Full Text
BID ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 101 Mobilization LS 1 $ 10,000.00 $ 10,000.00 $ 55,000.00 $ 55,000.00 $ 34,600.00 $ 34,600.00 $ 40,673.00 $ 40,673.00 $ 18,357.75 $ 18,357.75 $ 133,507.30 $ 133,507.30 $ 88,000.00 $ 88,000.00 102 Miscellaneous Work EACH 10,000 $ 1.00 $ 10,000.00 $ 1.00 $ 10,000.00 $ 1.00 $ 10,000.00 $ 1.00 $ 10,000.00 $ 1.00 $ 10,000.00 $ 1.00 $ 10,000.00 $ 1.00 $ 10,000.00 103 Construction Traffic Control DAY 56 $ 250.00 $ 14,000.00 $ 100.00 $ 5,600.00 $ 2,250.00 $ 126,000.00 $ 539.00 $ 30,184.00 $ 627.42 $ 35,135.52 $ 400.00 $ 22,400.00 $ 3,100.00 $ 173,600.00 104 Concrete Sidewalks SQFT 5,264.70 $ 15.00 $ 78,970.50 $ 12.50 $ 65,808.75 $ 10.65 $ 56,069.06 $ 18.40 $ 96,870.48 $ 15.43 $ 81,234.32 $ 11.50 $ 60,544.05 $ 14.00 $ 73,705.80 105 Concrete Driveway SQFT 3,429.10 $ 25.00 $ 85,727.50 $ 15.50 $ 53,151.05 $ 14.50 $ 49,721.95 $ 22.10 $ 75,783.11 $ 20.87 $ 71,565.32 $ 11.50 $ 39,434.65 $ 14.00 $ 48,007.40 106 Combined Concrete Curb and Gutter LNFT 2,388.80 $ 25.00 $ 59,720.00 $ 37.00 $ 88,385.60 $ 31.80 $ 75,963.84 $ 53.90 $ 128,756.32 $ 35.76 $ 85,423.49 $ 35.00 $ 83,608.00 $ 31.00 $ 74,052.80 107 Asphalt Concrete Surface Course – Grade B PG 58-28 TON 253 $ 150.00 $ 37,950.00 $ 195.00 $ 49,335.00 $ 310.50 $ 78,556.50 $ 201.00 $ 50,853.00 $ 360.77 $ 91,274.81 $ 290.00 $ 73,370.00 $ 225.00 $ 56,925.00 108 Crushed Base Course CUYD 262 $ 80.00 $ 20,960.00 $ 90.00 $ 23,580.00 $ 50.60 $ 13,257.20 $ 137.00 $ 35,894.00 $ 108.52 $ 28,432.24 $ 80.00 $ 20,960.00 $ 210.00 $ 55,020.00 109 Storm Drain Inlet EACH 3 $ 11,000.00 $ 33,000.00 $ 6,500.00 $ 19,500.00 $ 7,200.00 $ 21,600.00 $ 6,440.00 $ 19,320.00 $ 12,163.78 $ 36,491.34 $ 8,500.00 $ 25,500.00 $ 6,000.00 $ 18,000.00 111 18-IN Storm Pipe LNFT 156.4 $ 120.00 $ 18,768.00 $ 70.00 $ 10,948.00 $ 115.00 $ 17,986.00 $ 158.80 $ 24,836.32 $ 231.05 $ 36,136.22 $ 135.00 $ 21,114.00 $ 112.00 $ 17,516.80 112 Underground CMP Storage (STA 1+61.86) EACH 1 $ 15,600.00 $ 15,600.00 $ 30,000.00 $ 30,000.00 $ 37,000.00 $ 37,000.00 $ 24,470.00 $ 24,470.00 $ 37,670.53 $ 37,670.53 $ 45,000.00 $ 45,000.00 $ 38,000.00 $ 38,000.00 113 Underground CMP Storage (STA 6+74.72) EACH 1 $ 18,200.00 $ 18,200.00 $ 35,000.00 $ 35,000.00 $ 37,000.00 $ 37,000.00 $ 28,236.00 $ 28,236.00 $ 44,546.73 $ 44,546.73 $ 45,000.00 $ 45,000.00 $ 43,000.00 $ 43,000.00 114 Underground CMP Storage (STA 12+43.23) EACH 1 $ 14,300.00 $ 14,300.00 $ 28,000.00 $ 28,000.00 $ 31,000.00 $ 31,000.00 $ 22,750.00 $ 22,750.00 $ 36,051.82 $ 36,051.82 $ 35,000.00 $ 35,000.00 $ 36,000.00 $ 36,000.00 115 Sign Panel – Sheet Aluminum IV SQFT 37.6 $ 40.00 $ 1,504.00 $ 50.00 $ 1,880.00 $ 57.00 $ 2,143.20 $ 27.00 $ 1,015.20 $ 92.11 $ 3,463.34 $ 55.00 $ 2,068.00 $ 61.00 $ 2,293.60 116 Sign Panel – Sheet Aluminum XI SQFT 66.6 $ 42.00 $ 2,797.20 $ 50.00 $ 3,330.00 $ 57.00 $ 3,796.20 $ 25.50 $ 1,698.30 $ 75.74 $ 5,044.28 $ 55.00 $ 3,663.00 $ 61.00 $ 4,062.60 117 Steel Posts – Square Tubular LBS 616 $ 10.00 $ 6,160.00 $ 23.00 $ 14,168.00 $ 25.00 $ 15,400.00 $ 2.75 $ 1,694.00 $ 32.94 $ 20,291.04 $ 25.00 $ 15,400.00 $ 27.00 $ 16,632.00 118 Square Tube Breakaway and Stub EACH 11 $ 750.00 $ 8,250.00 $ 410.00 $ 4,510.00 $ 475.00 $ 5,225.00 $ 487.50 $ 5,362.50 $ 619.58 $ 6,815.38 $ 500.00 $ 5,500.00 $ 500.00 $ 5,500.00 119 Remove Sign EACH 12 $ 65.00 $ 780.00 $ 55.00 $ 660.00 $ 295.00 $ 3,540.00 $ 112.00 $ 1,344.00 $ 392.14 $ 4,705.68 $ 300.00 $ 3,600.00 $ 315.00 $ 3,780.00 120 Landscaping LS 1 $ 25,000.00 $ 25,000.00 $ 17,000.00 $ 17,000.00 $ 5,000.00 $ 5,000.00 $ 33,118.00 $ 33,118.00 $ 11,605.85 $ 11,605.85 $ 40,000.00 $ 40,000.00 $ 43,000.00 $ 43,000.00 121 Adjust Valve Box EACH 6 $ 600.00 $ 3,600.00 $ 375.00 $ 2,250.00 $ 265.00 $ 1,590.00 $ 313.00 $ 1,878.00 $ 1,354.09 $ 8,124.54 $ 500.00 $ 3,000.00 $ 630.00 $ 3,780.00 122 Combined Inlet and Hydraulic Separator EACH 3 $ 20,800.00 $ 62,400.00 $ 23,000.00 $ 69,000.00 $ 23,000.00 $ 69,000.00 $ 20,168.00 $ 60,504.00 $ 31,627.55 $ 94,882.65 $ 27,000.00 $ 81,000.00 $ 23,000.00 $ 69,000.00 $527,687.20 $587,106.40 $694,448.95 $695,240.23 $769,669.00 $879,876.00 NOTES: THE ENGINEER ESTIMATE WAS ORIGINALLY REPORTED AS $528,040.00 DUE TO A ROUNDING ERROR. THIS BIDDER WAS CONSIDERED NON-RESPONSIVE DUE TO MISSING INFORMATION IN THE BID PACKAGE. BID PRICES ARE INCLUDED FOR INFORMATION ONLY. THIS BID TABULATION IS BELIEVED TO BE A TRUE AND CORRECT REPRESENTATION OF THE BIDS RECEIVED ON NOVEMBER, 26 2024. CITY OF BELGRADE - CAMERON AVENUE IMPROVEMENTS TABULATION OF BIDS RECEIVED ON NOVEMBER 26, 2024 DUNEMAN CONST. INC LAMCO LLC DC EXCAVATION LLC TREASURE STATE INC KNIFE RIVER - BELGRADE SCHEUDLE OF ITEMS TOTALS ENGINEER ESTIMATE CK MAY EXCATING, INC. PAGE 1 OF 1 Joseph Hauck Digitally signed by Joseph Hauck DN: C=US, E=[EMAIL REDACTED], O=City of Belgrade, OU=Pulbic Works - Engineering, CN=Joseph Hauck Reason: I am the author of this document Date: 2024.11.27 11:36:54-07'00'