← Back to Belgrade, MT

Document Belgrade_doc_863255b367

Full Text

MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV graphic window SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY TITLE SHEET, TABLE OF CONTENTS, & NOTES BID SET BID SET 1 PAVEMENT PRESERVATION 2025 GALLATIN WO 25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA FLATHEAD GLACIER LAKE SANDERS TOOLE PONDERA TETON LEWIS AND CLARK LIBERTY HILL CASCADE MEAGHER JUDITH BASIN POWELL MISSOULA GRANITE BROADWATER WHEATLAND FERGUS BLAINE GOLDEN VALLEY PHILLIPS PETROLEUM MUSSELSHELL VALLEY GARFIELD ROSEBUD DANIELS MC CONE PRAIRIE SHERIDAN ROOSEVELT RICHLAND DAWSON WIBAUX CUSTER FALLON CARTER POWDER RIVER BIG HORN YELLOWSTONE STILLWATER CARBON PARK GALLATIN JEFFERSON MADISON SILVER BOW RAVALLI BEAVERHEAD CHOUTEAU LINCOLN SWEET GRASS LODGE DEER TREASURE MINERAL CITY OF BELGRADE PUBLIC WORKS PAVEMENT PRESERVATION 2025 LENGTH 2.20 MILES SURFACING SOURCES - CONTRACTOR FURNISHED THIS PROJECT DATE APPROVED BY: CITY OF BELGRADE PUBLIC WORKS TABLE OF CONTENTS ROAD PLANS SHEET NO. TITLE SHEET 1 TABLE OF CONTENTS 1 NOTES 1 PLAN SHEETS 2-6 SUMMARIES 7-8 DETAILS 9 NOTES UTILITIES CALL THE UTILITIES UNDERGROUND LOCATION CENTER (811) OR OTHER NOTIFICATION SYSTEM FOR THE MARKING AND LOCATION OF ALL LINES AND SERVICES BEFORE EXCAVATING. ALL CLEARANCES OR DEPTHS PROVIDED FOR UTILITIES ARE FROM EXISTING GROUND LINE. USE EXTREME CAUTION WHEN WORKING AROUND OVERHEAD POWER LINES. BASIS OF PLAN QUANTITIES (QUANTITIES FOR ESTIMATING PURPOSES ONLY) COMP. AGGREGATE WEIGHT = 3700 LBS. PER CUBIC YARD COMP. WEIGHT OF PL. MIX BIT. SURF. = 3855 LBS. PER CUBIC YARD ASPHALT CEMENT - GRADE S - 3/4" AGG. = 5.4% OF PL.MIX BIT.SURF. ASPHALT CEMENT - GRADE S - 1/2" AGG. = 5.8% OF PL.MIX BIT.SURF. ASPHALT CEMENT - GRADE S - 3/8" AGG. = 6.2% OF PL.MIX BIT.SURF. HYDRATED LIME = 1.4% OF PL.MIX BIT.SURF. BITUMINOUS MATERIAL = 8.5 LBS. PER GAL. EMULSIFIED ASPHALT - TACK (ALL OTHER SURFACES)= 0.05 GAL. PER SQ.YARD (UNDILUTED) EMULSIFIED ASPHALT - TACK (CONCRETE SURFACES) = 0.10 GAL. PER SQ.YARD (UNDILUTED) JOSEPH J. HAUCK, PE 5/2025 BEGIN W PARK AVE 0+00 END W PARK AVE 27+75.00 BEGIN CENTRAL AVE 500+00 BEGIN PETERSON AVE 400+00 END PETERSON AVE 417+26.00 END BEIHL DR AND 11 ST. 316+32.00 END 10TH ST. AND SOUTHVIEW AVE. 617+03.00 END 120+45.00 END 220+73.00 END CENTRAL AVE 504+24.00 BEGIN BEIHL DR AND 11 ST. 300+00 BEGIN 600+00 BEGIN 100+00 BEGIN 200+00 10TH ST. AND SOUTHVIEW AVE. 9TH ST AND W ALLISON AVE 8TH ST. 8TH ST. 9TH ST AND W ALLISON AVE CITY OF BELGRADE PUBLIC WORKS ---PAGE BREAK--- 200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 220+00 220+73 BOA 200+00.00 PC 204+59.16 PT 204+59.51 PC 209+30.07 PT 209+30.09 PC 215+09.32 PT 215+09.42 PC 219+12.73 PT 220+59.88 EOA 220+72.99 MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV W PARK AVE W PARK AVE W ALLISON AVE CENTRAL AVE SOUTHVIEW AVE SOUTHVIEW AVE 9TH ST 9TH ST 9TH ST 8TH ST 8TH ST 8TH ST 7TH ST JACKRABBIT LN S W PARK AVE W MAIN ST 10TH ST. CENTRAL AVE 10TH ST. 11TH ST 10TH ST 10TH ST CUL DE SAC 11TH ST CUL-DE-SAC 10TH ST CUL-DE-SAC SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY 8TH ST PLAN BID SET BID SET 2 PAVEMENT PRESERVATION 2025 GALLATIN WO 25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA CITY OF BELGRADE PUBLIC WORKS BEGIN 200+00 8TH ST. END 220+73 8TH ST. ADJUST WATER VALVE 201+45 LT. 202+25 LT. (QTY 2) 202+90 LT. 204+70 LT. 208+30 LT 209+45 LT. 212+75 LT. 217+15 LT. ADJUST MANHOLE 204+52 LT. 205+38 LT. 209+40 LT. 210+80 LT. 212+35 LT 215+50 LT. 217+50 LT. 219+90 LT. ---PAGE BREAK--- 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 27+75 BOA 0+00.00 PC 7+21.32 PT 8+23.25 PI 11+76.01 PI 16+95.95 PI 22+55.55 PI 24+15.34 EOA 27+74.64 MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV W PARK AVE W PARK AVE W PARK AVE W ALLISON AVE CENTRAL AVE SOUTHVIEW AVE SOUTHVIEW AVE 9TH ST 9TH ST 9TH ST 8TH ST 8TH ST 8TH ST 7TH ST 11TH ST W PARK AVE W MAIN ST 13TH ST 10TH ST. CENTRAL AVE CENTRAL AVE 10TH ST. 11TH ST 10TH ST 10TH ST BIEHL DR BIEHL DR PETERSON AVE BIEHL DR CUL-DE-SAC 11TH ST CUL-DE-SAC 10TH ST CUL-DE-SAC SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY 8TH ST PLAN BID SET BID SET 3 PAVEMENT PRESERVATION 2025 GALLATIN WO 25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA CITY OF BELGRADE PUBLIC WORKS BEGIN 0+00 W PARK AVE END 27+50 W PARK AVE ADJUST WATER VALVE 0+29 LT. (QTY 2) 9+75 LT. 21+15 LT. 25+90 LT. 27+15 LT.. ADJUST MANHOLE 0+00 RT. 2+30 RT. 5+55 RT. 7+75 RT. 10+00 RT. 17+02 RT. 22+67 RT. 26+23 RT. 26+99 RT. ---PAGE BREAK--- 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 120+45 BOA 100+00.00 PC 104+59.94 PT 104+60.59 PC 109+31.21 PT 109+31.39 PC 116+96.08 PT 117+46.91 EOA 120+45.31 MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV WV WV WV WV WV WV W PARK AVE W PARK AVE W ALLISON AVE CENTRAL AVE SOUTHVIEW AVE SOUTHVIEW AVE 9TH ST 9TH ST 9TH ST 8TH ST 8TH ST 8TH ST 7TH ST JACKRABBIT LN 11TH ST W PARK AVE W MAIN ST 10TH ST. CENTRAL AVE 10TH ST. 11TH ST 10TH ST 10TH ST EHL DR RSON AVE BIEHL DR CUL-DE-SAC 11TH ST CUL-DE-SAC 10TH ST CUL-DE-SAC SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY 9TH ST PLAN BID SET BID SET 4 PAVEMENT PRESERVATION 2025 GALLATIN WO-25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA CITY OF BELGRADE PUBLIC WORKS BEGIN 100+00 9TH ST END 120+45 W ALLISON AVE ADJUST WATER VALVE 101+50 RT. (QTY 2) 103+70 RT. 104+65 RT. 105+10 RT. 109+50 RT. (QTY 2) 114+07 RT. (QTY 2) 116+90 RT. 117+60 RT. 120+45 RT. ADJUST MANHOLE 101+78 LT. 104+25 LT. 106+50 LT. 111+30 LT. 113+70 LT. 117+07 LT. ---PAGE BREAK--- MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH 600+00 610+00 617+03 BOA 600+00.00 PC 601+30.54 PT 601+30.69 PC 604+01.32 PT 604+02.20 PC 608+72.75 PT 608+73.96 PC 613+42.86 PT 613+43.46 PC 613+64.37 PT 613+86.29 PC 615+42.83 PT 615+42.84 EOA 617+03.14 MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV K AVE W PARK AVE W W ALLISON AVE CENTRAL AVE SOUTHVIEW AVE SOUTHVIEW AVE 9TH ST 9TH ST 9TH ST 8TH ST 8TH ST 8TH ST 7TH ST JACKRABBIT LN 11TH ST W PARK AVE W MAIN ST 10TH ST. CENTRAL AVE CENTRAL AVE 10TH ST. 11TH ST 10TH ST 10TH ST BIEHL DR BIEHL DR PETERSON AVE BIEHL DR CUL-DE-SAC 11TH ST CUL-DE-SAC 10TH ST CUL-DE-SAC SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY 10TH ST PLAN SET BID SET BID SET 5 PAVEMENT PRESERVATION 2025 GALLATIN WO-25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA CITY OF BELGRADE PUBLIC WORKS BEGIN 600+00 10TH ST END 617+03 SOUTHVIEW AVE ADJUST WATER VALVE 101+50 RT. (QTY 2) 600+28 LT. 600+96 LT. 604+93 LT. 605+00 LT. 609+50 LT. 609+75 LT. 612+50 LT. ADJUST MANHOLE 600+58 LT. 604+15 LT. 606+85 LT. 610+50 LT. 613+75 LT. 613+80 LT. RECONSTRUCTION FULL-DEPTH AREA ---PAGE BREAK--- WV MH MH MH MH 300+00 310+00 315+84 BOA 300+00.00 PC 300+70.61 PT 300+76.95 PC 303+83.29 PT 303+86.18 PC 305+94.83 PT 306+58.30 PC 306+66.99 PT 306+67.35 PC 312+85.72 PT 312+85.89 PC 314+11.27 PT 314+11.91 PC 315+68.42 PT 315+78.56 EOA 315+84.38 MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV WV WV WV WV W PARK AVE W PARK AVE 11TH ST CENTRAL AVE CENTRAL AVE 11TH ST BIEHL DR BIEHL DR 300+00 310+00 315+84 PETERSON AVE BIEHL DR CUL-DE-SAC 11TH ST CUL-DE-SAC MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV MH MH MH MH MH MH MH MH MH MH MH MH MH MH 500+00 504+24 BOA 500+00.00 EOA 504+23.93 PC 500+32.08 PC 501+23.43 PT 500+94.90 PT 501+67.90 400+00 410+00 410+66 BOA 400+00.00 PC 400+70.71 PT 401+00.09 PC 401+14.39 PT 401+33.33 PC 401+57.16 PT 401+78.24 PC 402+07.92 PT 402+22.40 PC 402+60.33 PT 402+60.70 PC 406+79.80 PT 406+79.97 PC 408+74.33 PT 408+76.15 EOA 410+66.25 MH MH MH MH MH MH MH MH MH MH MH MH WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV W PARK AVE W PARK AVE CENTRAL AVE 9TH ST 9TH ST 8TH ST 8TH ST 11TH ST W PARK AVE 13TH ST 10TH ST. CENTRAL AVE CENTRAL AVE 10TH ST. 11TH ST 10TH ST BIEHL DR BIEHL DR PETERSON AVE 11TH ST SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY CENTRAL AVE AND PETERSON AVE PLAN BID SET BID SET 6 PAVEMENT PRESERVATION 2025 GALLATIN WO-25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA CITY OF BELGRADE PUBLIC WORKS BEGIN 400+00 CENTRAL AVE END 410+66 CENTRAL AVE BEGIN 300+00 BIEHL DR END 315+84 11TH ST CUL-DE-SAC ADJUST WATER VALVE 400+15 LT. 402+65 LT. 406+00 LT. 500+17 LT. 503+45 LT. ADJUST MANHOLE 401+11 RT. 401+69 RT. 404+01 RT. 501.38 RT. ADJUST WATER VALVE 300+05 RT. 300+07 RT. 306+02 RT. 308+50 LT. 310+15 LT. 314+50 LT. ADJUST MANHOLE 300+78 LT. 303+40 LT. 306+11 LT. 308+90 LT. 311+35 LT. 316+32 LT. END 504+24 PETERSON AVE BEGIN 500+00 PETERSON AVE ---PAGE BREAK--- SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY SUMMARIES BID SET BID SET 7 PAVEMENT PRESERVATION 2025 GALLATIN WO 25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA SUMMARY CITY OF BELGRADE PUBLIC WORKS ---PAGE BREAK--- SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY SUMMARIES BID SET BID SET 8 PAVEMENT PRESERVATION 2025 GALLATIN WO 25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA SUMMARY CITY OF BELGRADE PUBLIC WORKS ---PAGE BREAK--- NEW PLANT MIX BIT. SURF. EX. PLANT MIX BIT. SURF. NEW PLANT MIX BIT. SURF. EX. PLANT MIX BIT. SURF. MILLING/PAVING LIMITS MAINLINE TOP WIDTH EOP EXISITNG SURFACE BOUNDARY MILLING LENGTH 25FT 0.15' OVERLAY 0.15' MILL/FILL SHEET NO. PROJECT ID COUNTY UPN PROJECT NAME MONTANA Department of Transportation DESIGNED BY REVIEWED BY CHECKED BY DETAILS BID SET BID SET 9 PAVEMENT PRESERVATION 2025 GALLATIN WO 25-02 ROAD PLANS 7/9/2025 2:31 PM PAVE_PRES_DESIGN.DWG L. WEARLEY 4/2025 J. HAUCK 5/2025 5/2025 C. ULJUA CITY OF BELGRADE PUBLIC WORKS 28.0 FT 14.0 FT 14.0 FT 0.15 FT. PMS OVERLAY MATCH EXISTING CROSS SLOPE MATCH EXISTING CROSS SLOPE TYPICAL SECTION (ALL ROADS) NOT TO SCALE 6:1 SLOPE, TIE IN TO ALL EXISTING DRIVEWAYS AND APPROACHES. MATCH EXISTING GRADES 6:1 SLOPE, TIE IN TO ALL EXISTING DRIVEWAYS AND APPROACHES. MATCH EXISTING GRADES OVERLAY TRANSITION NOT TO SCALE