Full Text
1 CITY OF BELGRADE FEE SCHEDULE (updated May 20, 2024, Resolution 2024-08) This fee schedule replaces the fees adopted by Resolution No. 2021-36 SUBDIVISIONS Application Planning Fee Certified Mail Fee Fire Protection Review Fee Pre-Application Pre-Application $600 - $100 Preliminary Plat Preliminary Plat Review – First Minor Subdivision $1,510 - $300 Preliminary Plat Review – Subsequent Minor or Major Subdivision $4,300 + $100/Unit1 Required $500 + $10/Unit Neighborhood Plan Review $900 - - Phased Subdivision – Phase Commencement Review $1,510 Required $300 Subdivision Variance Request (Per Variance) $600 Required - Subdivision PUD $600 + $200/Waiver + Preliminary Plat Fees - - Extension of Preliminary Plat Approval $450 - - Change of Preliminary Plat Conditions – Simple $450 Required $200 Change of Preliminary Plat Conditions – Complex $650 Required $200 Waiver from Flood Study/Flood Hazard Evaluation $600 - - Final Plat Final Plat Review – First Minor Subdivision $600 - $100 ---PAGE BREAK--- 2 Final Plat Review – Major or Subsequent Minor Subdivision $600 + $100/Unit - $150 Final Plat Amendment – (Other than Subsequent Subdivisions) $450 Required - Vacation of Recorded Plat – $450 Required - Improvements Agreements Improvements Agreement $600 - - Improvements Agreement – Partial Reduction $400 - - Improvements Agreement – Extension $400 - - Exemptions Application for Subdivision Exemption $400 - - Condominium Declaration Examination of Condominium Declaration $200 - - Fire Review Fire Protection Water Supply Testing2 - - $300 + $10/Hydrant Fire Sprinkler System Plan Review & Testing2 - - $200/System Other Claim of Inaccurate or Incomplete Information $400 Required - Notes 1 A “unit” is described as a residential dwelling unit, residential lot, a commercial lot, a condominium, a townhouse, an individual recreational vehicle parking site or a mobile home “lot”. 2 Fees for Fire Protection Water Supply Testing and Fire Sprinkler Plan Review & Testing are required only where the subdivider chooses to have a Fire District or Fire Service perform the required testing and/or review instead of contracting with a professional engineer. BUILDING PERMITS Maximum building permit fees charged by the Building Department are based on the Building Valuation Data and ICC Plan Review Fee Schedule published in the International Code Council (ICC) Building Safety Journal. Other methods of calculating building valuation may be approved by the Building Official (e.g. architect or contractor estimate). Building Department revenues and budget shall comply with 50-60-106(2) MCA. ---PAGE BREAK--- 3 Building Permit Building Valuation (as calculated per the Building Safety Journal or by other methods approved by the Building Official) multiplied by .0068 Plan Review Building Valuation (see above) multiplied by .0012 (or $100, whichever is greater). Plumbing, Electrical, and Mechanical Permit Fees are calculated as detailed on the appropriate form (see attached). ZONING REQUEST TYPE REQUEST DEFINED FEE CERTIFIED MAIL LAND USE PERMITS Land Use Permit (LUP) Minor Including but not limited to: fences, decks, patios, minor structures (defined per zoning district), agricultural structures $150 Land Use Permit (LUP) Standard Residential and Accessory structures defined by zoning that require permitting The greater of $400 or 1/4 of one percent (0.0025) of the market value of construction, excluding land cost. Maximum land use permit $5,000 Land Use Permit (LUP) Major (includes relevant Site Plan Review) Multi-Family, Commercial, Institutional, Industrial land use permit The greater of $400 or 1/4 of one percent (0.0025) of the market value of construction, excluding land cost. Maximum land use permit $25,000 Land Use Permit (LUP) After the Fact Structures built prior to obtaining a land use permit Double the base Land Use Permit fee Land Use Permit (LUP) Revisit If an applicant submits a land use permit and 2nd site visit (or more) is required $200 Land Use Permit (LUP) Modification Modifications to a LUP that are deemed by the Planning Director to not require a new submittal $100 Conditional Use Permits (CUP) Conditional Use Permit (CUP) Minor Including but not limited to: guest houses, caretaker's houses, home occupations, community residential facilities and other accessory structures $850 Required Conditional Use Permit (CUP) Standard Conditional Use defined by zoning regulations $1,250 Required ---PAGE BREAK--- 4 Conditional Use Permit (CUP)Natural Resources Conditional Use defined by zoning regulations for natural resources including mining operations, concrete and batch asphalt $18,800 Required Conditional Use Permit (CUP) Planned Unit Development Pre-app Review Planned Unit Development (PUD) as permitted by the zoning regulations, preliminary review of the project prior to submittal. $600 Required Conditional Use Permit (CUP) Planned Unit Development Main Review Planned Unit Development (PUD) as permitted by the zoning regulations, preliminary review of the project prior to submittal. $4,030 + $100 per unit or lot Required VARIANCE REVIEW Variance Review Variances defined by zoning regulations $1,250 Required ANNEXATION Annexation $750 Required AMENDMENTS Growth Policy Text Amendment County $6,270 City $6,270 Growth Policy Map Amendment County $6,270 City $6,270 Required Neighborhood Plan Amendment $1,510 Zoning Text Amendment County $2,460 City $2,460 Zoning Map Amendment County $2,460 City $2,460 Required IMPROVEMENTS AGREEMENTS Zoning Improvements Agreement $600 Zoning Improvements Partial Reduction $600 Zoning Improvements Extensions $400 SIGN PERMITS Sign Permit $100 Master Sign Plan $400 ADMINISTRATIVE FEES TYPE FEE Request for Administrative Determination (zoning, subdivision, etc.) $450 Appeal (zoning, subdivision, floodplain, etc.) $450 Noticing Fee (when necessary to re-notice due to action by applicant) $45 Certified Mail $10 Copies & Scans $0.25 per page