1 Required Inspections- Residential Projects All Inspections and additional documentation are required if applicable. All applicable inspections and additional documentation shall be completed and approved prior to final inspection. Corrections on failed inspections must be re-scheduled and re-inspected. Photographs will not be accepted for corrections in lieu of a re-inspection. Scheduling Inspections Cut off time for next day inspections is 3:00 PM. Inspections scheduled after 3:00 PM will be processed the following business day. Inspections must be scheduled by phone or email only. Inspectors will not schedule future inspections. Phone: (406) 388-3560 Email: [EMAIL REDACTED] Additional Required Documentation & Inspections -Contact Public works for scheduling water line, sewer line, bacteria test, sidewalk, and driveway approach inspections. -Provide documentation of third-party inspection results as requested by the building inspector or building official. -Provide documentation of duct test results if located in unconditioned spaces, and blower door results by Email: [EMAIL REDACTED] Inspections Concrete Inspections -Footings -Foundation walls -Damp Proofing -Slabs (structural) -CMU (structural) ---PAGE BREAK--- 2 Building Inspections -Shear Walls -Rough Framing -Roof Dry-In -Insulation -Sheet Rock Screws Plumbing Inspections -Underground Piping -Building Waste, and Vent Piping -Building Water Lines Piping Electrical Inspections -Temporary Meter Pole -Building Rough-In -Early Permanent Service Mechanical Inspections -Ductwork -Exhaust Fans -Building Gas Lines -Gas Meter Bar Fire Inspections -Fire Walls -Fire Draft Stopping -Fire resistant penetrations Final Inspections -Building Final -Plumbing Final -Electrical Final -Mechanical Final