Full Text
We reviewed the recent RFP posted for Design & Install for Fiber Optic Cable Installation and have a quick question. If known, when is this project expected to go to bid for contractors and what is the expected start date for construction? All dates are confined in the RFP. Can we use the drawing you provided, or do we need to create another drawing with a PE stamp? The drawing is provided for reference but isn’t engineering grade. Is a PE stamp required for the drawings? Yes, it is required for this project.