← Back to Arvada, CO

Document Arvada_doc_4499dd0170

Full Text

Department of Public Works Engineering Division Phone: [PHONE REDACTED] Email: [EMAIL REDACTED] Dry Utility Quantities Worksheet 2023 Please complete the following worksheet to detail the total quantities of work being done and the contractor performing the task. NOTE: All right of way work is subject to review in the field and if inaccuracies are found, additional fees may be assessed. Job Value Total Tax 58% of the job value is assumed to be materials, Use taxes will be assessed by QUANTITY UNIT FEE SUB TOTAL Overhead Utility LF $.26* Underground Utility LF $.26* Boring Distance LF $.26* Bore Pit Bore Pit Cut Whole stone must be replaced Concrete EA $18 Landscape EA $18 Other Asphalt Cut/Trench Asphalt Cut SY $.18* Test Hole(s) Whole stone must be replaced Concrete EA $62 Street EA $62 Landscape EA $18 Notes: BELOW THIS LINE - FOR OFFICE USE ONLY Asphalt Patch - 1 Pothole = 0.5 LF SY $.18* Street Subgrade - 1 Pothole = 0.5 LF of Subgrade SY $.18* Street Degradation Fee - Long side of trench and/or 1 Pothole = 1 LF of Degradation LF $19.00*+ Milling SY $.18* Paving --Street Degradation is not needed if Milling and Overlay SY $.18* ADA Ramp EA $74.00 Combination Curb, Gutter & Walk LF $.50* Vertical Curb & Gutter LF $.50* Detached Walk LF $.50* Crosspan/Curb Cut EA $74 Striping LF $.13* Pavement Markings EA $13 *MINIMUM PERMIT CHARGE PER IMPROVEMENT OF $62.00 Surcharge for work without permit/license ($250 or double permit fee) whichever is greater *+Street Degradation fee includes the required 20LF Traffic Control Plan Review Single Service EA $62.00 Roadway Classification determined by the City Local Street EA $92.00 Collector Street EA $125.00 Arterial Street EA $300.00 Note: This worksheet is only an estimate, additional fees may be applied. REVISED 12/30/2022 JEM $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00