← Back to Arvada, CO

Document Arvada_doc_aefa09a855

Full Text

‭FOUNDATION INSPECTION FORM (FIF FORM)‬ ‭PERMIT ‭SOILS REPORT ‭CONTACT ‭PHONE ‭Inspections performed and certified by this report are in compliance with all required City of Arvada‬ ‭Ordinances and the current adopted Building Code & National Electrical Code and shall be stamped by a‬ ‭design professional, licensed in the State of Colorado, who has experience with foundation design and‬ ‭expansive soils. The engineer inspecting the soils and foundation components shall consult the design‬ ‭engineer and/or the geotechnical engineer if any unusual conditions or conditions that are not consistent‬ ‭with the soils report are present. If any modifications are required, plans must be approved by the design‬ ‭engineer and submitted to the City of Arvada before work continues.‬ ‭The inspections were performed by a qualified inspector by the firm listed and as the qualifying engineer‬ ‭agree that the inspections meet the City of Arvada requirements and do hereby certify that the applicable‬ ‭portions of the foundation and subsurface drainage systems conform to the plans and specifications, which‬ ‭were submitted to the Building Inspection Division, of the City of Arvada. However, this certification does‬ ‭not guarantee the performance of the foundation system, or concrete encased electrode.‬ ‭PART 1 (page 2 of this document)-‬‭Please fill this page out when one Engineer/‬ ‭Engineering firm is performing all required foundation inspections.‬ ‭PART 2 (page 3 of this document)-‬‭Please fill this page out when different Engineers/‬ ‭Engineering firms will be performing separate required foundation inspections.‬ ‭Updated November 2023‬ ---PAGE BREAK--- ‭OPEN HOLE/SITE CONDITIONS, FOOTING/CAISSON/PIER, WALL‬ ‭STEEL/REINFORCEMENT, DAMP PROOFING AND FOUNDATION DRAIN‬ ‭DATE: ‭ENGINEERING ‭PHONE ‭CONCRETE ENCASED ELECTRODE INSPECTION (CEG/UFER)‬ ‭●‬‭Complies with NEC Section 250.52, Sub-division ‭DATE OF INSPECTION: ‭LOCATION OF CEG/UFER: ‭FOUNDATION TYPE:‬ ‭Drilled Piers‬ ‭Spread Footings‬ ‭Pad & Grad Beam‬ ‭Narrow Spread Footing‬ ‭Tendon Slab Foundations/ Post Tension Slab Foundations‬ ‭Updated November 2023‬ ---PAGE BREAK--- ‭OPEN HOLE/SITE CONDITIONS‬ ‭DATE: ‭ENGINEERING ‭PHONE ‭FOUNDATION WALL STEEL/ FOOTER/ PIERS‬ ‭DATE: ‭ENGINEERING ‭PHONE ‭DAMPPROOFING AND FOUNDATION/ PERIMETER DRAIN‬ ‭DATE: ‭ENGINEERING ‭PHONE ‭CONCRETE ENCASED ELECTRODE INSPECTION (CEG/UFER)‬ Complies with NEC Section 250.52, Sub-division ‭DATE OF INSPECTION: ‭LOCATION OF CEG/UFER: ‭FOUNDATION TYPE:‬ ‭Drilled Piers‬ ‭Spread Footings‬ ‭Pad & Grad Beam‬ ‭Narrow Spread Footing‬ ‭Tendon Slab Foundations/ Post Tension Slab Foundations‬ ‭Other: ‭Updated November 2023‬