← Back to Belgrade, MT

Document Belgrade_doc_c5066b216d

Full Text

1 Required Inspections- Commercial Projects All Inspections and additional documentation are required if applicable. All applicable inspections and additional documentation shall be completed and approved prior to final inspection. Corrections on failed inspections must be re-scheduled and re-inspected. Photographs will not be accepted for corrections in lieu of a re-inspection. Scheduling Inspections Cut off time for next day inspections is 3:00 PM. Inspections scheduled after 3:00 PM will be processed the following business day. Inspections must be scheduled by phone or email only. Inspectors will not schedule future inspections. Phone: (406) 388-3560 Email: [EMAIL REDACTED] Additional Required Documentation & Inspections -Contact Public works for scheduling water line, sewer line, bacteria test, sidewalk, curb and gutter, ADA compliance, and parking lot inspections. -Contact City Planning/Zoning for scheduling landscape and parking lot inspections. -Provide documentation of state inspection results for elevators and boilers. -Provide documentation of third-party inspection results as requested by the building inspector or building official. Discrepancies of third -party inspections that have not been corrected by the contractor shall be brought to the attention of the building official prior to completion of that phase of the work. -Provide a final set of building plans that include and reflect any changes through the course of construction prior to final inspection. ---PAGE BREAK--- 2 Inspections Concrete Inspections -Footings -Foundation walls -Damp Proofing -Slabs (mono, on grade, & on deck) -Columns -CMU structural walls -Elevator shaft footings -Elevator shaft walls Building Inspections -Shear Walls -Rough Framing -Roof Dry-In -Insulation -Sheet Rock Screws -Suspended Ceiling Grid -Above Ceiling (MEPF) -Anchoring Plumbing Inspections -Underground Piping -Building Waste, Stormwater, and Vent Piping -Building Water Lines Piping Electrical Inspections -Temporary Meter Pole -Underground Conduits -Building Rough-In -Early Permanent Service -Electrical Grounding ---PAGE BREAK--- 3 Mechanical Inspections -Ductwork -Exhaust Fans -Dampers -Building Gas Lines -Gas Meter Bar Fire Inspections -Fire Walls -Fire Draft Stopping -Fire resistant penetrations -Alarms and Detectors -Sprinkler Piping and Heads -Fire Riser Flow Test Swimming Pool Inspections -Pool Structure -All Pool Bonding and Grounding -Pool Equipment Room -Lighting Wiring -Pool Plumbing -Main Drain Grate Final Inspections -Building Final -Plumbing Final -Electrical Final -Mechanical Final -Fire Final