← Back to Belgrade, MT

Document Belgrade_doc_e2219a9e31

Full Text

Update on the New Library Building -Volume 5- On November 1, all of the flat work concrete for the building will be finished. Martel took some drone shots of the building seen here. The two pictures above show shots from above Main Street. The bottom image shows the location of the future drive-thru book drop. Soon the rest of the framing will be done and a roof will be put on. Afterwards, work on the inside will begin this winter. Renderings located on the back! ---PAGE BREAK---