Full Text
WRF Lagoon Rehab I Phase 1.0 00 91 01 - 1 Addendum No. 1 Belgrade, Montana SECTION 00 91 01 - ADDENDUM NO. 1 May 20, 2025 BELGRADE WRF LAGOON REHABILITATION PHASE 1.0 CITY OF BELGRADE, MONTANA Project Numbers I Owner: 22-04 I Engineer: P10052-2022-004 I SRF: C301323 This Addendum No. 1 forms part of the Contract Documents and modifies the original Bidding Documents as noted below. All provisions of the Contract Documents not in conflict with this Addendum shall remain in full force. Acknowledge receipt of this Addendum in the space provided on the Bid Form and on the outside of the Bid Envelope. Failure to do so may subject the Bidder to disqualification. This addendum consists of one page and zero attachments. SECTION 00 21 13 – INSTRUCTIONS TO BIDDERS REPLACE Paragraph 29.06 with the following Domestic Preference requirements of the Build America, Buy America Act (BABAA) 29.06 DOMESTIC PREFERENCE I BUILD AMERICA, BUY AMERICA ACT (BABAA) A. Provisions of the Build America, Buy America Act (BABAA) apply to this project. All Iron and Steel Products, Manufactured Products, and Construction Materials used in this project must comply with the Build America, Buy America Act (BABAA) requirements mandated by Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Aggregates such as stone, sand, and gravel do not apply to BABAA. B. The following waivers apply to this Contract: 1. BABAA De Minimis, Small Grants and Minor Components I hereby certify that this Addendum was prepared by me or under my direct supervision, and that I am duly registered as a Professional Engineer under the laws of the State of Montana. Brian J Viall, PE Registration Number 51168-PE END OF ADDENDUM NO. 1 C L N L N R O A I S M O N T A N A P R O F E S E N G E E BRIAN J. VIALL I No. 51168 PE I D E S N E 05/20/2025