City of Belgrade Solar Plan Submittal Requirements. CAD Requirements • Require the following information: o Plaques o Equipment Elevation Drawings o Neutral Pass thru o NG Bond (Neutral Ground bonding) o Production Meter o Disconnect o Separate PDF pages • City Codes follow for: o Electrical 2020 NEC o Building 2021 IBC o Residential 2021 IRC Engineering Requirements • Require the following information: o Structural Engineer Stamp o Engineering Calculations o One-line Diagram o Wet Stamp • Fire setback requirements o Eaves 3ft on one side. o Ridges 1.5ft o Hips 1.5ft o Valleys 1.5ft