Full Text
APPENDIX H Construction Cost Estimates for Priority Projects ---PAGE BREAK--- Lower Upper Lower Upper Lower Upper Lower Upper Lower Upper Lower Upper 1 Riverfront Trail 1.8 9504.0 10 95040 $2.50 $3.00 $237,600 $285,120 $0 $0 $22,810 $28,512 $260,410 $313,632 $260,000 $315,000 2 Blue Creek Trail 3.0 15840.0 10 158400 $2.50 $3.00 $396,000 $475,200 $55,000 $78,000 $38,016 $47,520 $489,016 $600,720 $490,000 $600,000 3 Downtown Railroad Trail 5.4 28512.0 10 285120 $2.50 $3.00 $712,800 $855,360 $2,000,000 $2,400,000 $68,429 $85,536 $2,781,229 $3,340,896 $2,780,000 $3,340,000 4 Alkali Creek Trail 2.4 12672.0 10 126720 $2.50 $3.00 $316,800 $380,160 $1,515,000 $1,818,000 $30,413 $38,016 $1,862,213 $2,236,176 $1,860,000 $2,235,000 5 BBWA Northwest Trail 4.0 21120.0 10 211200 $2.50 $3.00 $528,000 $633,600 $80,000 $120,000 $50,688 $63,360 $658,688 $816,960 $660,000 $815,000 6 BBWA Westend Trail 3.4 17952.0 10 179520 $2.50 $3.00 $448,800 $538,560 $50,000 $80,000 $43,085 $53,856 $541,885 $672,416 $540,000 $670,000 7 BBWA Heights Trail 3.8 20064.0 10 200640 $2.50 $3.00 $501,600 $601,920 $40,000 $60,000 $48,154 $60,192 $589,754 $722,112 $590,000 $720,000 8 Zimmerman Trail 1.0 5280.0 10 52800 $8.00 $12.00 $422,400 $633,600 $0 $0 $12,672 $15,840 $435,072 $649,440 $435,000 $650,000 9 Big Ditch Trail 2.9 15312.0 10 153120 $2.50 $3.00 $382,800 $459,360 $0 $0 $36,749 $45,936 $419,549 $505,296 $420,000 $505,000 10 Bridal Moon Trail 1.5 7920.0 10 79200 $3.00 $5.00 $237,600 $396,000 $40,000 $60,000 $19,008 $23,760 $296,608 $479,760 $300,000 $480,000 Lower Upper Lower Upper Lower Upper Lower Upper 1 Riverfront Trail 0 $0 $0 0 $0 $0 0 $0 $0 $0 $0 2 Blue Creek Trail 0 $0 $0 1 $40,000 $60,000 1 $15,000 $18,000 $55,000 $78,000 3 Downtown Railroad Trail 4 $2,000,000 $2,400,000 0 $0 $0 0 $0 $0 $2,000,000 $2,400,000 4 Alkali Creek Trail 1 $1,500,000 $1,800,000 0 $0 $0 1 $15,000 $18,000 $1,515,000 $1,818,000 5 BBWA Northwest Trail 0 $0 $0 2 $80,000 $120,000 0 $0 $0 $80,000 $120,000 6 BBWA Westend Trail 0 $0 $0 2 $50,000 $80,000 0 $0 $0 $50,000 $80,000 7 BBWA Heights Trail 0 $0 $0 1 $40,000 $60,000 0 $0 $0 $40,000 $60,000 8 Zimmerman Trail 0 $0 $0 0 $0 $0 0 $0 $0 $0 $0 9 Big Ditch Trail 0 $0 $0 0 $0 $0 0 $0 $0 $0 $0 10 Bridal Moon Trail 0 $0 $0 1 $40,000 $60,000 0 $0 $0 $40,000 $60,000 Lower Upper Lower Upper 1 Riverfront Trail 1.8 9504.0 10 95040 $0.24 $0.30 $22,810 $28,512 2 Blue Creek Trail 3.0 15840.0 10 158400 $0.24 $0.30 $38,016 $47,520 3 Downtown Railroad Trail 5.4 28512.0 10 285120 $0.24 $0.30 $68,429 $85,536 4 Alkali Creek Trail 2.4 12672.0 10 126720 $0.24 $0.30 $30,413 $38,016 5 BBWA Northwest Trail 4.0 21120.0 10 211200 $0.24 $0.30 $50,688 $63,360 6 BBWA Westend Trail 3.4 17952.0 10 179520 $0.24 $0.30 $43,085 $53,856 7 BBWA Heights Trail 3.8 20064.0 10 200640 $0.24 $0.30 $48,154 $60,192 8 Zimmerman Trail 1.0 5280.0 10 52800 $0.24 $0.30 $12,672 $15,840 9 Big Ditch Trail 2.9 15312.0 10 153120 $0.24 $0.30 $36,749 $45,936 10 Bridal Moon Trail 1.5 7920.0 10 79200 $0.24 $0.30 $19,008 $23,760 Total Trail Cost (rounded) Trail Name # of Grade Sep. Street/RR Crossings Crossings Cost of Grade Sep. Crossings Total Trail Cost Landscaping Cost ($/sq ft) Number Trail Name Length (miles) Trail Name Cost of Grade Sep. Crossings Cost of At-grade Crossings Total Landscaping Cost Length (ft) Width of Landscape Area (ft) Landscape Area (sq ft) Total Landscaping Cost (see below) Trail Construction Cost ($/sq ft) Total Construction Cost ($/sp ft) Trail Width (ft) Area (sq ft) Construction Cost Estimates for Priority Multi-Use Trails (Based on 2003 Construction Costs) Number Landscaping Total Cost of Crossings (see below) Length (miles) Length (ft) # of Ditch/ Creek Crossings # of At-grade Street Crossings Total Cost of Crossings Number