4-6 2020 Roadway Operations Forecasted with Proposed Major Thoroughfare Plan 5-1 Near-Term Projects List of Tables 5-1 Near-Term Priority Projects 5-2 Fiscally Constrained Plan