ANOKA COUNTY 2030 TRANSPORTATION PLAN 9-1 DECEMBER 2008 9.0 Results: 2030 Transportation Implementation Plan 9.1 Setting Project and Funding Priorities The technical and statistical information developed and analyzed by this Plan leads directly to recommended implementation plans for short-term (2009-2015), mid-term (2015-2020), and long-term (2020-2030) improvements as described in Section 7. These recommendations focus on the County’s mobility-impaired corridors projected to experience the most significant operation and safety issues in the 2030 forecast year. Section 7 also draws attention to the interrelationships between planning work undertaken by independent partner entities such as the Metropolitan Council and Mn/DOT. It is not coincidental that nearly all of the mobility impaired corridors identified in the 2030 Plan by Anoka County also appear as proposed transitways in the Metropolitan Council’s 2030 Transportation Policy Plan. Ongoing transit planning at both the regional and county level informs the evaluation of alternative approaches to the congestion problems in those key corridors, benefitting both county facilities and the regional transit system. The Plan also highlights the presence of heavy roadway freight movements in the congested portions of the TH 10/CSAH 1 corridor between Coon Rapids and I-694. Significant commerce moves by truck and rail within this corridor, supporting the Plan recommendation that TH 47—planned for turnback to Anoka County south of I-694—and CSAH 1 be designated and authorized for separate funding as freight corridors. 9.1.1 Project Priorities Because each of the areas highlighted in the 2030 Plan both affects and is affected by parallel facilities and concurrent activities by other entities and agency partners, the Plan recommends corridor or sub-area studies in most cases. Each should be undertaken with full cognizance of interrelationships, and full participation by stakeholders, as is the County’s practice. Corridor and sub-area studies will be tasked with collecting and analyzing the best information available at that point in time, including the findings of this Plan, the local community’s plan, and regional plans, with specific awareness of identified problems. With this background assembled, the next tasks would be to assess the improvements needed within the context of the city or township, within the county highway and transit system, within the regional highway and transit system, and with full recognition of the needs of the surrounding residents and business community. The list of specific improvements will include those listed in Chapter 7; however, the mode(s) involved (bus or rail transit, freight, bike and pedestrian), and the issue(s) being addressed (safety, capacity, mobility, etc.) will help identify individual projects. By identifying the individual projects to be completed within the corridor or sub-area, funding issues can be evaluated and then leveraged to the best advantage of the County. ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN 9-2 DECEMBER 2008 9.1.2 Funding Priorities The County’s implementation program will be fiscally strategic, maintaining the ability to flex with shifts in funding opportunities. While it would be ideal if the various needs defined in Chapter 7 and further developed through corridor and sub-area studies had recognizable and abundant funding sources, the transportation funding situation is anything but ideal. As discussed in Chapter 8, funding sources are inadequate to meet the needs for identified transportation improvements. In addition, many of these funding sources are random and unstable. While the county property tax levy can reasonably be expected to be stable in its base amount and growth factors, other funding sources fluctuate. When funding sources fluctuate based on policy changes, particularly at the national level, new funding opportunities often present themselves. An example of this is the current focus on safety in all parts of the transportation industry. One recent project the County funded in this manner was a series of driver feedback signs that were part of the “Safe Routes to School” program implemented nationally. When the funding became available, the County Highway Department was ready with a set of projects that fit the requirements of school safety, and built 15 sets of the driver feedback signs in school districts throughout the county. Policy changes at a state level have also provided unexpected transportation funding opportunities for the County. After many years of no change in the funding formulas for state transportation funding, the local transportation community has been surprised by several recent events, including:  Bonding funds became available for major safety projects, providing the final piece of funding for the TH 65/CSAH 14 (Main Street/125th Avenue NE) in Blaine, one of the highest crash locations in Minnesota (temporary funding source)  The 2008 Minnesota Legislature raised the gas tax, providing more funding for roadway and transit improvements (permanent funding source) Other shifts which affected funding included:  The national and local economies slowed, resulting in lower bids for construction projects by contractors  To spur the national and local economies, the federal government offered “stimulus funds” for various transportation projects In summary, while the safety, capacity and mobility improvements needed by 2030 have been identified and prioritized in this Plan, it is not possible to definitively predict the funding sources necessary for their implementation. Therefore, Anoka County will continue to work with its constituents and partners to identify its transportation system needs, while remaining flexible enough to leverage any and all funding sources which present themselves over the coming years. ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN Table 9-1 Short-Term Improvements (2009 – 2015) Corridor/Sub-Area Studies (see Section 7.0, Evaluation Process & Recommendations) Roadway From To Comment CSAH 1 Coon Rapids Boulevard CSAH 7, Anoka CSAH 3, Coon Rapids Address access management, safety, capacity and transit. Study currently underway. (See also Commuter Rail Transit Service) (see Table 7-4) CSAH 1 East River Road CSAH 3, Coon Rapids I-694, Fridley Address access management, safety, capacity. Evaluate designation as Freight Corridor. (see Table 7-5) CSAH 3 & CSAH 10 CSAH 1, Coon Rapids Ramsey County Line, Spring Lake Park Address access, safety. Component of overall east/west area improvements, paired with new grade-separations along CSAH 8/Osborne Road at TH 47 and TH 65. (see Table 7-6) CSAH 9 Round Lake Boulevard (West Central Sub- Area Study) CSAH 14, Anoka CSAH 20/161st Avenue, Andover Address right-of-way preservation, parallel routes, capacity, safety, signal spacing. Prepare for upgrade to Principal Arterial, replacement for TH 47. Included in the West Central Sub-Area Study area are CSAH Boulevard, CSAH 57/Sunfish Lake Boulevard, CSAH 116/Bunker Lake Boulevard. (see Table 7- 9) CSAH 17 Lexington Avenue (East Central Sub- Area Study) CSAH 23, Lexington/Circle Pines CSAH 14, Blaine Address right-of-way preservation, access management, parallel routes, traffic operations. Critical component of overall CSAH 17/CSAH 23 East Central Sub-Area (See also I-35W Transit Corridor Study) (see Table 7-14) CSAH 22 Viking Boulevard CSAH 85, Linwood County Line, Linwood Address access management and prepare for turn-up to Mn/DOT as Trunk Highway. (see Table 7-19) CSAH 23 Lake Drive (East Central Sub- Area Study) I-35W, Blaine CSAH 49, Lino Lakes Address right-of-way preservation and safety. Critical component of overall CSAH 17/CSAH 23 East Central Sub-Area. (See also I-35W Transit Corridor Study) (see Table 7-15) CSAH 24 Bridge Street (St. Francis Sub- Area) TH 47, St. Francis CSAH 9, St. Francis Address land uses, Rum River bridge capacity, heavy school bus traffic. (see Table 7-21) CSAH 51 University Avenue CSAH 10, Blaine CSAH 13, East Bethel/Oak Grove Component of overall TH 65 area north/south improvements. Plan for possible extension of CSAH 51 to CSAH 13. (See also Northern Lights Express Commuter Rail Study) (see Table 7-7) CSAH / CR 52 Radisson Road (East Central Sub- Area Study) I-35W, Blaine CR 18, Ham Lake Address traffic management issues presented by special intense use facilities (National Sports Center, other). With proposed north extension, potential reliever for CSAH 17, TH 65. (See also I-35W Transit Corridor Study) (see Table 7-16) Roadway Construction/Reconstruction (see Section 7.0, Evaluation Process & Recommendations) Roadway From To Type of Improvement Comment CSAH 14 Main Street CSAH 23, Lino Lakes I-35E, Centerville Reconstruction of Existing Roadway (in 2008 – 2012 Anoka County Capital Improvement Program for 2008 with finish date in 2009) (see Table 7-17) CSAH 23 Lake Drive At CR 53/CR 49 intersection, Lino Lakes Glenview Drive on CR 53, Lino Lakes New Roadway Construction 4-lane (A Minor Expander) (see Table 7-15) CSAH 52 Radisson Road CSAH 14, Blaine CSAH 116, Ham Lake Reconstruction of Existing Roadway Expand to 4-lane divided (in 2008 – 2012 Anoka County Capital Improvement Program for 2009), implement ITS improvements (see Table 7-16) CSAH 116 Bunker Lake Boulevard CSAH 7/7th Avenue, Andover CSAH Boulevard, Ramsey Safety/Access Improvements and Reconstruction 4-lane (Thurston Avenue to CR 57/Sunfish Lake Boulevard). Construct spot improvements recommended in 2003 CSAH 116 Corridor Study Report for safety, access management. (see Table 7- 10) CR 18 Crosstown Boulevard CR 18 at Crosstown Drive, Andover CSAH 20- 161st Avenue near CR 59, Andover New Roadway Construction 4-lane (A Minor Expander) Support Andover’s efforts for new connection - provides parallel relief to both CSAH 9 and CSAH 78 (see Table 7- 22) CR 74 / CR 15 Eastern intersection of CR 74 and CR 15, East Bethel Western intersection of CR 74 and CR 15, East Bethel New Roadway Construction 2-lane (Major Collector) Removes jog between CR 74 (at 213th Avenue) and CR 15 (Durant Street) (see Table 7-22) Intersection/Interchange Improvements (see Section 6.0, Intersection Decision Process) Roadway Intersection Improvement TH 10 TH 169, Anoka Upgrade/New Interchange TH 10 CSAH 51/University Ave, Coon Rapids/Blaine Upgrade/New Interchange TH 10 / TH 169 Thurston Avenue, Anoka New Interchange TH 10 / TH 169 CSAH Boulevard, Ramsey New Interchange TH 10 / TH 169 CSAH 57/Sunfish Lake Boulevard, Ramsey New Interchange TH 10 / TH 169 CSAH 56/Ramsey Boulevard, Ramsey New Interchange TH 47 CSAH 10, Coon Rapids Upgrade Interchange Intersection Signal Installations (see Section 6.0, Intersection Decision Process) Road Intersection Warrant Probability TH 65 CR 74, East Bethel High CSAH 7 147th Avenue, Andover High CSAH 9 South Coon Creek Drive, Andover High CSAH 9 CSAH 58, Andover/Oak Grove High CSAH 17 149th Avenue, Ham Lake High CSAH 18 CSAH 62, Columbus Moderate CSAH 18 CR 68, Ham Lake High CSAH 18 E. Lake Netta Drive, Ham Lake High CSAH 18 CSAH 58, Ham Lake High CSAH 18 CR 19, Columbus High CSAH 20 CSAH 18, Crosstown Boulevard, Andover Moderate CSAH 22 CSAH 9, Oak Grove High CSAH 22 CSAH 5, Nowthen High CSAH 22 / CR 64 CSAH 83, Ramsey/Nowthen Moderate CSAH 24 CSAH 9, St. Francis High CSAH 78 133rd Ave, Coon Rapids/Andover High CSAH 83 Alpine Drive, Ramsey High CSAH 83 CSAH 116, Ramsey High CSAH 116 CR 57, Ramsey High CR 49 Lever Street, Blaine/Circle Pines High CR 60 University Avenue, Andover Moderate Transit Improvements Route/ Roadway Study/Improvement Existing Service Station/ Park and Ride Facility TH 65 from CSAH 116 to TH 10 Bus shoulder lanes by Team Transit Scheduled transit service by Metro Transit TH 65 & CSAH 14 Park-and-ride Scheduled service by Metro Transit (interrelated to start-up of Northern Lights Express) (see Figures 3-18 and 3-19) Commuter Rail Construction and start-up route from Big Lake to Minneapolis with stations in Ramsey, Anoka, Coon Rapids and Fridley Continue planning for expanded service from Big Lake to St. Cloud area (interrelated with CSAH 1 corridor) (see Figures 3-18 and 3-19) Express Bus Service (to be moved to other corridors after implementation of rail service) Construct stations in Ramsey, Anoka, Coon Rapids, Fridley Northern Lights Express Commuter Rail Begin Planning Study, Environmental and Preliminary Engineering of new route from St. Louis and Lake County to Minneapolis via Coon Rapids juncture with Commuter Rail (interrelated with CSAH 51 corridor) (see Figures 3-18 and 3-19) Plan for new stations in Andover, Oak Grove, East Bethel I-35W Transit Corridor Begin Planning Study per regional 2030 Transit Plan (interrelated with East Central Subarea Study) (see Figures 3-18 and 3-19) Bus shoulder lanes south of CSAH 52 / Radisson Road Central Avenue Light Rail Transit Begin planning study for new route from Southern Anoka County to Minneapolis, potential juncture with Hiawatha, Central LRT Corridors per regional 2030 Transit Plan (interrelated with Northern Lights, CSAH 51 corridors) (see Figures 3-18 and 3-19) Metro Transit, Bus shoulder lane segment (CSAH 10 to TH 10) Plan for new stations in northern county, Blaine, Spring Lake Park, Columbia Heights Rush Line Express Bus Minneapolis & St. Paul Continue planning with Washington, Ramsey Counties for future conversion to rail/BRT service, Complete environmental study. (see Figures 3-18 and 3-19) Rush Line Express Plan for Park and Ride facility at I- 35E/CSAH 14 CSAH 1 Coon Rapids Blvd/East River Rd Begin planning, environmental study and preliminary engineering for links to stations in Anoka and Coon Rapids (interrelated to CSAH 1 corridor and startup) (see Table 7-4) Anoka County Traveler (ACT), Metro Transit, Shoulder lane Complete Commuter Rail Station in Fridley CSAH 3 / CSAH 10 Begin planning for link to planned Port Evergreen in Coon Rapids (interrelated with CSAH 1 corridor study )(see Table 7-6) ACT, Metro Transit CSAH 9 Round Lake Blvd Begin planning for expansion of transit service to CSAH 116 (interrelated with West Central Sub-Area Study) (see Table 7-9) ACT CSAH 14 Main Street Northerly Bypass With Metro Transit, implement new 200 space park and ride facility in the NW quadrant of CSAH 14 and I-35E per Metro Transit’s Park and Ride Facility Plan. (see Table 7-17) New facility at I-35E CSAH 17 Lexington Avenue (East Central Sub-Area Study) Include in CSAH 17/CSAH 23 East Central Sub-Area Study. Begin discussions with transit provider for shoulder bus operation to CSAH 14. (see Table 7-14) MT, Implement planned ACT route Expand 95th Avenue NE Park and Ride CSAH 23 Lake Drive (East Central Sub-Area Study) Include in CSAH 17/CSAH 23 East Central Sub-Area Study. Begin discussions with transit provider for shoulder bus operation to CSAH 14 (interrelated with I-35W Transit)(see Table 7-15) Implement planned ACT route Expand 95th Avenue NE Park and Ride CSAH 24 Bridge Street Begin study of extensive school bus operational issues (interrelated with St. Francis Subarea study)(see Table 7-21) CSAH 51 University Ave Begin planning for expansion of transit (interrelated with Northern Lights Express Commuter Rail planning )(see Table 7-7) ACT, Metro Transit, Shoulder Lane CSAH 52 Radisson Road Implement planned ACT service (interrelated with Northern Lights, TH 65 Transit and East Central Subarea Study) (see Table 7-16) Implement planned ACT service Expand 95th Avenue NE Park and Ride CSAH 78 Hanson Boulevard Begin discussions with transit provider for shoulder bus operation to CSAH 14. Evaluate new route to Riverdale Station. (see Table 7-11) MT, Implement planned ACT route CSAH 116 Bunker Lake Boulevard Consider transit improvements as part of West Central Sub-Area Study roadway improvements including shoulder bus lanes on CSAH 116 for segment used for express service (interrelated with West Central Sub-Area Study ) (see Table 7-10) Metro Transit See also Chapter 3 - Table 3.1, and Figures 3-9 and 3-10 ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN Table 9-1 (Cont.) Short-Term Improvements (2009 – 2015) Functional Classification Changes (see Table 7-25) Roadway Existing Classification Future Classification Comment CSAH 9 Round Lake Boulevard A Minor Arterial Evaluate for need to Change to Principal Arterial Replacement for TH 47 north to CSAH 22 Jurisdictional Changes – County System Turn-Backs to Local Communities (see Table 7-23) Roadway From To Community CSAH 18 Crooked Lake Blvd CSAH 1 CSAH 11/Northdale Blvd Coon Rapids CR 15 217th Ave. CSAH 26 East Bethel CR 16 Andover Blvd CSAH 78 TH 65 Andover, Ham Lake CR 18 CR 59/CR 18 extension CSAH 78 Andover CR 74 Luan Dr. 217th Ave East Bethel CR 105 CSAH 52 CSAH 23 Blaine, Lexington Jurisdictional Changes – Changes Affecting Mn/DOT System (see Table 7-24) Roadway From To Change TH 47 St. Francis Boulevard TH 10 / TH 169, Anoka CSAH 22, Nowthen Mn/DOT turn back to County, to become A Minor Connector TH 65 Hennepin County Line, Columbia Heights I-694, Fridley Mn/DOT turn back to County, to become A Minor Augmenter CSAH 22 Viking Boulevard Sherburne County Line, Nowthen Chisago County Line, Linwood Township Turn up to Mn/DOT, planned change to Principal Arterial ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN Table 9-2 Mid-Term Improvements (2015 – 2020) Corridor/Sub-Area Studies (see Section 7.0, Evaluation Process & Recommendations) Roadway From To Comment CSAH 11 Foley Street CSAH 1 CSAH 12/Northdale Boulevard Address high incident crash locations, access management issues and intersection with CSAH 12/Northdale Boulevard. Roadway Construction/Reconstruction (see Section 7.0, Evaluation Process & Recommendations) Roadway From To Type of Improvement Comment CSAH 1 Coon Rapids Boulevard CSAH 7, Anoka CSAH 3, Coon Rapids Safety/Access Improvements (see Table 7-4) CSAH 1 East River Road CSAH 3, Coon Rapids I-694, Fridley Safety/Access Improvements (see Table 7-5) CSAH 9 Round Lake Boulevard (West Central Sub-Area) CSAH 14/Main Street, Coon Rapids CSAH 20/161st Avenue, Andover Safety/Access Improvements (see Table 7-9) CSAH 10 & CSAH 3 CSAH 1, Coon Rapids County Line, Spring Lake Park Reconstruction Implement corridor study recommendations (4-lane to 6-lane) (see Table 7-6) CSAH 14 Main Street I-35W, Lino Lakes Washington County Line, Lino Lakes New Roadway Construction Northerly Bypass, 4-lane (A Minor Connector) (see Table 7-17) CSAH 17 Lexington Avenue (East Central Sub-Area Study) CSAH 23/Lake Drive, Lexington/Circle Pines CSAH 14/Main Street, Blaine Safety/Access Improvements (see Table 7-14) CSAH 18 Broadway Avenue CSAH 17/Lexington, Columbus CR 19, Columbus Reconstruction Channelized 2-lane (see Table 7-18) CSAH 20 Constance Boulevard West of CR 59, Andover 157th Avenue, Andover New Roadway Construction 2-lanes (A Minor Connector) Removes jog at CSAH 9/Round Lake Boulevard (see Table 7-22) CSAH 22 Viking Boulevard CSAH 85, Linwood County Line, Linwood Reconstruction Channelized 2-lane (see Table 7-19) CSAH 22 Viking Boulevard TH 47, Nowthen CSAH 13/Cedar Drive, Oak Grove Reconstruction Channelized 2-lane (see Table 7-20) CSAH 23 Lake Drive (East Central Sub-Area Study) I-35W, Lexington CSAH 49/Hodgson Road, Lino Lakes Safety/Access Improvements (see Table 7-15) CSAH 23 Lake Drive (East Central Sub-Area Study) Shepard Court, Circle Pines Keith Road, Circle Pines Reconstruction 2-lane to a 4-lane (see Table 7-15) CSAH 24 Bridge Street (St. Francis Sub-Area) TH 47, St. Francis CSAH 9, St. Francis Safety/Access Improvements (see Table 7-21) CSAH 51 University Avenue 113th Avenue, Blaine/Coon Rapids CSAH 14, Blaine/Coon Rapids Reconstruction 2-lane to 4-lane (113th Avenue to CSAH 14) Bridge at Sand Creek (see Table 7-7) CSAH 78 Hanson Boulevard CSAH 22 (current north terminus of CSAH 78), Oak Grove CSAH 13 near 206th Avenue, Oak Grove New Roadway Construction 2-lanes (A Minor Expander) New connection north of CSAH 22, connection to CSAH 13 near 206th Avenue (see Table 7-22) CSAH 116 Bunker Lake Boulevard CSAH 17, Ham Lake CSAH 23, Columbus New Roadway Construction 4-lane (A Minor Reliever) (see Table 7-10) CR 58 Extension of 181st Avenue, Andover/Oak Grove CR 66 and TH 47 intersection, Nowthen New Roadway Construction 2-lane (A Minor Expander) New connection would require a new Rum River bridge crossing (see Table 7-22) CR 68 / CR 61 Southern terminus of CR 68 at CSAH 20 Northern terminus of CR 61 at CR 60 New Roadway Construction 2-lane (B Minor Arterial) (see Table 7-22) Transit Improvements Route/ Roadway Study/Improvement Existing Service Station/ Park and Ride Facility Commuter Rail Complete environmental documentation and preliminary engineering for extension from Big Lake to St. Cloud area (activities outside Anoka County) (see Figures 3-18 and 3-19) Express Bus Service (to be moved to other corridors after implementation of rail service) Monitor station park and ride capacities. Northern Lights Express Commuter Rail Complete Final Design and Construction of new route from St. Louis County to Minneapolis via Coon Rapids juncture with Commuter Rail (see Figures 3-18 and 3-19) (interrelated with TH 65 Light Rail Transit/CSAH 51 corridor) Construct new stations in Andover, Oak Grove, East Bethel I-35W Transit Corridor Complete environmental documentation and preliminary engineering of selected mode. (interrelated with East Central Subarea Study) Shoulder lanes south of CSAH 52 / Radisson Road Central Avenue Light Rail Transit Implement improvements based on planning study (see Figures 3-18 and 3-19) (interrelated with Northern Lights/CSAH 51 studies) Metro Transit, Bus shoulder lane segment (CSAH 10 to TH 10) If Central Ave. corridor selected for additional fixed guideway, construct stations in Blaine, Spring Lake Park, Columbia Heights Rush Line Express Bus Complete preliminary engineering (if fixed guideway is selected) (see Figures 3-18 and 3-19) Rush Line Express Monitor station park and ride capacities. CSAH 1 Coon Rapids Boulevard/ East River Road Complete final design and construction of transit improvements (see Table 7-4) (interrelated with CSAH 1 corridor and startup) Anoka County Traveler (ACT), Metro Transit Monitor park and ride capacities. CSAH 3 / CSAH 10 Implement transit improvements for the planned Port Evergreen in Coon Rapids (see Table 7-6) (interrelated with CSAH 1 corridor study) ACT, Metro Transit CSAH 9 Round Lake Blvd Consider expansion of transit service as CSAH 9 becomes Principal Arterial, consider adding shoulder bus lanes (see Table 7-9) (interrelated with CSAH 116 corridor study) ACT CSAH 11 Foley Boulevard Complete planning study for linkage to stations as well as current Foley Park and Ride (see Table 7-8) (interrelated with startup, Northern Lights Express, CSAH 51/TH 65 studies) Metro Transit Monitor park and ride capacities. CSAH 14 Main Street Northerly Bypass Relocate park and rides in Lino Lakes as part of the CSAH 14 Northerly Bypass construction (see Table 7-17) Relocate park and ride to Lino Lakes CSAH 78 Hanson Boulevard Implement short-term recommendations for shoulder bus lanes and/or new Riverdale Station (see Table 7-11) MT, Implement planned ACT route CSAH 116 Bunker Lake Boulevard Implement short-term recommendations of the West Central Sub-Area Study, and/or shoulder bus lanes (see Table 7-10) Metro Transit See also Table 3.1, and Figures 3-9 and 3-10 Intersection/Interchange Improvements (see Section 6.0, Intersection Decision Process) Road Intersection Improvement I-35W Lake Drive/CR J, Lexington Upgrade Interchange TH 47 CSAH 8, Fridley Grade Separation TH 47 CSAH 6, Fridley Grade Separation TH 65 CSAH 116, Ham Lake New Interchange TH 65 CSAH 10, Blaine Upgrade Interchange TH 65 CSAH 12, Blaine New Interchange CSAH 1 CSAH 6, Fridley Grade Separation CSAH 9 CSAH 116, Andover/Anoka Grade Separation CSAH 51 CSAH 12, Blaine/Coon Rapids Grade Separation Intersection Signal Installations (see Section 6.0, Intersection Decision Process) Road Intersection Warrant Probability CSAH 5 CR 163, Nowthen High CSAH 5 CR 57, Ramsey Moderate CSAH 7 CR 58, Andover Moderate CSAH 9 168th Avenue, Andover Moderate CSAH 14 CR 53, Blaine/Lino Lakes High CSAH 17 CR 60, Ham Lake High CSAH 17 CSAH 116, Ham Lake High CSAH 18 CSAH 17 (South), Ham Lake High CSAH 18 CSAH 17 (North), Ham Lake High CSAH 22 TH 47, Nowthen High CSAH 22 CR 163, Nowthen High CSAH 22 CSAH 85, Linwood High CSAH 22 CSAH 7, Oak Grove High CSAH 24 CSAH 26, East Bethel Moderate CSAH 24 CR 103, Oak Grove/St. Francis Moderate CSAH 58 CSAH 78, Andover High CSAH 58 CR 67, Andover High CSAH 83 161st Avenue, Ramsey Moderate CSAH 116 CSAH/CR 52, Ham Lake High CR 53 CR 49, Circle Pines/Blaine/Lino Lakes Moderate CR 57 Alpine Drive, Ramsey Moderate ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN Table 9-2 (Cont.) Mid-Term Improvements (2015 – 2020) Functional Classification Changes (see Table 7-25) Roadway Existing Classification Future Classification Comment CSAH 22 Viking Boulevard (CSAH 83 to Chisago County line) A Minor Arterial Evaluate for need to change to Principal Arterial Planned turn-up to Mn/DOT to become trunk highway Jurisdictional Changes – County System Turn-Backs to Local Communities (see Table 7-23) Roadway From To Community CSAH 6 CSAH 35/Old Central Avenue Ramsey County line Fridley CSAH 8 CSAH 35/Old Central Avenue Ramsey County line Fridley CSAH 20 CSAH 9 CR 59 Andover CR 27 TH 47 CSAH 7 Ramsey CR 58 Valley Drive CSAH 7 CR 58/181st Avenue Andover CR 58 Valley Drive CSAH 51 extension Intersection of CR 58/CR 67 Andover CR 87 TH 65 CR 52 Blaine CR 153 CR 53 CSAH 23/Lake Drive Lino Lakes CR 158 CSAH 7 CR 58/Valley Drive Andover ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN Table 9-3 Long-Term Improvements (2020 – 2030) Corridor/Sub-Area Studies: NONE Roadway From To Comment Roadway Construction/Reconstruction Roadway From To Type of Improvement Comment CSAH 1 Coon Rapids Blvd CSAH 7, Anoka CSAH 78, Coon Rapids Reconstruction Reconstruct based on corridor study recommendations (4-lane to 6-lane assumed) (see Table 7-4) CSAH 1 East River Road CSAH 3, Coon Rapids I-694, Fridley Reconstruction Reconstruct based on corridor study recommendations (4-lane to 6-lane assumed) (see Table 7-5) CSAH 9 Round Lake Boulevard (West Central Sub-Area Study) CSAH 116, Andover CSAH 20, Andover Reconstruction 4-lane to 6-lane (see Table 7-9) CSAH 11 Foley St CSAH 1 / East River Road, Coon Rapids CSAH 12, Coon Rapids Reconstruction Reconstruct based on corridor study recommendations (2-lane to 4-lane assumed) (see Table 7-8) CSAH 14 Main Street I-35E, Centerville CSAH 23, Lino Lakes Safety/Access Improvements (see Table 7-15) CSAH 17 Lexington Avenue (East Central Sub-Area) I-35W, Blaine CSAH 14 / Main Street, Blaine Reconstruction 4-lane to 6-lane (see Table 7-14) CSAH 18 / CSAH 58 Crosstown Blvd, Ham Lake 181st Ave, Andover New Roadway Construction 2-lane (Major Collector), Removes jog between CSAH 18 and CSAH 58 / 181st Avenue (see Table 7-22) CSAH 24 Bridge Street (St. Francis Sub-Area) TH 47, St. Francis CR 9, St. Francis Reconstruction 2-lane to 4-lane New River Bridge (see Table 7-21) CSAH 26 / CSAH 13 CSAH 26/229th Avenue, East Bethel CSAH 13 / University Avenue, East Bethel New Roadway Construction 2-lane (A Minor Connector), extension of CSAH 26 east/west with new crossing of TH 65 (see Table 7-22) CSAH 51 University Avenue CSAH 14, Blaine/Coon Rapids CSAH 13, East Bethel/Oak Grove New Roadway Construction 2-lane (CSAH 14 to CSAH 116 = A Minor Reliever, CSAH 116 to CSAH 22 = A Minor Expander, CSAH 22 to CSAH 13 = A Minor Connector) New roadway extension of CSAH 51/University Avenue (see Table 7- 7) CSAH 52 Radisson Road CSAH 116, Ham Lake CR 61, Ham Lake Reconstruction 2-lane to 4-lane (see Table 7-16) CSAH 78 Hanson Boulevard TH 116, Andover CSAH 20 / Constance Boulevard, Andover Reconstruction 4-lane to 4-lane divided (see Table 7-11) CSAH 83 Boulevard US 10, Ramsey 161st Avenue, Ramsey Reconstruction 2-lane to 4-lane (see Table 7-13) CR 52 / CR 61 153rd Avenue, Ham Lake Constance Blvd, Ham Lake New Roadway Construction 2-lane (B Minor), new connection to eliminate jog between CR 52 and CR 61 north of 153rd Avenue (see Table 7-22) CR 53 Sunset (East Central Sub-Area) CR 49, Lino Lakes CSAH 14/Main Street, Blaine Reconstruction 2-lane to channelized (see Table 7-14) CR 53 Sunset (East Central Sub-Area) CSAH 14, Lino Lakes/Blaine CSAH 18, Columbus/Ham Lake New Roadway Construction 2-lane (A Minor Expander), extension of CR 53, new parallel road to CSAH 17/Lexington Avenue (see Table 7-14) CR 68 / CR 15 CR 68/CR 15 at CSAH 22, East Bethel See comment. New Roadway Construction 2-lane (Major Collector), Removes jog between Waconia St (on CR 68) and 196th (on CR 15) (see Table 7-22) CR 70 / CR 24 219th Avenue, St. Francis Hill and Dale Drive, St. Francis New Roadway Construction 2-lane (B Minor), new north/south connection of CR 70 and CR 24, east of Burns Lake (see Table 7-22) CR 70 CR 70/223rd Avenue, St. Francis Sherburne/Isanti County Line, St. Francis New Roadway Construction 2-lane (B Minor), new north/south road along county line (see Table 7-22) CR 84 CSAH 14, Centerville CSAH 23/Lake Drive, Centerville New Roadway Construction 2-lane (A Minor Reliever), I-35E parallel road with Washington County (see Table 7-22) CR 105 Naples (East Central Sub-Area) CSAH 23/Lake Street, Lexington CSAH 12/ 109th Avenue, Blaine Reconstruction 2-lane to channelized (see Table 7-14) CR 105 Naples (East Central Sub-Area) Existing terminus at CSAH 12, Blaine CR 60/Constance Boulevard, Ham Lake New Roadway Construction 2-lane (A Minor Expander), extension of CR 105, new parallel road to CSAH 17/Lexington Avenue (see Table 7-14) Transit Improvements Route/ Roadway Planning Existing Service Station/Park and Ride Facility Commuter Rail Construction from Big Lake (activities outside of Anoka County), consider additional runs to expand service within Anoka County, depending on ridership (see Figures 3-18 and 3-19) Monitor station park and ride capacities within Anoka County. Northern Lights Express Commuter Rail Consider additional runs to expand service within Anoka County, depending on ridership (see Figures 3-18 and 3-19) I-35W Transit Corridor Final design and construction of selected mode (interrelated with East Central Subarea Study) (see Figures 3-18 and 3-19) Shoulder lanes south of 95th Ave. Monitor park and ride capacities within Anoka County. Central Avenue Light Rail Transit Implement improvements based on planning study (interrelated with Northern Lights/CSAH 51 studies) Consider additional runs to expand service within Anoka County, depending on ridership (see Figures 3-18 and 3-19) Metro Transit, Bus shoulder lane segment (CSAH 10 to US 10) Rush Line Express Bus Final design and construction (mode to be determined) (see Figures 3-18 and 3-19) Rush Line Express Monitor station park and ride capacities within Anoka County. CSAH 9 Round Lake Boulevard Implement recommendations from mid-term planning activities (see Table 7-9) ACT Monitor park and ride capacities. CSAH 11 Foley Boulevard Implement recommendations from mid-term planning activities (interrelated with startup, Northern Lights Express, CSAH 51/TH 65 studies) (see Table 7-8) Metro Transit Monitor park and ride capacities. CSAH 17 Lexington Avenue (interrelated with I-35W recommendations) (see Table 7-14) Metro Transit, Implement planned ACT route Monitor park and ride capacities. CSAH 23 Lake Drive (interrelated with I-35W recommendations) (see Table 7-15) Implement planned ACT route Monitor park and ride capacities. CSAH 24 Bridge Street Complete improvements recommended in the St. Francis Sub-Area study (see Table 7-21) Monitor park and ride capacities. CSAH 51 University Avenue (interrelated with Northern Lights Express Commuter Rail) (see Table 7-7) ACT, Metro Transit Monitor park and ride capacities. CSAH 52 Radisson Road (Interrelated with Northern Lights and TH 65 Transit) (see Table 7-16) Implement planned ACT service Monitor park and ride capacities. See also Table 3.1, and Figures 3-9 and 3-10 Intersection/Interchange Improvements (see Section 6.0, Intersection Decision Process) Road Intersection Improvement I-35 CSAH 23/Lake Drive Upgrade/New Interchange TH 65 CSAH 22/Viking Grade Separation TH 65 CSAH 18/Crosstown Grade Separation TH 65 CR 60/Constance Grade Separation TH 65 CR 16/ Andover Grade Separation TH 65 CSAH 8/Osborne Grade Separation US 10 CSAH 7/7th Avenue, Anoka Upgrade/New Interchange CSAH 23 CSAH 17/Lexington Grade Separation CSAH 78 Hanson Blvd CSAH 116/Bunker Lake Blvd Grade Separation CSAH 78 Hanson Blvd CSAH 14/Main Street Grade Separation Intersection Signal Installations (see Section 6.0, Intersection Decision Process) Road Intersection Warrant Probability CR 52 Cloud Dr Moderate CR 52 Tournament Players Pkwy Moderate CR 53 105th/Gladstone Moderate CR 53 CR 153 Moderate CSAH 5 CR 63 (North) High CSAH 5 CR 63 (South) Moderate CSAH 12 CR 53 Moderate CSAH 14 4th Ave Moderate CSAH 14 Rondeau Lake Rd Moderate CSAH 22 CR 67 (North) High CSAH 22 CSAH 78 High CSAH 22 CR 67 (South) High CSAH 22 CR 15 Moderate CSAH 22 CR 74 Moderate CSAH 22 CSAH 17 Moderate CSAH 22 CR 68 Moderate CSAH 23 CR 19 Moderate CSAH 56 Alpine Dr Moderate CSAH 56 CSAH 5 Moderate CSAH 56 167th Ave Moderate CSAH 78 CSAH 20 Moderate ---PAGE BREAK--- ANOKA COUNTY 2030 TRANSPORTATION PLAN Table 9-3 (Cont.) Long-Term Improvements (2020 – 2030) Functional Classification Changes (see Table 7-25) Roadway Existing Classification Future Classification Comment CR 105 Naples Street (north of I-35W, extend to CSAH 12 ) Local Street Major Collector A component of Lexington corridor improvements Jurisdictional Changes – County System Turn-Backs to Local Communities (see Table 7-23) Roadway From To Community CSAH 1 CSAH 14 CSAH 7 Anoka CSAH 5 CR 57 TH 47 Ramsey CSAH 11 CSAH 18 CSAH 78 Coon Rapids CSAH 12 At CR 53 Blaine, Lino Lakes CSAH 13 t-extension with Viking Blvd New proposed extension of CSAH 78 Oak Grove CSAH 14 CSAH 31 CSAH 7 Anoka CSAH 26 CSAH 26/229th Ave CSAH 24 East Bethel CSAH 30 CSAH 7 TH 47 Anoka CSAH 31 North extension to hospital CSAH 14 Anoka CSAH 31 CSAH 7 CSAH 31 south extension Anoka CSAH 67 CR 58 CSAH 22 Oak Grove CSAH 131 North extension to hospital CSAH 31 Anoka CR 53 At CSAH 23 Lino Lakes CR 61 TH 65 East Ham Lake Dr. Ham Lake CR 63 CSAH 5 TH 47 Ramsey CR 65 CSAH 22 CSAH 5 Nowthen CR 70 Sherburne County line CSAH 28 Nowthen, St. Francis CR 79 CSAH 7 CSAH 9 Anoka, Coon Rapids CR 81 CSAH 28 TH 47 St. Francis CR 82 Sherburne County line CR 65 Nowthen CR 83 US 10 CSAH 116 Ramsey CR 86 CSAH 13 TH 65 East Bethel, Oak Grove CR 89 CSAH 24 CR 70 Nowthen CR 105 CSAH 52 CSAH 23 Blaine, Lexington CR 163 CSAH 22 CSAH 5 Nowthen