Full Text
Appendices The Platinum Triangle Subsequent EIR The Planning Center Appendix J: Traffic Study ---PAGE BREAK--- Appendices The Platinum Triangle Subsequent EIR The Planning Center This page intentionally left blank. ---PAGE BREAK--- TRAFFIC STUDY FOR THE PLATINUM TRIANGLE MASTER LAND USE PLAN EIR Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. Prepared for: City of Anaheim April 5, 2005 ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 2 1.0 INTRODUCTION This report presents the traffic impact analysis associated with the following actions (herein after referred to as the “proposed project”) associated with The Platinum Triangle Master Land Use Plan: Implementation of the adopted Platinum Triangle Master Land Use Plan, the Platinum Triangle Mixed Use (PTMU) Overlay Zone, The Platinum Triangle Standardized Development Agreement and the Updated and Modified Mitigation Monitoring Program No. 106 for The Platinum Triangle. Implementation is intended to include, but not be limited to, the approval of subdivision maps, grading permits, street improvement plans, final site plans, development agreements and other related actions for properties located within The Platinum Triangle. General Plan Amendment No. 2004-00420 – A request to amend the City of Anaheim General Plan Land Use Element to redesignate a 3.21-acre property located at 2400 E. Orangewood Avenue (“Fire Training Site”) from the Office-High to the Mixed-Use land use designation. The General Plan is also proposed to be amended to provide for an additional 325 dwelling units and up to 210,100 square feet of additional commercial square footage in The Platinum Triangle Mixed-Use land use designation. Zoning Reclassification No. 2004-00134 – A request to reclassify the Fire Training Site from the PR (Public Recreational) Zone to the PR (PTMU) (Public Recreation - Platinum Triangle Mixed Use Overlay) Zone. Zoning Code Amendment No. 2004-00036 and an amendment to The Platinum Triangle Master Land Use Plan (Miscellaneous Case No. 2004-00089) – A request to amend the PTMU Overlay Zone and the Master Land Use Plan to adjust the boundaries of the mixed-use districts to include the Fire Training Site in the PTMU Overlay Zone Gateway District and add 325 units to said district (321 of said units would be designated for the Fire Training Site). The amendment to the Overlay Zone and the Master Land Use Plan would also include modifying the PTMU Overlay Zone commercial density to add 210,100 square feet of additional commercial square footage. Of this square footage, 190,100 square feet would be designated for future required ground floor commercial uses on Market Street and Gene Autry Way in the Katella and Gene Autry Districts and 20,000 square feet for other commercial uses in the Katella District. In conjunction with these amendments, additional technical refinements and clarifications are also proposed to the Master Land Use Plan and Overlay Zone, including, but not limited to refinements to street cross-sections and density descriptions to reflect the above-noted changes and other City Code requirements. In this traffic study, four different scenarios were analyzed. They are as follows: ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 3 1. Existing Conditions 2. Buildout of the adopted Platinum Triangle Master Land Use Plan (“Adopted MLUP”) with Existing Lane Geometrics 3. Buildout of The Platinum Triangle Master Land Use Plan in accordance with the proposed project (“Proposed MLUP”) with Existing Lane Geometrics 4. Buildout of The Platinum Triangle Master Land Use Plan in accordance with the proposed project (“Proposed MLUP”) with Planned Circulation Improvements The Adopted MLUP represents build out of The Platinum Triangle in accordance with the land use intensities indicated in the General Plan. Proposed MLUP represents build out of The Platinum Triangle in accordance with the proposed project. Existing Lane Geometrics represents those street improvements currently in place as of March 2005. Planned Circulation Improvements represents those street improvements as indicated by the General Plan, The Platinum Triangle Master Land Use Plan and associated documents. 2.0 METHODOLOGY The methodology adopted for this study involved the application of the Anaheim Traffic Analysis Model (ATAM) to forecast AM and PM peak hour traffic at the intersections in The Platinum Triangle with full build out of The Platinum Triangle MLUP. ATAM is the traffic forecasting modeling tool for the City of Anaheim, and has been found consistent with the Orange County Transportation Analysis Model (OCTAM) developed by the Orange County Transportation Authority. For modeling purposes, the General Plan land use assumptions in The Platinum Triangle were reviewed and updated to be consistent with site plan proposals currently under review by the City and expectations about the geographic distribution of development within each district. City staff provided direction on the appropriate allocation of future development in each of the model’s traffic analysis zones (TAZ). The Adopted MLUP scenario reflects the General Plan level of development including this reallocation of land use among TAZs in each district. Figure 2.1 presents The Platinum Triangle Districts identifying the boundaries of Adopted MLUP. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 4 Figure 2.1: The Platinum Triangle Districts Source: City of Anaheim ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 5 City staff also provided land use allocation by TAZ for the proposed additional residential and commercial development. For each future land use scenario, mixed use trip reduction was calculated for each district in The Platinum Triangle using the Institute of Transportation Engineers methodology. The amount of residential, commercial, and office development in each district determined the percentage reduction of trips. Because the Fire Training Site is spatially separate from the rest of the Gateway District, the mixed use trip reduction was calculated separately for that site. Table 2.1 presents the percent internal capture computed for Adopted MLUP and Proposed MLUP by each district. Table 2.1: Mixed-Use Trip Reduction Plan by District Platinum Triangle Districts Percent Internal Capture for Adopted MLUP Percent Internal Capture for Proposed MLUP Katella District 15.2 % 16.5% Gene Autry District 9.0% 17.9% Gateway District 5.9% 5.5% Stadium District 13.9% 13.9% Arena District 19.9% 19.9% Fire Training Site NA 4.5% NA – Not Applicable The future traffic forecasts were used to estimate future levels of service (LOS) during morning and afternoon peak hours at 29 study intersections in the area – 24 intersections in Anaheim and five in the City of Orange (identified by the City of Orange for inclusion in this traffic analysis pursuant to a letter submitted to City of Anaheim dated February 8, 2005). The Proposed MLUP LOS results were compared with the LOS results from the Adopted MLUP to identify significant adverse impacts of the Proposed MLUP and to identify future lane requirements at the study intersections in the City of Anaheim to achieve a peak hour LOS at intersections, in accordance with the City’s adopted LOS standard. The threshold of significance for traffic impacts is a peak hour LOS worse than with an increase in the Intersection Capacity Utilization ratio of at least 0.02. When the Proposed MLUP condition is compared with the Adopted MLUP, mitigation will be required for any intersection which increases the peak hour ICU by at least 0.02 and is projected to operate at LOS E or F. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 6 3.0 EXISTING CONDITIONS For traffic modeling purposes, development is quantified by land use category in traffic analysis zones (TAZ) throughout the City. Figure 3.1 shows the TAZ numbers and boundaries for The Platinum Triangle. Table 3.1 quantifies the existing land use in The Platinum Triangle by TAZ. In addition to Angel Stadium of Anaheim and Arrowhead Pond of Anaheim, existing land use is largely industrial in nature, with no residential development. There are currently zero dwelling units in the area, approximately 3,827 thousand square feet (TSF) of industrial development, 203 TSF of commercial development, and 1,558 TSF of office space. The existing mid-block number of lanes on the streets in The Platinum Triangle is shown in Figure 3.2, and the existing intersection lane geometry is summarized in Table 3.2. Existing daily trip generation in the project area is summarized in Table 3.3. Currently, development in the project area generates a total of approximately 95,000 daily trips. Existing average daily traffic volumes on the streets in The Platinum Triangle are shown in Figure 3.3. Peak traffic conditions are evaluated based on the peak hour levels of service at the study intersections. Existing LOS at the study intersections is summarized in Table 3.4, and the ICU calculation worksheets are included in Appendix A. Currently, most of the intersections operate at an acceptable LOS in both the peak hours. The only exception is intersection of Santiago Boulevard and Meats Avenue located in the City of Orange, which operates at LOS E in the morning peak hour. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 7 Figure 3.1: Traffic Analysis Zones in The Platinum Triangle ORANGE ANAHEIM Source: Parsons Brinckerhoff Quade & Douglas, Inc. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 8 Table 3.1: Existing Land Use ATAM TAZs in PLATINUM TRIANGLE Resid Mixed Use 15+ DU/ac Community Commercial Neighborhood Commercial Regional Commercial Professional Office General Industrial Hotel/Motel Post Office Church/Community Center Arrowhead Pond of Anaheim Angel Stadium of Anaheim Units DU TSF TSF TSF TSF TSF Rooms TSF TSF Acres Acres 256 0 47 0 0 0 208 0 0 0 0 0 257 0 0 0 0 0 295 0 0 0 0 0 258 0 0 0 0 32 90 0 0 0 0 0 262 0 0 8 0 0 40 0 0 0 0 0 306 0 0 0 0 265 0 0 0 1 0 0 307 0 0 0 0 0 210 0 0 0 0 0 308 0 0 0 0 0 377 0 0 0 0 0 309 0 36 0 0 20 251 240 0 0 0 0 310 0 7 0 0 0 395 133 0 0 0 0 311 0 0 0 0 0 197 0 4 0 0 0 312 0 0 0 0 0 197 0 0 0 0 0 313 0 0 5 0 0 500 0 0 0 0 0 314 0 0 0 0 0 36 0 0 0 0 0 339 0 0 0 0 0 288 0 0 0 0 0 340 0 62 0 0 105 0 140 0 0 0 0 341 0 0 6 0 0 67 0 0 0 0 0 342 0 0 0 0 107 273 0 0 0 0 0 343 0 0 8 0 239 0 0 0 0 0 0 344 0 0 2 0 271 0 0 0 0 0 0 345 0 0 0 0 0 0 0 0 39 0 0 346 0 0 0 0 0 0 0 0 0 0 36 347 0 0 0 0 0 87 0 0 0 0 0 348 0 0 1 0 7 224 0 0 0 0 0 349 0 0 0 0 128 0 0 0 0 0 0 350 0 0 0 0 0 0 0 0 0 0 0 351 0 0 0 0 0 0 0 0 0 0 0 352 0 0 0 0 383 0 0 0 0 0 0 353 0 0 0 0 0 0 0 0 0 32 0 354 0 0 0 0 0 37 134 0 0 0 0 355 0 21 0 0 0 56 0 0 0 0 0 Total Land Use 0 173 30 0 1,558 3,827 647 4 39 32 36 Shaded Cells Represent Mixed-Use District TAZs ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 9 Figure 3.2: Existing Mid-Block Number of Lanes on Streets in Project Area * Map Not to Scale ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 10 Table 3.2: Existing Intersection Lane Geometry L T R L T R L T R L T R 121 Anaheim / I-5 NB Ramp 2 3 0 0 3 1 0 0 0 0.5 1 1.5 122 Anaheim / Disney 1 3 0 2 3 0 2 4 0 0 3 0 125 Manchester I-5 SB/ Katella 1 0 2 2 2 1 0 3 1 2 3 0 126 Anaheim Way / Katella 2 2 1 0 0 0 2 3 0 0 3 2 143 Lewis / Katella 1 1 0 1 1 1 1 4 0 1 3 0 144 Manchester / Orangewood 0 0 0 2 3 0 0 3 1 2 3 0 145 Anaheim Way/ Orangewood 1 2 0 0 0 0 2 3 0 0 3 1 160 State College / Katella 2 3 0 2 3 0 2 3 1 2 3 1 161 State College / Sportstown 0 3 0 2 3 0 0 0 0 1 0 1 162 State College / Gene Autry 2 3 0 2 3 0 1 2 0 2 1 0 163 State College / Orangewood 2 4 0 2 4 0 2 3 0 2 3 0 170 Howell / Katella 1 1 1 2 1 0 1 3 0 2 3 0 171 Sportstown / Katella 1 0.5 1.5 1 1 1 1 3 0 1 3 1 172 Rampart / Orangewood 1 1 1 1 1 1 1 2 0 1 2 1 177 SR-57 SB Ramps / Katella 0 0 0 1 0 2 0 3 F 0 3 F 178 SR-57 NB Ramps / Katella 1.5 0 1.5 0 0 0 0 3 F 0 3 F 179 SR-57 SB Ramps / Orangewood 0 0 0 1 0 2 0 2 1 1 2 0 180 SR-57 NB Ramps / Orangewood 1 0 2 0 0 0 0 2 2 0 2 F 183 Douglass / Katella 0.5 1.5 0 1 0.5 1.5 2 3 1 2 4 0 257 Market / Katella - - - - - - - 4 - - 4 - 258 Gene Autry / Market - - - - - - - 2 - - 2 - 259 State College / Connector - 3 - - 3 - - - - - - - 261 Orangewood / - - - - - - - 2 - - 2 - 262 State College / - 3 - - 3 - - - - - - - 301 Main / Katella 2 2 1 1 2 1 1 3 1 1 3 0 302 Eckhoff / Orangewood 1 1 0 1 1 1 1 2 1 1 2 0 303 The City Drive / Chapman 2 4 1 2 3 1 2 3 1 2 3 1 304 Santiago / Meats 1 2 0 1 2 0 1 2 0 1 2 0 305 Chapman / Rampart - - - 1 0 1 1 3 0 0 3 1 F = Free Turn Eastbound Westbound Intersection ID Intersection Northbound Southbound ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 11 Table 3.3: Daily Trip Generation for Existing Conditions TAZ Total Trips 256 4,845 257 3,938 258 1,776 262 889 306 2,804 307 5,032 308 6,715 309 6,357 310 2,717 311 2,635 312 6,909 313 481 314 7,276 339 3,842 340 5,441 341 1,144 342 5,563 343 4,646 344 4,937 345 39 346 238 347 1,168 348 3,174 349 2,295 350 0 351 0 352 6,863 353 346 354 1,268 355 1,686 TOTAL 95,025 ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 12 Figure 3.3: Average Daily Traffic in Existing Conditions (in Thousands) * Map Not to Scale ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 13 Table 3.4: Existing Level-of-Service at Study Intersections AM Peak Hour PM Peak Hour Intersection V/C LOS V/C LOS Anaheim / I-5 NB Ramp 0.39 A 0.56 A Anaheim / Disney 0.38 A 0.39 A Manchester I-5 SB/ Katella 0.52 A 0.66 B Anaheim Way / Katella 0.39 A 0.45 A Lewis / Katella 0.43 A 0.66 B Manchester / Orangewood 0.49 A 0.33 A Anaheim Way/ Orangewood 0.28 A 0.42 A State College / Katella 0.58 A 0.61 B State College / Sportstown 0.29 A 0.30 A State College / Gene Autry 0.35 A 0.37 A State College / Orangewood 0.44 A 0.51 A Howell / Katella 0.41 A 0.67 B Sportstown / Katella 0.32 A 0.50 A Rampart / Orangewood 0.47 A 0.45 A SR-57 SB Ramps / Katella 0.40 A 0.51 A SR-57 NB Ramps / Katella 0.43 A 0.58 A SR-57 SB Ramps / Orangewood 0.61 B 0.71 C SR-57 NB Ramps / Orangewood 0.50 A 0.48 A Douglass / Katella 0.41 A 0.57 A Market / Katella na na na na Gene Autry / Market na na na na State College / Connector na na na na Orangewood / na na na na State College / na na na na Main / Katella 0.52 A 0.64 B Eckhoff / Orangewood 0.56 A 0.72 C City Drive / Chapman 0.55 A 0.83 D Santiago / Meats 0.93 E 0.75 C Chapman / Rampart 0.38 A 0.58 A na – Not Applicable ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 14 4.0 ADOPTED MLUP This scenario represents buildout of the City’s General Plan, including planned land uses within The Platinum Triangle. Planned land uses within each TAZ in the area are summarized in Table 4.1. The long-range vision for this area includes a major transition from industrial uses to mixed-use residential, commercial, and office development. The General Plan includes mixed use development in The Platinum Triangle comprising a total of 9,175 dwelling units, 2,044 TSF of commercial development, and 3,265 TSF of office. For this scenario, the existing lane configurations were used to analyze the impact of adopted General Plan land use traffic; so the assumed lane configurations at each of the study intersections are the same as summarized in Table 3.2. Projected future daily trip generation in the study area for the Adopted MLUP is summarized in Table 4.2. Adopted MLUP development intensity in the study area is projected to generate a total of approximately 260,000 daily trips, 173.6 percent more than existing development. Projected daily traffic volumes on the streets in The Platinum Triangle attributable to buildout of the General Plan are shown on Figure 4.1. Future LOS at the study intersections with existing lane configurations is summarized in Table 4.3, and the ICU calculation worksheets are included in Appendix B. With this scenario, nine of the 29 study intersections are projected to operate at an unacceptable level of service in at least one peak hour. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 15 Table 4.1: Adopted MLUP ATAM TAZs in PLATINUM TRIANGLE Resid Mixed Use 15+ DU/ac Office Mixed Use Commercial Mixed Use Regional Commercial Professional Office General Industrial Tourism/entertainment Open Space Arrowhead Pond of Anaheim Angel Stadium of Anaheim General Inst Units DU TSF TSF TSF TSF TSF TSF TSF Acres Acres TSF 256 0 0 0 80 0 140 134 0 0 0 5 257 0 0 0 0 0 145 0 1 0 0 0 258 0 0 0 0 62 24 0 1 0 0 48 262 0 0 0 0 66 0 0 1 0 0 0 306 0 0 0 0 0 265 0 1 0 0 0 307 0 0 0 0 309 0 0 1 0 0 0 308 1,750 40 100 0 124 0 0 0 0 0 0 309 1,800 40 131 0 102 0 0 0 0 0 0 310 0 0 0 0 145 0 0 0 0 0 0 311 500 50 25 0 0 0 0 0 0 0 0 312 500 50 25 0 76 0 0 0 0 0 0 313 0 0 0 0 73 0 0 5 0 0 0 314 400 173 16 0 20 0 0 0 0 0 0 339 0 0 0 0 0 437 0 4 0 0 0 340 0 105 198 0 0 0 0 0 0 0 0 341 0 0 0 0 154 0 0 0 0 0 0 342 0 0 0 0 29 0 0 1 0 0 0 343 0 510 40 0 0 0 0 0 0 0 0 344 400 285 233 0 0 0 0 0 0 0 0 345 550 35 46 0 0 0 0 0 0 0 0 346 1,350 1,475 1,067 0 0 0 0 0 0 72 0 347 850 184 18 0 0 0 0 0 0 0 0 348 500 173 16 0 165 0 0 0 0 0 0 349 0 0 0 0 165 0 0 0 0 0 0 350 0 0 0 0 0 0 0 0 0 0 38 351 70 15 16 0 58 0 0 0 0 0 0 352 0 0 0 0 188 0 1 1 0 0 0 353 355 85 84 0 67 0 0 0 32 0 0 354 150 35 21 0 41 0 0 0 0 0 1 355 0 10 8 0 15 0 0 0 0 0 215 Total Land Use 9,175 3,265 2,044 80 1,857 1,011 135 14 32 72 307 Shaded Cells Represent Mixed-Use District TAZs ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 16 Table 4.2: Daily Trip Generation for Adopted MLUP TAZ Total Trips 256 8,019 257 1,931 258 2,062 262 1,182 306 3,545 307 5,530 308 15,988 309 19,605 310 2,602 311 4,924 312 6,289 313 1,302 314 6,945 339 5,832 340 14,891 341 2,760 342 513 343 8,318 344 13,587 345 8,029 346 82,243 347 7,556 348 10,062 349 2,955 350 491 351 2,379 352 3,377 353 8,911 354 3,943 355 4,175 TOTAL 259,946 ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 17 Figure 4.1: Future Average Daily Traffic for Adopted MLUP (in Thousands) * Map Not to Scale; Future Streets are Conceptual ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 18 Table 4.3: Level-of-Service for Adopted MLUP with Existing Lane Configurations AM Peak Hour PM Peak Hour Intersection V/C LOS V/C LOS Anaheim / I-5 NB Ramp 0.58 A 0.89 D Anaheim / Disney 0.36 A 0.48 A Manchester I-5 SB/ Katella 1.06 F 0.92 E Anaheim Way / Katella 0.61 B 0.73 C Lewis / Katella 0.63 B 0.86 D Manchester / Orangewood 0.66 B 0.40 A Anaheim Way/ Orangewood 0.45 A 0.57 A State College / Katella 0.91 E 0.99 E State College / Sportstown 0.66 B 0.66 B State College / Gene Autry 0.68 B 0.86 D State College / Orangewood 0.75 C 0.93 E Howell / Katella 0.64 B 1.13 F Sportstown / Katella 0.96 E 1.36 F Rampart / Orangewood 0.79 C 1.05 F SR-57 SB Ramps / Katella 0.69 B 0.70 B SR-57 NB Ramps / Katella 0.52 A 0.62 B SR-57 SB Ramps / Orangewood 0.70 B 0.78 C SR-57 NB Ramps / Orangewood 0.53 A 0.52 A Douglass / Katella 0.84 D 1.33 F Market / Katella 0.62 B 0.71 C Gene Autry / Market 0.25 A 0.42 A State College / Connector 0.46 A 0.47 A Orangewood / 0.39 A 0.56 A State College / 0.54 A 0.51 A Main / Katella 0.56 A 0.76 C Eckhoff / Orangewood 0.59 A 0.82 D City Drive / Chapman 0.62 B 0.73 C Santiago / Meats 0.88 D 0.99 E Chapman / Rampart 0.82 D 0.98 E ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 19 5.0 PROPOSED MLUP The Proposed MLUP includes additional residential units and commercial square footage in The Platinum Triangle compared to the adopted General Plan. The additional commercial square footage is distributed as shown below: 20,000 sq ft in the Katella District east of State College Boulevard 22,050 sq ft in the Gene Autry District south of Gene Autry Way 66,000 sq ft in the Katella District at Market Street 80,000 sq ft in the Gene Autry District at Market Street 22,050 sq ft in the Gene Autry District north of Gene Autry Way Total planned development under the Proposed MLUP is shown in Table 5.1. For this scenario, the traffic impact of proposed land use was analyzed for two conditions: Existing Lane Configurations; and Planned Circulation Improvements The existing lane configurations at each of the study intersections are the same as summarized in Table 3.2. The planned circulation improvements for future mid-block and intersection lane geometry are shown in Figure 5.1 and Table 5.2. Projected future daily trip generation in the study area for the Proposed MLUP is summarized in Table 5.3. Daily trip generation for the Proposed MLUP is projected to be approximately 270,000 daily trips, an increase of 10,000 trips (3.8 percent) over the Adopted MLUP. Projected future daily traffic volumes with the Proposed MLUP are shown in Figure 5.2. The volumes are fairly consistent with the Adopted MLUP daily traffic forecasts; the largest differences are volume increases of 2,000-3,000 vehicles per day on Katella Avenue and State College Boulevard. LOS at the study intersections for the Proposed MLUP under existing lane configurations is summarized in Table 5.4, and the ICU calculation worksheets are included in Appendix C. The table also shows the change in v/c compared to the Adopted MLUP land uses. With existing lane geometry, the same nine intersections operate at LOS E or F in at least one peak hour with the Proposed MLUP land uses. Of these, the following four represent significant adverse traffic impacts because the v/c increase is .02 or greater: Manchester I-5 SB at Katella State College at Orangewood Howell at Katella Sportstown at Katella ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 20 LOS at the study intersections for the Proposed MLUP under the planned circulation improvements is summarized in Table 5.5, and the ICU calculation worksheets are included in Appendix D. With the planned circulation improvements, all study intersections are projected to operate at LOS D or better in the AM peak hour, and all but one are projected to operate at LOS D or better in the PM peak hour. In many cases, the planned lane geometry is more than adequate to accommodate normal peak hour volumes. The additional lane capacity, in combination with the traffic management strategies implemented for events at the Angel Stadium of Anaheim and the Arrowhead Pond of Anaheim Pond, provide the ability for the street system to carry the additional peak hour traffic associated with an event at either venue. The intersection projected to operate at LOS E in the PM peak with the planned circulation improvements is Santiago at Meats. Since the v/c increase at Santiago at Meats is 0.01, the intersection would not experience a significant adverse traffic impact, so mitigation is not required. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 21 Table 5.1: Proposed MLUP ATAM TAZs in PLATINUM TRIANGLE Resid Mixed Use 15+ DU/ac Office Mixed Use Commercial Mixed Use Regional Commercial Professional Office General Industrial Tourism/entertainment Open Space Arrowhead Pond of Anaheim Angel Stadium of Anaheim General Inst Units DU TSF TSF TSF TSF TSF TSF TSF Acres Acres TSF 256 0 0 0 80 0 140 134 0 0 0 5 257 0 0 0 0 0 145 0 1 0 0 0 258 0 0 0 0 62 24 0 1 0 0 48 262 0 0 0 0 66 0 0 1 0 0 0 306 0 0 0 0 0 265 0 1 0 0 0 307 0 0 0 0 309 0 0 1 0 0 0 308 1,750 40 100 0 124 0 0 0 0 0 0 309 1,800 40 197 0 102 0 0 0 0 0 0 310 0 0 0 0 145 0 0 0 0 0 0 311 500 50 127 0 0 0 0 0 0 0 0 312 500 50 47 0 76 0 0 0 0 0 0 313 0 0 0 0 73 0 0 5 0 0 0 314 400 165 14 0 20 0 0 0 0 0 0 339 0 0 0 0 0 437 0 4 0 0 0 340 0 105 202 0 0 0 0 0 0 0 0 341 0 0 0 0 154 0 0 0 0 0 0 342 0 0 0 0 29 0 0 1 0 0 0 343 0 510 44 0 0 0 0 0 0 0 0 344 400 285 233 0 0 0 0 0 0 0 0 345 550 35 50 0 0 0 0 0 0 0 0 346 1,350 1,475 1,067 0 0 0 0 0 0 72 0 347 850 175 16 0 0 0 0 0 0 0 0 348 504 165 14 0 165 0 0 0 0 0 0 349 321 25 6 0 165 0 0 0 0 0 0 350 0 0 0 0 0 0 0 0 0 0 38 351 70 15 16 0 58 0 0 0 0 0 0 352 0 0 0 0 188 0 1 1 0 0 0 353 355 85 84 0 67 0 0 0 32 0 0 354 150 35 25 0 41 0 0 0 0 0 1 355 0 10 12 0 15 0 0 0 0 0 215 Total Land Use 9,500 3,265 2,254 80 1,857 1,011 135 14 32 72 307 Shaded Cells Represent Mixed-Use District TAZs ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 22 Figure 5.1: Planned Circulation Improvements Future Mid-Block Number of Lanes on Streets in Project Area * Map Not to Scale; Future Streets are Conceptual ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 23 Table 5.2: Planned Circulation Improvements Intersection Lane Geometry L T R L T R L T R L T R 121 Anaheim / I-5 NB Ramp 2 3 0 0 3 1 0 0 0 0.5 1 1.5 122 Anaheim / Disney 1 3 0 2 3 0 2 4 0 0 3 0 125 Manchester I-5 SB/ Katella 1 0 2 2 2 1 0 3 2 2 3 0 126 Anaheim Way / Katella 2 2 1 0 0 0 2 3 0 0 3 2 143 Lewis / Katella 1 2 0 1 2 0 2 4 0 2 4 0 144 Manchester / Orangewood 0 0 0 2 3 0 0 3 1 2 3 0 145 Anaheim Way/ Orangewood 1 2 0 0 0 0 2 3 0 0 3 1 160 State College / Katella 2 3 1 2 3 1 2 4 0 2 4 0 161 State College / Sportstown 1 3 0 2 3 0 1 1 0 1 1 0 162 State College / Gene Autry 2 3 1 2 3 0 2 3 0 2 1 0 163 State College / Orangewood 2 4 0 2 4 0 2 3 0 2 3 1 170 Howell / Katella 1 1 1 2 0.5 1.5 2 3 0 2 3 0 171 Sportstown / Katella 2 0.5 1.5 1 1 1 2 3 1 2 3 1 172 Rampart / Orangewood 1 1 1 1 1 1 1 3 1 1 3 1 177 SR-57 SB Ramps / Katella 0 0 0 1 0 2 0 3 F 0 3 F 178 SR-57 NB Ramps / Katella 1.5 0 1.5 0 0 0 0 3 F 0 3 F 179 SR-57 SB Ramps / Orangewood 0 0 0 1 0 2 0 2 1 1 2 0 180 SR-57 NB Ramps / Orangewood 1 0 2 0 0 0 0 2 2 0 2 F 183 Douglass / Katella 2 0.5 1.5 2 0.5 1.5 2 3 1 2 4 0 257 Market / Katella 1 1 0 1 1 0 1 4 0 1 4 0 258 Gene Autry / Market 1 1 0 1 1 0 1 3 0 1 3 0 259 State College / Connector 1 4 0 1 4 0 1 1 0 1 1 0 261 Orangewood / 1 1 0 1 1 0 1 3 0 1 3 0 262 State College / 2 4 0 2 4 0 2 1 1 1 1 1 301 Main / Katella 2 2 1 2 2 1 2 3 1 2 3 1 302 Eckhoff / Orangewood 1 2 1 1 2 1 1 2 1 1 2 1 303 The City Drive / Chapman 2 4 1 2 4 1 2 3 1 2 3 1 304 Santiago / Meats 1 2 0 1 2 0 1 2 0 1 2 0 305 Chapman / Rampart 1 2 1 1 2 1 2 3 1 2 3 1 F = Free Turn Eastbound Westbound Intersection ID Intersection Northbound Southbound ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 24 Table 5.3: Daily Trip Generation for Proposed MLUP TAZ Total Trips 256 8,019 257 1,931 258 2,062 262 1,182 306 3,545 307 5,530 308 15,988 309 22,588 310 2,602 311 9,455 312 7,266 313 1,302 314 6,707 339 5,832 340 10,702 341 2,760 342 513 343 9,638 344 17,285 345 5,503 346 82,207 347 8,539 348 9,605 349 5,712 350 491 351 2,348 352 3,375 353 10,149 354 3,297 355 3,745 TOTAL 269,878 ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 25 Figure 5.2: Future Average Daily Traffic for Proposed MLUP (in Thousands) * Map Not to Scale Future Streets are Conceptual ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 26 Table 5.4: Level-of-Service for Proposed MLUP with Existing Lane Configurations AM Peak Hour PM Peak Hour Intersection V/C LOS V/C Diff* V/C LOS V/C Diff* Anaheim / I-5 NB Ramp 0.59 A 0.01 0.90 D 0.01 Anaheim / Disney 0.36 A 0.00 0.48 A 0.00 Manchester I-5 SB/ Katella 1.06 F 0.00 0.96 E 0.04 Anaheim Way / Katella 0.61 B 0.00 0.74 C 0.01 Lewis / Katella 0.66 B 0.03 0.88 D 0.02 Manchester / Orangewood 0.66 B 0.00 0.40 A 0.00 Anaheim Way/ Orangewood 0.45 A 0.00 0.58 A 0.01 State College / Katella 0.92 E 0.01 0.99 E 0.00 State College / Sportstown 0.69 B 0.03 0.72 C 0.06 State College / Gene Autry 0.68 B 0.00 0.85 D -0.01 State College / Orangewood 0.75 C 0.00 0.96 E 0.03 Howell / Katella 0.67 B 0.03 1.19 F 0.06 Sportstown / Katella 0.97 E 0.01 1.38 F 0.02 Rampart / Orangewood 0.77 C -0.02 0.98 E -0.07 SR-57 SB Ramps / Katella 0.69 B 0.00 0.59 A -0.11 SR-57 NB Ramps / Katella 0.52 A 0.00 0.62 B 0.00 SR-57 SB Ramps / Orangewood 0.68 B -0.02 0.78 C 0.00 SR-57 NB Ramps / Orangewood 0.53 A 0.00 0.51 A -0.01 Douglass / Katella 0.85 D 0.01 1.33 F 0.00 Market / Katella 0.65 B 0.03 0.73 C 0.02 Gene Autry / Market 0.27 A 0.02 0.49 A 0.07 State College / Connector 0.47 A 0.01 0.47 A 0.00 Orangewood / 0.39 A 0.00 0.56 A 0.00 State College / 0.54 A 0.00 0.52 A 0.01 Main / Katella 0.56 A 0.00 0.76 C 0.00 Eckhoff / Orangewood 0.58 A -0.01 0.82 D 0.00 City Drive / Chapman 0.64 B 0.02 0.74 C 0.01 Santiago / Meats 0.89 D 0.01 1.00 E 0.01 Chapman / Rampart 0.84 D 0.02 0.99 E 0.01 *Difference between Adopted MLUP and Proposed MLUP ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 27 Table 5.5: Level-of-Service for Proposed MLUP with Planned Circulation Improvements Lane Configurations AM Peak Hour PM Peak Hour Intersection V/C LOS V/C LOS Anaheim / I-5 NB Ramp 0.59 A 0.90 D Anaheim / Disney 0.36 A 0.48 A Manchester I-5 SB/ Katella 0.74 C 0.80 C Anaheim Way / Katella 0.61 B 0.74 C Lewis / Katella 0.49 A 0.68 B Manchester / Orangewood 0.66 B 0.40 A Anaheim Way/ Orangewood 0.45 A 0.58 A State College / Katella 0.78 C 0.88 D State College / Sportstown 0.69 B 0.72 C State College / Gene Autry 0.88 D 0.70 B State College / Orangewood 0.75 C 0.86 D Howell / Katella 0.53 A 0.81 D Sportstown / Katella 0.68 B 0.88 D Rampart / Orangewood 0.64 B 0.87 D SR-57 SB Ramps / Katella 0.69 B 0.59 A SR-57 NB Ramps / Katella 0.52 A 0.62 B SR-57 SB Ramps / Orangewood 0.68 B 0.78 C SR-57 NB Ramps / Orangewood 0.53 A 0.51 A Douglass / Katella 0.59 A 0.68 B Market / Katella 0.65 B 0.73 C Gene Autry / Market 0.27 A 0.49 A State College / Connector 0.47 A 0.47 A Orangewood / 0.39 A 0.56 A State College / 0.54 A 0.52 A Main / Katella 0.49 A 0.63 B Eckhoff / Orangewood 0.54 A 0.79 C City Drive / Chapman 0.64 B 0.70 B Santiago / Meats 0.89 D 1.00 E Chapman / Rampart 0.52 A 0.79 C ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. 28 6.0 MITIGATION MEASURES Mitigation Monitoring Program No. 106 for The Platinum Triangle was adopted as part of the Stadium Area Master Land Use Plan Environmental Impact Report (EIR No. 321) and was further updated and modified to reflect the development intensities analyzed by the General Plan in association with Environmental Impact Report No. 330, prepared for the General Plan and Zoning Code Update approved by City Council in May 2004. There are a number of mitigation measures in the Updated and Modified Mitigation Monitoring Plan No. 106 for The Platinum Triangle intended to reduce impacts to transportation and circulation in the project area. As indicated in this study, no intersections are anticipated to experience significant traffic impacts with the planned circulation improvements as provided for in the General Plan, The Platinum Triangle Master Land Use Plan and associated documents and therefore no additional mitigation is required in addition to those measure indicated in Updated and Modified Mitigation Monitoring Plan No. 106 for The Platinum Triangle. ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. APPENDIX A ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 121 Anaheim / I-5 NB Ramp AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 118 0.03 * 142 0.04 * NBT 3 5100 698 0.14 824 0.16 NBR 0 0 0 SBL 0 0 0 SBT 3 5100 958 0.19 * 1327 0.26 * SBR 1 1700 78 0.05 317 0.19 EBL 0 0 0 EBT 0 0 0.00 * 0 0.00 * EBR 0 0 0 WBL 0.5 850 11 0.01 * 71 0.08 * WBT 1 1700 12 0.01 68 0.04 WBR 1.5 2550 297 0.12 * 532 0.21 * N/S Movements 0.22 0.30 E/W Movements 0.01 0.08 Rt. Turn Component 0.10 0.13 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.39 0.56 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 122 Anaheim / Disney AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 25 0.01 19 0.01 NBT 3 5100 661 0.13 * 770 0.15 * NBR 0 4 6 SBL 2 3400 299 0.09 * 355 0.10 * SBT 3 5100 575 0.12 839 0.17 SBR 0 49 35 EBL 2 3400 208 0.06 * 139 0.04 * EBT 4 6800 56 0.02 117 0.04 EBR 0 65 140 WBL 0 0 0 WBT 3 5100 240 0.05 * 226 0.04 * WBR 0 2 3 N/S Movements 0.22 0.26 E/W Movements 0.11 0.09 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.38 0.39 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 125 Manchester I-5 SB/ Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 68 0.04 * 68 0.04 * NBT 0 0 0.00 0 0.00 NBR 2 3400 502 0.15 * 281 0.08 * SBL 2 3400 33 0.01 26 0.01 SBT 2 3400 74 0.02 * 44 0.01 * SBR 1 1700 14 0.01 7 0.00 EBL 0 0 0 * EBT 3 5100 737 0.14 * 930 0.18 EBR 1 1700 583 0.34 * 524 0.31 * WBL 2 3400 173 0.05 * 229 0.07 WBT 3 5100 929 0.18 2378 0.47 * WBR 0 0 0 N/S Movements 0.06 0.05 E/W Movements 0.20 0.47 Rt. Turn Component 0.22 0.09 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.52 0.66 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 126 Anaheim Way / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 339 0.10 * 501 0.15 * NBT 2 3400 250 0.07 333 0.10 NBR 1 1700 201 0.12 * 77 0.05 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 2 3400 75 0.02 99 0.03 * EBT 3 5100 1151 0.23 * 861 0.17 EBR 0 0 0 WBL 0 0 * 0 WBT 3 5100 700 0.14 1151 0.23 * WBR 2 3400 162 0.05 340 0.10 N/S Movements 0.10 0.15 E/W Movements 0.23 0.25 Rt. Turn Component 0.02 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.39 0.45 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 143 Lewis / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 17 0.01 27 0.02 NBT 1 1700 16 0.02 * 118 0.09 * NBR 0 20 32 SBL 1 1700 127 0.07 * 88 0.05 * SBT 1 1700 11 0.01 29 0.02 SBR 1 1700 177 0.10 312 0.18 * EBL 1 1700 276 0.16 * 157 0.09 * EBT 4 6800 1174 0.18 806 0.12 EBR 0 28 19 WBL 1 1700 15 0.01 21 0.01 WBT 3 5100 578 0.12 * 1466 0.30 * WBR 0 54 79 N/S Movements 0.10 0.14 E/W Movements 0.29 0.40 Rt. Turn Component 0.00 0.07 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.43 0.66 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 144 Manchester / Orangewood AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 2 3400 505 0.15 * 154 0.05 * SBT 3 5100 210 0.07 58 0.04 SBR 0 136 141 EBL 0 0 0 * EBT 3 5100 763 0.15 * 540 0.11 EBR 1 1700 487 0.29 * 192 0.11 * WBL 2 3400 30 0.01 * 56 0.02 WBT 3 5100 268 0.05 1154 0.23 * WBR 0 0 0 N/S Movements 0.15 0.05 E/W Movements 0.16 0.23 Rt. Turn Component 0.14 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.49 0.33 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 145 Anaheim Way/ Orangewood AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 20 0.01 194 0.11 * NBT 2 3400 44 0.01 * 99 0.03 NBR 0 1 1 SBL 0 0 * 0 SBT 0 0 0.00 0 0.00 * SBR 0 0 0 EBL 2 3400 141 0.04 168 0.05 * EBT 3 5100 1063 0.21 * 566 0.11 EBR 0 0 0 WBL 0 0 * 0 WBT 3 5100 278 0.05 1025 0.20 * WBR 1 1700 100 0.06 * 357 0.21 * N/S Movements 0.01 0.11 E/W Movements 0.21 0.25 Rt. Turn Component 0.00 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.28 0.42 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 160 State College / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 96 0.03 * 200 0.06 NBT 3 5100 511 0.13 1002 0.24 * NBR 0 147 242 SBL 2 3400 140 0.04 150 0.04 * SBT 3 5100 1140 0.25 * 867 0.20 SBR 0 115 164 EBL 2 3400 170 0.05 223 0.07 EBT 3 5100 778 0.15 * 809 0.16 * EBR 1 1700 123 0.07 174 0.10 WBL 2 3400 335 0.10 * 382 0.11 * WBT 3 5100 606 0.12 996 0.20 WBR 1 1700 85 0.05 179 0.11 N/S Movements 0.27 0.29 E/W Movements 0.25 0.27 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.58 0.61 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 161 State College / Sportstown AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 * 0 NBT 3 5100 692 0.14 1272 0.25 * NBR 0 1 0 SBL 2 3400 5 0.00 6 0.00 * SBT 3 5100 1230 0.24 * 1080 0.21 SBR 0 0 0 EBL 0 0 0 EBT 0 0 0.00 * 0 0.00 * EBR 0 0 0 WBL 1 1700 1 0.00 * 1 0.00 * WBT 0 0 0.00 0 0.00 WBR 1 1700 5 0.00 * 4 0.00 * N/S Movements 0.24 0.25 E/W Movements 0.00 0.00 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.29 0.30 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 162 State College / Gene Autry AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 102 0.03 * 45 0.01 * NBT 3 5100 633 0.13 1118 0.22 NBR 0 10 4 SBL 2 3400 3 0.00 2 0.00 SBT 3 5100 1062 0.24 * 1037 0.22 * SBR 0 166 67 EBL 1 1700 49 0.03 * 141 0.08 * EBT 2 3400 2 0.02 9 0.03 EBR 0 68 103 WBL 2 3400 1 0.00 15 0.00 WBT 1 1700 0 0.00 * 1 0.00 * WBR 0 3 3 N/S Movements 0.27 0.23 E/W Movements 0.03 0.09 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.35 0.37 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 163 State College / Orangewood AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 59 0.02 * 72 0.02 * NBT 4 6800 489 0.09 730 0.12 NBR 0 126 98 SBL 2 3400 201 0.06 153 0.05 SBT 4 6800 778 0.13 * 735 0.15 * SBR 0 133 263 EBL 2 3400 143 0.04 174 0.05 * EBT 3 5100 871 0.18 * 490 0.10 EBR 0 33 45 WBL 2 3400 203 0.06 * 325 0.10 WBT 3 5100 370 0.10 1024 0.24 * WBR 0 120 204 N/S Movements 0.15 0.17 E/W Movements 0.24 0.29 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.44 0.51 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 170 Howell / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 20 0.01 103 0.06 * NBT 1 1700 8 0.00 * 30 0.02 NBR 1 1700 29 0.02 153 0.09 * SBL 2 3400 324 0.10 * 466 0.14 SBT 1 1700 17 0.05 8 0.12 * SBR 0 66 195 EBL 1 1700 54 0.03 * 81 0.05 * EBT 3 5100 938 0.20 1206 0.24 EBR 0 77 37 WBL 2 3400 187 0.06 66 0.02 WBT 3 5100 876 0.23 * 1336 0.34 * WBR 0 303 415 N/S Movements 0.10 0.18 E/W Movements 0.26 0.39 Rt. Turn Component 0.00 0.05 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.41 0.67 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 171 Sportstown / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 24 0.01 46 0.03 NBT 0.5 850 6 0.01 * 5 0.01 * NBR 1.5 2550 29 0.01 74 0.03 * SBL 1 1700 52 0.03 * 132 0.08 * SBT 1 1700 10 0.01 9 0.01 SBR 1 1700 77 0.05 * 77 0.05 * EBL 1 1700 38 0.02 57 0.03 * EBT 3 5100 1003 0.20 * 1136 0.23 EBR 0 37 44 WBL 1 1700 14 0.01 * 30 0.02 WBT 3 5100 883 0.17 1629 0.32 * WBR 1 1700 128 0.08 79 0.05 N/S Movements 0.04 0.08 E/W Movements 0.21 0.35 Rt. Turn Component 0.02 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.32 0.50 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 172 Rampart / Orangewood AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 27 0.02 * 82 0.05 * NBT 1 1700 0 0.00 0 0.00 NBR 1 1700 78 0.05 187 0.11 * SBL 1 1700 0 0.00 0 0.00 SBT 1 1700 0 0.00 * 0 0.00 * SBR 1 1700 0 0.00 0 0.00 EBL 1 1700 0 0.00 0 0.00 * EBT 2 3400 933 0.30 * 753 0.24 EBR 0 88 73 WBL 1 1700 179 0.11 * 80 0.05 WBT 2 3400 679 0.20 1131 0.33 * WBR 1 1700 0 0.00 0 0.00 N/S Movements 0.02 0.05 E/W Movements 0.41 0.33 Rt. Turn Component 0.00 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.47 0.45 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 177 SR-57 SB Ramps / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 197 0.12 * 262 0.15 * SBT 0 0 0.00 0 0.00 SBR 2 3400 400 0.12 * 488 0.14 EBL 0 0 * 0 * EBT 3 5100 1139 0.22 1367 0.27 EBR (free) 10 17000 405 0.02 437 0.03 WBL 0 0 0 WBT 3 5100 1161 0.23 * 1538 0.30 * WBR (free) 10 17000 249 0.01 354 0.02 N/S Movements 0.12 0.15 E/W Movements 0.23 0.30 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.40 0.51 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 178 SR-57 NB Ramps / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1.5 2550 530 0.21 * 641 0.25 * NBT 0 0 0.00 0 0.00 NBR 1.5 2550 420 0.16 734 0.29 * SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 * 0 * EBT 3 5100 863 0.17 1086 0.21 EBR (free) 10 17000 295 0.02 536 0.03 WBL 0 0 0 WBT 3 5100 870 0.17 * 1219 0.24 * WBR (free) 10 17000 228 0.01 473 0.03 N/S Movements 0.21 0.25 E/W Movements 0.17 0.24 Rt. Turn Component 0.00 0.04 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.43 0.58 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 179 SR-57 SB Ramps / Orangewood AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 297 0.17 * 251 0.15 * SBT 0 0 0.00 0 0.00 SBR 2 3400 434 0.13 430 0.13 EBL 0 0 0 EBT 2 3400 855 0.25 * 853 0.25 * EBR (free) 1 1700 75 0.04 135 0.08 WBL 1 1700 226 0.13 * 447 0.26 * WBT 2 3400 358 0.11 864 0.25 WBR (free) 0 0 0 N/S Movements 0.17 0.15 E/W Movements 0.38 0.51 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.61 0.71 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 180 SR-57 NB Ramps / Orangewood AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 124 0.07 * 88 0.05 * NBT 0 0 0.00 0 0.00 NBR 2 3400 576 0.17 * 227 0.07 * SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 0 * EBT 2 3400 953 0.28 * 685 0.20 EBR (free) 2 3400 283 0.08 395 0.12 WBL 0 0 * 0 WBT 2 3400 500 0.15 1251 0.37 * WBR (free) 10 17000 178 0.01 301 0.02 N/S Movements 0.07 0.05 E/W Movements 0.28 0.37 Rt. Turn Component 0.10 0.02 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.50 0.48 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 183 Douglass / Katella AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0.5 850 26 0.03 197 0.23 * NBT 1.5 2550 13 0.02 * 65 0.04 NBR 0 27 47 SBL 1 1700 159 0.09 * 177 0.10 SBT 0.5 850 11 0.01 10 0.01 * SBR 1.5 2550 20 0.01 252 0.10 * EBL 2 3400 104 0.03 147 0.04 * EBT 3 5100 1259 0.25 * 1232 0.24 EBR 1 1700 55 0.03 35 0.02 WBL 2 3400 26 0.01 * 27 0.01 WBT 4 6800 1016 0.17 1416 0.23 * WBR 0 123 170 N/S Movements 0.11 0.24 E/W Movements 0.25 0.28 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.41 0.57 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 301 Main / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 67 0.02 * 206 0.06 NBT 2 3400 218 0.06 537 0.16 * NBR 1 1700 143 0.08 227 0.13 SBL 1 1700 80 0.05 80 0.05 * SBT 2 3400 326 0.10 * 271 0.08 SBR 1 1700 75 0.04 151 0.09 EBL 1 1700 90 0.05 65 0.04 EBT 3 5100 768 0.15 * 1234 0.24 * EBR 1 1700 91 0.05 75 0.04 WBL 1 1700 349 0.21 * 244 0.14 * WBT 3 5100 766 0.16 990 0.22 WBR 0 63 110 N/S Movements 0.12 0.21 E/W Movements 0.36 0.39 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.52 0.64 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 302 Eckhoff / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 66 0.04 * 94 0.06 * NBT 1 1700 69 0.06 73 0.07 NBR 0 36 45 SBL 1 1700 12 0.01 58 0.03 SBT 1 1700 62 0.04 * 116 0.07 * SBR 1 1700 296 0.17 714 0.42 * EBL 1 1700 544 0.32 * 265 0.16 * EBT 2 3400 761 0.22 619 0.18 EBR 1 1700 74 0.04 159 0.09 WBL 1 1700 17 0.01 31 0.02 WBT 2 3400 370 0.12 * 612 0.19 * WBR 0 35 35 N/S Movements 0.08 0.12 E/W Movements 0.44 0.35 Rt. Turn Component 0.00 0.20 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.56 0.72 LEVEL OF SERVICE (LOS) A C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 303 The City Drive / Chapman Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 80 0.02 * 190 0.06 * NBT 4 6800 510 0.08 1150 0.17 NBR 1 1700 110 0.06 660 0.39 * SBL 2 3400 160 0.05 190 0.06 SBT 3 5100 940 0.18 * 1170 0.23 * SBR 1 1700 420 0.25 * 420 0.25 EBL 2 3400 140 0.04 400 0.12 EBT 3 5100 660 0.13 * 1430 0.28 * EBR 1 1700 30 0.02 150 0.09 WBL 2 3400 480 0.14 * 420 0.12 * WBT 3 5100 720 0.14 1140 0.22 WBR 1 1700 10 0.01 130 0.08 N/S Movements 0.21 0.29 E/W Movements 0.27 0.40 Rt. Turn Component 0.02 0.10 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.55 0.83 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 304 Santiago / Meats Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 57 0.03 308 0.18 * NBT 2 3400 629 0.25 * 419 0.24 NBR 0 205 410 SBL 1 1700 405 0.24 * 53 0.03 SBT 2 3400 536 0.21 376 0.13 * SBR 0 172 67 EBL 1 1700 89 0.05 94 0.06 EBT 2 3400 96 0.18 * 618 0.30 * EBR 0 516 385 WBL 1 1700 368 0.22 * 154 0.09 * WBT 2 3400 537 0.20 225 0.07 WBR 0 134 24 N/S Movements 0.48 0.31 E/W Movements 0.40 0.39 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.93 0.75 LEVEL OF SERVICE (LOS) E C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Existing Conditions INTERSECTION: 305 Chapman / Rampart Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL NBT 0.00 * 0.00 * NBR SBL 1 1700 40 0.02 * 60 0.04 * SBT 0 0.00 0.00 SBR 1 1700 90 0.05 320 0.19 * EBL 1 1700 160 0.09 * 100 0.06 * EBT 3 5100 1020 0.20 1150 0.23 EBR 0 WBL 0 WBT 3 5100 1070 0.21 * 1540 0.30 * WBR 1 1700 50 0.03 100 0.06 N/S Movements 0.02 0.04 E/W Movements 0.30 0.36 Rt. Turn Component 0.00 0.13 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.38 0.58 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. APPENDIX B ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 121 Anaheim / I-5 NB Ramp Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 202 0.06 * 315 0.09 * NBT 3 5100 1006 0.20 1468 0.29 NBR 0 0 0 SBL 0 0 0 SBT 3 5100 1915 0.38 * 1862 0.37 * SBR 1 1700 113 0.07 374 0.22 EBL 0 0 0 EBT 0 0 0.00 * 0 0.00 * EBR 0 0 0 WBL 0.5 850 36 0.04 * 141 0.17 * WBT 1 1700 4 0.00 42 0.02 WBR 1.5 2550 240 0.09 * 963 0.38 * N/S Movements 0.44 0.46 E/W Movements 0.04 0.17 Rt. Turn Component 0.05 0.21 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.58 0.89 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 122 Anaheim / Disney Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 94 0.06 83 0.05 NBT 3 5100 584 0.12 * 1214 0.24 * NBR 0 4 6 SBL 2 3400 299 0.09 * 355 0.10 * SBT 3 5100 575 0.12 839 0.17 SBR 0 49 35 EBL 2 3400 208 0.06 * 139 0.04 * EBT 4 6800 56 0.02 117 0.04 EBR 0 65 140 WBL 0 0 0 WBT 3 5100 240 0.05 * 226 0.04 * WBR 0 2 3 N/S Movements 0.20 0.34 E/W Movements 0.11 0.09 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.36 0.48 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 125 Manchester I-5 SB/ Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 68 0.04 * 68 0.04 NBT 0 0 0.00 0 0.00 * NBR 2 3400 502 0.15 * 281 0.08 * SBL 2 3400 122 0.04 259 0.08 * SBT 2 3400 559 0.16 * 86 0.03 SBR 1 1700 14 0.01 7 0.00 EBL 0 0 * 0 * EBT 3 5100 1307 0.26 1768 0.35 EBR 1 1700 1086 0.64 * 897 0.53 * WBL 2 3400 147 0.04 138 0.04 WBT 3 5100 2024 0.40 * 3318 0.65 * WBR 0 0 0 N/S Movements 0.20 0.08 E/W Movements 0.40 0.65 Rt. Turn Component 0.41 0.14 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 1.06 0.92 LEVEL OF SERVICE (LOS) F E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 126 Anaheim Way / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 633 0.19 * 896 0.26 * NBT 2 3400 171 0.05 467 0.14 NBR 1 1700 193 0.11 317 0.19 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 2 3400 116 0.03 156 0.05 EBT 3 5100 1883 0.37 * 2119 0.42 * EBR 0 0 0 WBL 0 0 * 0 * WBT 3 5100 1554 0.30 1724 0.34 WBR 2 3400 348 0.10 660 0.19 N/S Movements 0.19 0.26 E/W Movements 0.37 0.42 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.61 0.73 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 143 Lewis / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 9 0.01 73 0.04 * NBT 1 1700 1 0.00 * 33 0.03 NBR 0 1 22 SBL 1 1700 165 0.10 * 75 0.04 SBT 1 1700 34 0.02 66 0.04 * SBR 1 1700 306 0.18 214 0.13 EBL 1 1700 291 0.17 * 388 0.23 * EBT 4 6800 1911 0.29 2068 0.31 EBR 0 35 24 WBL 1 1700 9 0.01 20 0.01 WBT 3 5100 1521 0.31 * 2432 0.50 * WBR 0 66 96 N/S Movements 0.10 0.08 E/W Movements 0.48 0.72 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.63 0.86 LEVEL OF SERVICE (LOS) B D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 144 Manchester / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 * 0 NBT 0 0 0.00 0 0.00 * NBR 0 0 0 SBL 2 3400 653 0.19 325 0.10 * SBT 3 5100 1016 0.23 * 286 0.09 SBR 0 154 187 EBL 0 0 0 * EBT 3 5100 661 0.13 * 889 0.17 EBR 1 1700 585 0.34 * 340 0.20 * WBL 2 3400 115 0.03 * 117 0.03 WBT 3 5100 498 0.10 1156 0.23 * WBR 0 0 0 N/S Movements 0.23 0.10 E/W Movements 0.16 0.23 Rt. Turn Component 0.21 0.03 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.66 0.40 LEVEL OF SERVICE (LOS) B A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 145 Anaheim Way/ Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 150 0.09 * 236 0.14 NBT 2 3400 84 0.03 553 0.16 * NBR 0 1 1 SBL 0 0 0 * SBT 0 0 0.00 * 0 0.00 SBR 0 0 0 EBL 2 3400 129 0.04 218 0.06 * EBT 3 5100 1115 0.22 * 1035 0.20 EBR 0 0 0 WBL 0 0 * 0 WBT 3 5100 464 0.09 1046 0.21 * WBR 1 1700 311 0.18 * 491 0.29 * N/S Movements 0.09 0.16 E/W Movements 0.22 0.27 Rt. Turn Component 0.09 0.08 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.45 0.57 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 160 State College / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 44 0.01 * 219 0.06 NBT 3 5100 435 0.11 1102 0.26 * NBR 0 137 232 SBL 2 3400 341 0.10 407 0.12 * SBT 3 5100 1102 0.28 * 715 0.21 SBR 0 342 365 EBL 2 3400 375 0.11 327 0.10 * EBT 3 5100 1846 0.36 * 1776 0.35 EBR 1 1700 158 0.09 62 0.04 WBL 2 3400 681 0.20 * 282 0.08 WBT 3 5100 1297 0.25 2369 0.46 * WBR 1 1700 169 0.10 414 0.24 N/S Movements 0.30 0.38 E/W Movements 0.56 0.56 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.91 0.99 LEVEL OF SERVICE (LOS) E E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 161 State College / Sportstown Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 70 0.04 * 226 0.13 * NBT 3 5100 393 0.13 1027 0.24 NBR 0 277 176 SBL 2 3400 253 0.07 56 0.02 SBT 3 5100 1737 0.34 * 1022 0.20 * SBR 0 0 0 EBL 1 1700 0 0.00 0 0.00 EBT 1 1700 54 0.19 * 32 0.08 * EBR 0 271 111 WBL 1 1700 70 0.04 * 327 0.19 * WBT 1 1700 13 0.01 59 0.26 WBR 0 11 378 N/S Movements 0.38 0.33 E/W Movements 0.23 0.28 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.66 0.66 LEVEL OF SERVICE (LOS) B B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 162 State College / Gene Autry Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 41 0.01 * 90 0.03 NBT 3 5100 643 0.28 1703 0.46 * NBR 0 775 636 SBL 2 3400 10 0.00 3 0.00 * SBT 3 5100 2069 0.41 * 1224 0.27 SBR 0 19 148 EBL 1 1700 154 0.09 63 0.04 EBT 2 3400 215 0.13 * 199 0.08 * EBR 0 219 76 WBL 2 3400 264 0.08 * 913 0.27 * WBT 1 1700 83 0.05 402 0.24 WBR 0 2 6 N/S Movements 0.42 0.46 E/W Movements 0.21 0.35 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.68 0.86 LEVEL OF SERVICE (LOS) B D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 163 State College / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 171 0.05 * 237 0.07 NBT 4 6800 888 0.14 1414 0.24 * NBR 0 96 211 SBL 2 3400 467 0.14 210 0.06 * SBT 4 6800 1711 0.28 * 1382 0.22 SBR 0 227 126 EBL 2 3400 154 0.05 526 0.15 * EBT 3 5100 997 0.22 * 916 0.20 EBR 0 118 79 WBL 2 3400 499 0.15 * 603 0.18 WBT 3 5100 749 0.17 1682 0.43 * WBR 0 99 503 N/S Movements 0.34 0.30 E/W Movements 0.37 0.58 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.75 0.93 LEVEL OF SERVICE (LOS) C E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 170 Howell / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 8 0.00 * 183 0.11 * NBT 1 1700 5 0.00 45 0.03 NBR 1 1700 6 0.00 199 0.12 SBL 2 3400 294 0.09 254 0.07 SBT 1 1700 39 0.23 * 6 0.38 * SBR 0 344 647 EBL 1 1700 69 0.04 * 332 0.20 * EBT 3 5100 1146 0.24 1119 0.22 EBR 0 53 19 WBL 2 3400 181 0.05 87 0.03 WBT 3 5100 1403 0.32 * 1839 0.39 * WBR 0 221 148 split phasing N/S Movements 0.23 0.49 E/W Movements 0.36 0.58 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.64 1.13 LEVEL OF SERVICE (LOS) B F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 171 Sportstown / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 398 0.23 * 902 0.53 * NBT 0.5 850 1 0.00 15 0.02 NBR 1.5 2550 78 0.03 198 0.08 SBL 1 1700 97 0.06 * 131 0.08 * SBT 1 1700 9 0.01 10 0.01 SBR 1 1700 67 0.04 67 0.04 EBL 1 1700 113 0.07 189 0.11 EBT 3 5100 1210 0.38 * 1606 0.45 * EBR 0 747 714 WBL 1 1700 398 0.23 * 414 0.24 * WBT 3 5100 1677 0.33 2197 0.43 WBR 1 1700 161 0.09 67 0.04 split phasing N/S Movements 0.29 0.61 E/W Movements 0.62 0.70 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.96 1.36 LEVEL OF SERVICE (LOS) E F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 172 Rampart / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 40 0.02 118 0.07 NBT 1 1700 95 0.06 * 128 0.08 * NBR 1 1700 504 0.30 * 689 0.41 * SBL 1 1700 146 0.09 * 394 0.23 * SBT 1 1700 60 0.04 141 0.08 SBR 1 1700 27 0.02 69 0.04 EBL 1 1700 58 0.03 61 0.04 * EBT 2 3400 986 0.33 * 732 0.23 EBR 0 129 46 WBL 1 1700 91 0.05 * 31 0.02 WBT 2 3400 841 0.25 1150 0.34 * WBR 1 1700 242 0.14 235 0.14 N/S Movements 0.14 0.31 E/W Movements 0.38 0.37 Rt. Turn Component 0.22 0.32 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.79 1.05 LEVEL OF SERVICE (LOS) C F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 177 SR-57 SB Ramps / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 495 0.29 * 218 0.13 * SBT 0 0 0.00 0 0.00 SBR 2 3400 1262 0.37 * 777 0.23 * EBL 0 0 * 0 * EBT 3 5100 1146 0.22 1433 0.28 EBR (free) 10 17000 328 0.02 324 0.02 WBL 0 0 1479 WBT 3 5100 1367 0.27 * 659 0.42 * WBR (free) 10 17000 233 0.01 0 0.00 N/S Movements 0.29 0.13 E/W Movements 0.27 0.42 Rt. Turn Component 0.08 0.10 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.69 0.70 LEVEL OF SERVICE (LOS) B B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 178 SR-57 NB Ramps / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1.5 2550 630 0.25 * 767 0.30 * NBT 0 0 0.00 0 0.00 NBR 1.5 2550 395 0.15 578 0.23 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 * 0 * EBT 3 5100 1103 0.22 1109 0.22 EBR (free) 10 17000 494 0.03 493 0.03 WBL 0 0 0 WBT 3 5100 1150 0.23 * 1362 0.27 * WBR (free) 10 17000 369 0.02 751 0.04 N/S Movements 0.25 0.30 E/W Movements 0.23 0.27 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.52 0.62 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 179 SR-57 SB Ramps / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 417 0.25 * 301 0.18 * SBT 0 15 0.00 0 0.00 SBR 2 3400 568 0.17 688 0.20 * EBL 0 0 0 EBT 2 3400 951 0.28 * 1077 0.32 * EBR (free) 1 1700 120 0.07 266 0.16 WBL 1 1700 205 0.12 * 355 0.21 * WBT 2 3400 722 0.21 1452 0.43 WBR (free) 0 0 0 N/S Movements 0.25 0.18 E/W Movements 0.40 0.53 Rt. Turn Component 0.00 0.03 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.70 0.78 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 180 SR-57 NB Ramps / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 159 0.09 * 113 0.07 * NBT 0 0 0.00 0 0.00 NBR 2 3400 500 0.15 * 120 0.04 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 0 * EBT 2 3400 1143 0.34 * 888 0.26 EBR 2 3400 275 0.08 403 0.12 WBL 0 0 * 0 WBT 2 3400 618 0.18 1362 0.40 * WBR (free) 10 17000 137 0.01 422 0.02 N/S Movements 0.09 0.07 E/W Movements 0.34 0.40 Rt. Turn Component 0.05 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.53 0.52 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 183 Douglass / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0.5 850 184 0.22 647 0.76 * NBT 1.5 2550 39 0.10 * 122 0.31 NBR 0 228 678 SBL 1 1700 339 0.20 * 272 0.16 SBT 0.5 850 59 0.07 63 0.07 * SBR 1.5 2550 130 0.05 309 0.12 EBL 2 3400 185 0.05 277 0.08 EBT 3 5100 1227 0.24 * 1061 0.21 * EBR 1 1700 88 0.05 78 0.05 WBL 2 3400 468 0.14 * 524 0.15 * WBT 4 6800 872 0.14 1328 0.25 WBR 0 106 357 split phasing N/S Movements 0.42 0.92 E/W Movements 0.38 0.36 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.84 1.33 LEVEL OF SERVICE (LOS) D F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 257 Market / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 348 0.20 * 262 0.15 * NBT 1 1700 22 0.04 25 0.04 NBR 0 52 48 SBL 1 1700 51 0.03 172 0.10 SBT 1 1700 8 0.03 * 28 0.10 * SBR 0 44 134 EBL 1 1700 156 0.09 152 0.09 EBT 4 6800 1859 0.30 * 1590 0.28 * EBR 0 164 329 WBL 1 1700 59 0.03 * 218 0.13 * WBT 4 6800 1092 0.17 2098 0.32 WBR 0 46 74 N/S Movements 0.24 0.25 E/W Movements 0.33 0.41 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.62 0.71 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 258 Gene Autry / Market Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 51 0.03 * 91 0.05 * NBT 1 1700 26 0.03 38 0.04 NBR 0 33 27 SBL 1 1700 85 0.05 54 0.03 SBT 1 1700 31 0.07 * 36 0.09 * SBR 0 84 114 EBL 1 1700 92 0.05 162 0.10 * EBT 3 5100 447 0.09 * 510 0.12 EBR 0 35 76 WBL 1 1700 12 0.01 * 24 0.01 WBT 3 5100 113 0.03 610 0.13 * WBR 0 32 71 N/S Movements 0.10 0.14 E/W Movements 0.10 0.23 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.25 0.42 LEVEL OF SERVICE (LOS) A A ICU LOS 0.01 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 259 State College / Connector Street Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 31 0.02 * 44 0.03 NBT 4 6800 728 0.11 1952 0.29 * NBR 0 11 8 SBL 1 1700 64 0.04 64 0.04 * SBT 4 6800 2235 0.33 * 1374 0.21 SBR 0 36 53 EBL 1 1700 74 0.04 * 72 0.04 * EBT 1 1700 1 0.03 1 0.03 EBR 0 53 41 WBL 1 1700 7 0.00 26 0.02 WBT 1 1700 1 0.02 * 2 0.06 * WBR 0 32 93 N/S Movements 0.35 0.33 E/W Movements 0.06 0.10 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.46 0.47 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 261 Orangewood / Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 76 0.04 * 124 0.07 * NBT 1 1700 1 0.03 1 0.06 NBR 0 54 99 SBL 1 1700 17 0.01 66 0.04 SBT 1 1700 0 0.02 * 1 0.05 * SBR 0 28 88 EBL 1 1700 49 0.03 41 0.02 * EBT 3 5100 1110 0.23 * 607 0.13 EBR 0 55 61 WBL 1 1700 79 0.05 * 77 0.05 WBT 3 5100 1002 0.21 1777 0.36 * WBR 0 45 41 N/S Movements 0.06 0.13 E/W Movements 0.27 0.38 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.39 0.56 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 262 State College / Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 129 0.04 * 94 0.03 * NBT 4 6800 661 0.12 1452 0.23 NBR 0 133 136 SBL 2 3400 18 0.01 24 0.01 SBT 4 6800 2416 0.36 * 1592 0.24 * SBR 0 24 18 EBL 2 3400 18 0.01 48 0.01 EBT 1 1700 1 0.00 * 5 0.00 * EBR 1 1700 101 0.06 * 170 0.10 * WBL 1 1700 108 0.06 * 176 0.10 * WBT 1 1700 4 0.00 3 0.00 WBR 1 1700 25 0.01 * 42 0.02 * N/S Movements 0.40 0.26 E/W Movements 0.06 0.11 Rt. Turn Component 0.03 0.09 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.54 0.51 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 301 Main / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 68 0.02 * 275 0.08 NBT 2 3400 246 0.07 567 0.17 * NBR 1 1700 192 0.11 244 0.14 SBL 1 1700 66 0.04 192 0.11 * SBT 2 3400 554 0.16 * 301 0.09 SBR 1 1700 248 0.15 184 0.11 EBL 1 1700 99 0.06 197 0.12 EBT 3 5100 908 0.18 * 1640 0.32 * EBR 1 1700 228 0.13 137 0.08 WBL 1 1700 246 0.14 * 188 0.11 * WBT 3 5100 914 0.22 1396 0.31 WBR 0 213 189 N/S Movements 0.18 0.28 E/W Movements 0.32 0.43 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.56 0.76 LEVEL OF SERVICE (LOS) A C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 302 Eckhoff / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 66 0.04 * 94 0.06 NBT 1 1700 69 0.06 73 0.07 * NBR 0 36 45 SBL 1 1700 14 0.01 135 0.08 * SBT 1 1700 62 0.04 * 116 0.07 SBR 1 1700 316 0.19 712 0.42 * EBL 1 1700 529 0.31 * 246 0.14 * EBT 2 3400 896 0.26 735 0.22 EBR 1 1700 74 0.04 158 0.09 WBL 1 1700 17 0.01 31 0.02 WBT 2 3400 428 0.15 * 845 0.27 * WBR 0 83 60 N/S Movements 0.08 0.15 E/W Movements 0.46 0.41 Rt. Turn Component 0.00 0.21 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.59 0.82 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 303 The City Drive / Chapman Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 123 0.04 * 234 0.07 * NBT 4 6800 512 0.08 1834 0.27 NBR 1 1700 49 0.03 400 0.24 SBL 2 3400 33 0.01 21 0.01 SBT 3 5100 1451 0.28 * 1253 0.25 * SBR 1 1700 545 0.32 278 0.16 EBL 2 3400 152 0.04 * 515 0.15 * EBT 3 5100 742 0.15 1469 0.29 EBR 1 1700 383 0.23 * 369 0.22 WBL 2 3400 192 0.06 238 0.07 WBT 3 5100 803 0.16 * 1072 0.21 * WBR 1 1700 186 0.11 377 0.22 * N/S Movements 0.32 0.31 E/W Movements 0.20 0.36 Rt. Turn Component 0.04 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.62 0.73 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 304 Santiago / Meats Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 204 0.12 495 0.29 * NBT 2 3400 581 0.23 * 373 0.23 NBR 0 216 411 SBL 1 1700 402 0.24 * 29 0.02 SBT 2 3400 595 0.25 270 0.11 * SBR 0 257 96 EBL 1 1700 90 0.05 * 117 0.07 EBT 2 3400 108 0.20 805 0.46 * EBR 0 555 744 WBL 1 1700 144 0.08 141 0.08 * WBT 2 3400 939 0.31 * 273 0.08 WBR 0 119 14 N/S Movements 0.47 0.40 E/W Movements 0.36 0.54 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.88 0.99 LEVEL OF SERVICE (LOS) D E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Adopted MLUP w/ Existing Lane Geometrics INTERSECTION: 305 Chapman / Rampart Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 38 0.02 24 0.01 NBT 1 1700 420 0.38 * 249 0.42 * NBR 0 233 466 SBL 1 1700 29 0.02 * 69 0.04 * SBT 0 45 0.00 141 0.00 SBR 1 1700 14 0.01 69 0.04 * EBL 1 1700 54 0.03 * 53 0.03 * EBT 3 5100 1304 0.26 1359 0.27 EBR 0 1 33 WBL 0 274 109 WBT 3 5100 1466 0.34 * 2074 0.43 * WBR 1 1700 132 0.08 165 0.10 N/S Movements 0.40 0.46 E/W Movements 0.37 0.46 Rt. Turn Component 0.00 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.82 0.98 LEVEL OF SERVICE (LOS) D E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. APPENDIX C ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 121 Anaheim / I-5 NB Ramp Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 202 0.06 * 341 0.10 * NBT 3 5100 1015 0.20 1474 0.29 NBR 0 0 0 SBL 0 0 0 SBT 3 5100 1944 0.38 * 1886 0.37 * SBR 1 1700 113 0.07 371 0.22 EBL 0 0 0 EBT 0 0 0.00 * 0 0.00 * EBR 0 0 0 WBL 0.5 850 38 0.04 * 141 0.17 * WBT 1 1700 4 0.00 40 0.02 WBR 1.5 2550 243 0.10 * 978 0.38 * N/S Movements 0.44 0.47 E/W Movements 0.04 0.17 Rt. Turn Component 0.05 0.22 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.59 0.90 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 122 Anaheim / Disney Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 97 0.06 88 0.05 NBT 3 5100 585 0.12 * 1231 0.24 * NBR 0 4 6 SBL 2 3400 299 0.09 * 355 0.10 * SBT 3 5100 575 0.12 839 0.17 SBR 0 49 35 EBL 2 3400 208 0.06 * 139 0.04 * EBT 4 6800 56 0.02 117 0.04 EBR 0 65 140 WBL 0 0 0 WBT 3 5100 240 0.05 * 226 0.04 * WBR 0 2 3 N/S Movements 0.20 0.35 E/W Movements 0.11 0.09 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.36 0.48 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 125 Manchester I-5 SB/ Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 68 0.04 * 68 0.04 NBT 0 0 0.00 0 0.00 * NBR 2 3400 502 0.15 * 281 0.08 * SBL 2 3400 127 0.04 320 0.09 * SBT 2 3400 577 0.17 * 90 0.03 SBR 1 1700 14 0.01 7 0.00 EBL 0 0 * 0 * EBT 3 5100 1329 0.26 1763 0.35 EBR 1 1700 1082 0.64 * 913 0.54 * WBL 2 3400 133 0.04 144 0.04 WBT 3 5100 2030 0.40 * 3362 0.66 * WBR 0 0 0 N/S Movements 0.21 0.09 E/W Movements 0.40 0.66 Rt. Turn Component 0.40 0.15 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 1.06 0.96 LEVEL OF SERVICE (LOS) F E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 126 Anaheim Way / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 614 0.18 * 893 0.26 * NBT 2 3400 167 0.05 447 0.13 NBR 1 1700 205 0.12 338 0.20 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 2 3400 116 0.03 153 0.04 EBT 3 5100 1931 0.38 * 2175 0.43 * EBR 0 0 0 WBL 0 0 * 0 * WBT 3 5100 1567 0.31 1785 0.35 WBR 2 3400 363 0.11 695 0.20 N/S Movements 0.18 0.26 E/W Movements 0.38 0.43 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.61 0.74 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 143 Lewis / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 8 0.00 72 0.04 * NBT 1 1700 1 0.00 * 31 0.03 NBR 0 1 22 SBL 1 1700 198 0.12 * 81 0.05 SBT 1 1700 37 0.02 69 0.04 * SBR 1 1700 291 0.17 213 0.13 EBL 1 1700 298 0.18 * 390 0.23 * EBT 4 6800 1972 0.29 2143 0.32 EBR 0 32 23 WBL 1 1700 11 0.01 19 0.01 WBT 3 5100 1568 0.32 * 2535 0.52 * WBR 0 66 109 N/S Movements 0.12 0.08 E/W Movements 0.50 0.75 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.66 0.88 LEVEL OF SERVICE (LOS) B D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 144 Manchester / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 * 0 NBT 0 0 0.00 0 0.00 * NBR 0 0 0 SBL 2 3400 662 0.19 338 0.10 * SBT 3 5100 1034 0.23 * 302 0.10 SBR 0 153 189 EBL 0 0 0 * EBT 3 5100 662 0.13 * 849 0.17 EBR 1 1700 581 0.34 * 335 0.20 * WBL 2 3400 115 0.03 * 122 0.04 WBT 3 5100 486 0.10 1115 0.22 * WBR 0 0 0 N/S Movements 0.23 0.10 E/W Movements 0.16 0.22 Rt. Turn Component 0.21 0.03 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.66 0.40 LEVEL OF SERVICE (LOS) B A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 145 Anaheim Way/ Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 139 0.08 * 228 0.13 NBT 2 3400 83 0.02 545 0.16 * NBR 0 1 1 SBL 0 0 0 * SBT 0 0 0.00 * 0 0.00 SBR 0 0 0 EBL 2 3400 130 0.04 200 0.06 * EBT 3 5100 1124 0.22 * 1027 0.20 EBR 0 0 0 WBL 0 0 * 0 WBT 3 5100 463 0.09 1019 0.20 * WBR 1 1700 317 0.19 * 522 0.31 * N/S Movements 0.08 0.16 E/W Movements 0.22 0.26 Rt. Turn Component 0.10 0.11 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.45 0.58 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 160 State College / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 47 0.01 * 213 0.06 NBT 3 5100 437 0.11 1072 0.26 * NBR 0 138 237 SBL 2 3400 323 0.09 411 0.12 * SBT 3 5100 1080 0.28 * 716 0.21 SBR 0 354 378 EBL 2 3400 397 0.12 303 0.09 * EBT 3 5100 1874 0.37 * 1857 0.36 EBR 1 1700 160 0.09 61 0.04 WBL 2 3400 691 0.20 * 271 0.08 WBT 3 5100 1324 0.26 2413 0.47 * WBR 1 1700 168 0.10 408 0.24 N/S Movements 0.29 0.38 E/W Movements 0.57 0.56 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.92 0.99 LEVEL OF SERVICE (LOS) E E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 161 State College / Sportstown Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 113 0.07 * 265 0.16 * NBT 3 5100 386 0.13 990 0.23 NBR 0 275 169 SBL 2 3400 255 0.08 56 0.02 SBT 3 5100 1725 0.34 * 1007 0.20 * SBR 0 0 0 EBL 1 1700 0 0.00 0 0.00 EBT 1 1700 58 0.20 * 42 0.12 * EBR 0 280 168 WBL 1 1700 70 0.04 * 327 0.19 * WBT 1 1700 19 0.02 70 0.27 WBR 0 11 380 N/S Movements 0.40 0.35 E/W Movements 0.24 0.32 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.69 0.72 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 162 State College / Gene Autry Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 39 0.01 * 89 0.03 NBT 3 5100 694 0.29 1699 0.46 * NBR 0 781 624 SBL 2 3400 10 0.00 3 0.00 * SBT 3 5100 2059 0.41 * 1247 0.27 SBR 0 28 143 EBL 1 1700 158 0.09 62 0.04 EBT 2 3400 211 0.13 * 195 0.08 * EBR 0 230 74 WBL 2 3400 265 0.08 * 896 0.26 * WBT 1 1700 85 0.05 403 0.24 WBR 0 2 6 N/S Movements 0.42 0.46 E/W Movements 0.21 0.34 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.68 0.85 LEVEL OF SERVICE (LOS) B D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 163 State College / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 164 0.05 * 238 0.07 NBT 4 6800 930 0.15 1381 0.26 * NBR 0 100 394 SBL 2 3400 469 0.14 220 0.06 * SBT 4 6800 1712 0.29 * 1346 0.21 SBR 0 227 104 EBL 2 3400 150 0.04 522 0.15 * EBT 3 5100 1004 0.22 * 916 0.20 EBR 0 117 86 WBL 2 3400 511 0.15 * 609 0.18 WBT 3 5100 762 0.17 1674 0.43 * WBR 0 118 520 N/S Movements 0.33 0.33 E/W Movements 0.37 0.58 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.75 0.96 LEVEL OF SERVICE (LOS) C E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 170 Howell / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 8 0.00 * 183 0.11 * NBT 1 1700 5 0.00 45 0.03 NBR 1 1700 6 0.00 199 0.12 SBL 2 3400 293 0.09 259 0.08 SBT 1 1700 39 0.26 * 6 0.39 * SBR 0 401 654 EBL 1 1700 69 0.04 * 418 0.25 * EBT 3 5100 1149 0.24 1153 0.23 EBR 0 53 19 WBL 2 3400 181 0.05 87 0.03 WBT 3 5100 1392 0.32 * 1869 0.39 * WBR 0 236 139 split phasing N/S Movements 0.26 0.50 E/W Movements 0.36 0.64 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.67 1.19 LEVEL OF SERVICE (LOS) B F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 171 Sportstown / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 395 0.23 * 902 0.53 * NBT 0.5 850 1 0.00 15 0.02 NBR 1.5 2550 78 0.03 205 0.08 SBL 1 1700 97 0.06 * 131 0.08 * SBT 1 1700 9 0.01 10 0.01 SBR 1 1700 67 0.04 67 0.04 EBL 1 1700 113 0.07 189 0.11 EBT 3 5100 1216 0.39 * 1716 0.47 * EBR 0 756 699 WBL 1 1700 406 0.24 * 423 0.25 * WBT 3 5100 1715 0.34 2223 0.44 WBR 1 1700 161 0.09 67 0.04 split phasing N/S Movements 0.29 0.61 E/W Movements 0.63 0.72 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.97 1.38 LEVEL OF SERVICE (LOS) E F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 172 Rampart / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 82 0.05 150 0.09 NBT 1 1700 121 0.07 * 180 0.11 * NBR 1 1700 465 0.27 * 568 0.33 * SBL 1 1700 157 0.09 * 399 0.23 * SBT 1 1700 51 0.05 152 0.13 SBR 0 29 71 EBL 1 1700 60 0.04 53 0.03 * EBT 2 3400 1004 0.34 * 898 0.28 EBR 0 140 61 WBL 1 1700 100 0.06 * 33 0.02 WBT 2 3400 862 0.25 1147 0.34 * WBR 1 1700 230 0.14 212 0.12 N/S Movements 0.16 0.34 E/W Movements 0.40 0.37 Rt. Turn Component 0.17 0.23 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.77 0.98 LEVEL OF SERVICE (LOS) C E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 177 SR-57 SB Ramps / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 507 0.30 * 192 0.11 * SBT 0 0 0.00 0 0.00 SBR 2 3400 1261 0.37 * 792 0.23 * EBL 0 0 * 0 * EBT 3 5100 1144 0.22 1457 0.29 EBR (free) 10 17000 334 0.02 341 0.02 WBL 0 0 0 WBT 3 5100 1372 0.27 * 1569 0.31 * WBR (free) 10 17000 232 0.01 576 0.03 N/S Movements 0.30 0.11 E/W Movements 0.27 0.31 Rt. Turn Component 0.07 0.12 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.69 0.59 LEVEL OF SERVICE (LOS) B A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 178 SR-57 NB Ramps / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1.5 2550 628 0.25 * 771 0.30 * NBT 0 0 0.00 0 0.00 NBR 1.5 2550 392 0.15 568 0.22 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 * 0 * EBT 3 5100 1128 0.22 1117 0.22 EBR (free) 10 17000 477 0.03 483 0.03 WBL 0 0 0 WBT 3 5100 1155 0.23 * 1366 0.27 * WBR (free) 10 17000 371 0.02 736 0.04 N/S Movements 0.25 0.30 E/W Movements 0.23 0.27 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.52 0.62 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 179 SR-57 SB Ramps / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 405 0.24 * 305 0.18 * SBT 0 15 0.00 0 0.00 SBR 2 3400 592 0.17 667 0.20 * EBL 0 0 0 EBT 2 3400 930 0.27 * 1104 0.32 * EBR (free) 1 1700 129 0.08 278 0.16 WBL 1 1700 206 0.12 * 354 0.21 * WBT 2 3400 717 0.21 1449 0.43 WBR (free) 0 0 0 N/S Movements 0.24 0.18 E/W Movements 0.39 0.53 Rt. Turn Component 0.00 0.02 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.68 0.78 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 180 SR-57 NB Ramps / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 157 0.09 * 104 0.06 * NBT 0 0 0.00 0 0.00 NBR 2 3400 496 0.15 * 108 0.03 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 0 * EBT 2 3400 1143 0.34 * 883 0.26 EBR 2 3400 241 0.07 439 0.13 WBL 0 0 * 0 WBT 2 3400 620 0.18 1366 0.40 * WBR (free) 10 17000 141 0.01 422 0.02 N/S Movements 0.09 0.06 E/W Movements 0.34 0.40 Rt. Turn Component 0.05 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.53 0.51 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 183 Douglass / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0.5 850 185 0.22 644 0.76 * NBT 1.5 2550 40 0.10 * 123 0.31 NBR 0 225 676 SBL 1 1700 349 0.21 * 283 0.17 SBT 0.5 850 58 0.07 65 0.08 * SBR 1.5 2550 131 0.05 295 0.12 EBL 2 3400 195 0.06 293 0.09 EBT 3 5100 1241 0.24 * 1045 0.20 * EBR 1 1700 87 0.05 78 0.05 WBL 2 3400 467 0.14 * 526 0.15 * WBT 4 6800 877 0.14 1334 0.25 WBR 0 106 343 split phasing N/S Movements 0.42 0.92 E/W Movements 0.38 0.36 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.85 1.33 LEVEL OF SERVICE (LOS) D F ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 257 Market / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 382 0.22 * 315 0.19 * NBT 1 1700 22 0.05 26 0.07 NBR 0 61 85 SBL 1 1700 51 0.03 173 0.10 SBT 1 1700 9 0.02 * 28 0.07 * SBR 0 29 88 EBL 1 1700 153 0.09 150 0.09 EBT 4 6800 1925 0.31 * 1638 0.29 * EBR 0 194 367 WBL 1 1700 77 0.05 * 225 0.13 * WBT 4 6800 1107 0.17 2161 0.33 WBR 0 48 70 N/S Movements 0.25 0.25 E/W Movements 0.36 0.43 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.65 0.73 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 258 Gene Autry / Market Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 49 0.03 * 99 0.06 * NBT 1 1700 32 0.04 53 0.05 NBR 0 33 27 SBL 1 1700 90 0.05 54 0.03 SBT 1 1700 41 0.08 * 53 0.13 * SBR 0 101 172 EBL 1 1700 127 0.07 206 0.12 * EBT 3 5100 453 0.10 * 504 0.12 EBR 0 47 86 WBL 1 1700 12 0.01 * 24 0.01 WBT 3 5100 121 0.03 605 0.13 * WBR 0 32 71 N/S Movements 0.11 0.19 E/W Movements 0.11 0.25 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.27 0.49 LEVEL OF SERVICE (LOS) A A ICU LOS 0.01 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 259 State College / Connector Street Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 33 0.02 * 46 0.03 NBT 4 6800 784 0.12 1929 0.28 * NBR 0 11 8 SBL 1 1700 59 0.03 61 0.04 * SBT 4 6800 2235 0.33 * 1330 0.21 SBR 0 40 115 EBL 1 1700 75 0.04 * 81 0.05 * EBT 1 1700 2 0.03 1 0.02 EBR 0 56 37 WBL 1 1700 7 0.00 25 0.01 WBT 1 1700 1 0.02 * 2 0.05 * WBR 0 30 90 N/S Movements 0.35 0.32 E/W Movements 0.06 0.10 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.47 0.47 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 261 Orangewood / Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 77 0.05 * 115 0.07 * NBT 1 1700 1 0.03 1 0.06 NBR 0 54 94 SBL 1 1700 17 0.01 59 0.03 SBT 1 1700 1 0.02 * 2 0.05 * SBR 0 27 83 EBL 1 1700 44 0.03 48 0.03 * EBT 3 5100 1141 0.23 * 782 0.17 EBR 0 47 78 WBL 1 1700 79 0.05 * 76 0.04 WBT 3 5100 1048 0.21 1804 0.36 * WBR 0 44 37 N/S Movements 0.06 0.12 E/W Movements 0.28 0.39 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.39 0.56 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 262 State College / Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 126 0.04 * 94 0.03 * NBT 4 6800 706 0.12 1596 0.25 NBR 0 132 134 SBL 2 3400 18 0.01 24 0.01 SBT 4 6800 2429 0.36 * 1597 0.24 * SBR 0 24 18 EBL 2 3400 18 0.01 48 0.01 EBT 1 1700 2 0.00 * 4 0.00 * EBR 1 1700 103 0.06 * 182 0.11 * WBL 1 1700 105 0.06 * 174 0.10 * WBT 1 1700 4 0.00 3 0.00 WBR 1 1700 25 0.01 * 49 0.03 * N/S Movements 0.40 0.27 E/W Movements 0.06 0.10 Rt. Turn Component 0.03 0.10 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.54 0.52 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 301 Main / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 70 0.02 * 276 0.08 NBT 2 3400 247 0.07 551 0.16 * NBR 1 1700 187 0.11 250 0.15 SBL 1 1700 92 0.05 194 0.11 * SBT 2 3400 577 0.17 * 303 0.09 SBR 1 1700 254 0.15 183 0.11 EBL 1 1700 101 0.06 223 0.13 * EBT 3 5100 920 0.18 * 1606 0.31 EBR 1 1700 236 0.14 138 0.08 WBL 1 1700 239 0.14 * 171 0.10 WBT 3 5100 918 0.22 1377 0.31 * WBR 0 224 182 N/S Movements 0.19 0.28 E/W Movements 0.32 0.44 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.56 0.76 LEVEL OF SERVICE (LOS) A C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 302 Eckhoff / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 66 0.04 * 94 0.06 NBT 1 1700 69 0.06 73 0.07 * NBR 0 36 45 SBL 1 1700 16 0.01 134 0.08 * SBT 1 1700 62 0.04 * 116 0.07 SBR 1 1700 312 0.18 717 0.42 * EBL 1 1700 521 0.31 * 249 0.15 * EBT 2 3400 922 0.27 714 0.21 EBR 1 1700 74 0.04 159 0.09 WBL 1 1700 17 0.01 31 0.02 WBT 2 3400 436 0.15 * 845 0.26 * WBR 0 79 52 N/S Movements 0.08 0.15 E/W Movements 0.46 0.41 Rt. Turn Component 0.00 0.21 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.58 0.82 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 303 The City Drive / Chapman Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 125 0.04 * 241 0.07 * NBT 4 6800 592 0.09 1875 0.28 NBR 1 1700 51 0.03 407 0.24 SBL 2 3400 32 0.01 21 0.01 SBT 3 5100 1480 0.29 * 1246 0.24 * SBR 1 1700 572 0.34 * 318 0.19 EBL 2 3400 126 0.04 * 527 0.15 * EBT 3 5100 633 0.12 1501 0.29 EBR 1 1700 361 0.21 * 362 0.21 WBL 2 3400 183 0.05 235 0.07 WBT 3 5100 837 0.16 * 1109 0.22 * WBR 1 1700 187 0.11 360 0.21 N/S Movements 0.33 0.32 E/W Movements 0.20 0.37 Rt. Turn Component 0.06 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.64 0.74 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 304 Santiago / Meats Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 209 0.12 488 0.29 * NBT 2 3400 586 0.23 * 364 0.23 NBR 0 212 409 SBL 1 1700 400 0.24 * 37 0.02 SBT 2 3400 594 0.25 332 0.13 * SBR 0 257 96 EBL 1 1700 94 0.06 * 118 0.07 EBT 2 3400 106 0.20 798 0.45 * EBR 0 558 743 WBL 1 1700 145 0.09 141 0.08 * WBT 2 3400 951 0.32 * 275 0.08 WBR 0 121 13 N/S Movements 0.47 0.41 E/W Movements 0.37 0.54 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.89 1.00 LEVEL OF SERVICE (LOS) D E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Existing Lane Geometrics INTERSECTION: 305 Chapman / Rampart Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 36 0.02 21 0.01 NBT 1 1700 309 0.39 * 140 0.42 * NBR 0 351 574 SBL 1 1700 29 0.02 * 74 0.04 * SBT 0 51 0.00 136 0.00 SBR 1 1700 17 0.01 75 0.04 * EBL 1 1700 67 0.04 * 61 0.04 * EBT 3 5100 1246 0.24 1310 0.26 EBR 0 2 35 WBL 0 284 185 WBT 3 5100 1484 0.35 * 2005 0.43 * WBR 1 1700 158 0.09 207 0.12 N/S Movements 0.41 0.46 E/W Movements 0.39 0.47 Rt. Turn Component 0.00 0.01 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.84 0.99 LEVEL OF SERVICE (LOS) D E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- Parsons Brinckerhoff Quade & Douglas, Inc. APPENDIX D ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 121 Anaheim / I-5 NB Ramp Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 202 0.06 * 341 0.10 * NBT 3 5100 1015 0.20 1474 0.29 NBR 0 0 0 SBL 0 0 0 SBT 3 5100 1944 0.38 * 1886 0.37 * SBR 1 1700 113 0.07 371 0.22 EBL 0 0 0 EBT 0 0 0.00 * 0 0.00 * EBR 0 0 0 WBL 0.5 850 38 0.04 * 141 0.17 * WBT 1 1700 4 0.00 40 0.02 WBR 1.5 2550 243 0.10 * 978 0.38 * N/S Movements 0.44 0.47 E/W Movements 0.04 0.17 Rt. Turn Component 0.05 0.22 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.59 0.90 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 122 Anaheim / Disney Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 97 0.06 88 0.05 NBT 3 5100 585 0.12 * 1231 0.24 * NBR 0 4 6 SBL 2 3400 299 0.09 * 355 0.10 * SBT 3 5100 575 0.12 839 0.17 SBR 0 49 35 EBL 2 3400 208 0.06 * 139 0.04 * EBT 4 6800 56 0.02 117 0.04 EBR 0 65 140 WBL 0 0 0 WBT 3 5100 240 0.05 * 226 0.04 * WBR 0 2 3 N/S Movements 0.20 0.35 E/W Movements 0.11 0.09 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.36 0.48 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 125 Manchester I-5 SB/ Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 68 0.04 * 68 0.04 NBT 0 0 0.00 0 0.00 * NBR 2 3400 502 0.15 * 281 0.08 * SBL 2 3400 127 0.04 320 0.09 * SBT 2 3400 577 0.17 * 90 0.03 SBR 1 1700 14 0.01 7 0.00 EBL 0 0 * 0 * EBT 3 5100 1329 0.26 1763 0.35 EBR 2 3400 1082 0.32 * 913 0.27 WBL 2 3400 133 0.04 144 0.04 WBT 3 5100 2030 0.40 * 3362 0.66 * WBR 0 0 0 N/S Movements 0.21 0.09 E/W Movements 0.40 0.66 Rt. Turn Component 0.09 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.74 0.80 LEVEL OF SERVICE (LOS) C C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 126 Anaheim Way / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 614 0.18 * 893 0.26 * NBT 2 3400 167 0.05 447 0.13 NBR 1 1700 205 0.12 338 0.20 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 2 3400 116 0.03 153 0.04 EBT 3 5100 1931 0.38 * 2175 0.43 * EBR 0 0 0 WBL 0 0 * 0 * WBT 3 5100 1567 0.31 1785 0.35 WBR 2 3400 363 0.11 695 0.20 N/S Movements 0.18 0.26 E/W Movements 0.38 0.43 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.61 0.74 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 143 Lewis / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 8 0.00 72 0.04 * NBT 2 3400 1 0.00 * 31 0.02 NBR 0 1 22 SBL 1 1700 198 0.12 * 81 0.05 SBT 2 3400 37 0.10 69 0.08 * SBR 0 291 213 EBL 2 3400 298 0.09 * 390 0.11 * EBT 4 6800 1972 0.29 2143 0.32 EBR 0 32 23 WBL 2 3400 11 0.00 19 0.01 WBT 4 6800 1568 0.24 * 2535 0.39 * WBR 0 66 109 N/S Movements 0.12 0.13 E/W Movements 0.33 0.50 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.49 0.68 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 144 Manchester / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 * 0 NBT 0 0 0.00 0 0.00 * NBR 0 0 0 SBL 2 3400 662 0.19 338 0.10 * SBT 3 5100 1034 0.23 * 302 0.10 SBR 0 153 189 EBL 0 0 0 * EBT 3 5100 662 0.13 * 849 0.17 EBR 1 1700 581 0.34 * 335 0.20 * WBL 2 3400 115 0.03 * 122 0.04 WBT 3 5100 486 0.10 1115 0.22 * WBR 0 0 0 N/S Movements 0.23 0.10 E/W Movements 0.16 0.22 Rt. Turn Component 0.21 0.03 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.66 0.40 LEVEL OF SERVICE (LOS) B A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 145 Anaheim Way/ Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 139 0.08 * 228 0.13 NBT 2 3400 83 0.02 545 0.16 * NBR 0 1 1 SBL 0 0 0 * SBT 0 0 0.00 * 0 0.00 SBR 0 0 0 EBL 2 3400 130 0.04 200 0.06 * EBT 3 5100 1124 0.22 * 1027 0.20 EBR 0 0 0 WBL 0 0 * 0 WBT 3 5100 463 0.09 1019 0.20 * WBR 1 1700 317 0.19 * 522 0.31 * N/S Movements 0.08 0.16 E/W Movements 0.22 0.26 Rt. Turn Component 0.10 0.11 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.45 0.58 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 160 State College / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 47 0.01 * 213 0.06 NBT 3 5100 437 0.09 1072 0.21 * NBR 1 1700 138 0.08 237 0.14 SBL 2 3400 323 0.09 411 0.12 * SBT 3 5100 1080 0.21 * 716 0.14 SBR 1 1700 354 0.21 378 0.22 EBL 2 3400 397 0.12 303 0.09 * EBT 4 6800 1874 0.30 * 1857 0.28 EBR 0 160 61 WBL 2 3400 691 0.20 * 271 0.08 WBT 4 6800 1324 0.22 2413 0.41 * WBR 0 168 408 N/S Movements 0.23 0.33 E/W Movements 0.50 0.50 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.78 0.88 LEVEL OF SERVICE (LOS) C D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 161 State College / Sportstown Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 113 0.07 * 265 0.16 * NBT 3 5100 386 0.13 990 0.23 NBR 0 275 169 SBL 2 3400 255 0.08 56 0.02 SBT 3 5100 1725 0.34 * 1007 0.20 * SBR 0 0 0 EBL 1 1700 0 0.00 0 0.00 EBT 1 1700 58 0.20 * 42 0.12 * EBR 0 280 168 WBL 1 1700 70 0.04 * 327 0.19 * WBT 1 1700 19 0.02 70 0.27 WBR 0 11 380 N/S Movements 0.40 0.35 E/W Movements 0.24 0.32 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.69 0.72 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 162 State College / Gene Autry Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 39 0.01 * 89 0.03 NBT 3 5100 694 0.14 1699 0.33 * NBR 1 1700 781 0.46 * 624 0.37 SBL 2 3400 10 0.00 3 0.00 * SBT 3 5100 2059 0.41 * 1247 0.27 SBR 0 28 143 EBL 2 3400 158 0.05 62 0.02 EBT 3 5100 211 0.09 * 195 0.05 * EBR 0 230 74 WBL 2 3400 265 0.08 * 896 0.26 * WBT 1 1700 85 0.05 403 0.24 WBR 0 2 6 N/S Movements 0.42 0.33 E/W Movements 0.16 0.32 Rt. Turn Component 0.25 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.88 0.70 LEVEL OF SERVICE (LOS) D B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 163 State College / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 164 0.05 * 238 0.07 NBT 4 6800 930 0.15 1381 0.26 * NBR 0 100 394 SBL 2 3400 469 0.14 220 0.06 * SBT 4 6800 1712 0.29 * 1346 0.21 SBR 0 227 104 EBL 2 3400 150 0.04 522 0.15 * EBT 3 5100 1004 0.22 * 916 0.20 EBR 0 117 86 WBL 2 3400 511 0.15 * 609 0.18 WBT 3 5100 762 0.15 1674 0.33 * WBR 1 1700 118 0.07 520 0.31 N/S Movements 0.33 0.33 E/W Movements 0.37 0.48 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.75 0.86 LEVEL OF SERVICE (LOS) C D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 170 Howell / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 8 0.00 * 183 0.11 * NBT 1 1700 5 0.00 45 0.03 NBR 1 1700 6 0.00 199 0.12 SBL 2 3400 293 0.09 * 259 0.08 * SBT 0.5 850 39 0.05 6 0.01 SBR 1.5 2550 401 0.16 654 0.26 EBL 2 3400 69 0.02 * 418 0.12 * EBT 3 5100 1149 0.24 1153 0.23 EBR 0 53 19 WBL 2 3400 181 0.05 87 0.03 WBT 3 5100 1392 0.32 * 1869 0.39 * WBR 0 236 139 split phasing N/S Movements 0.09 0.18 E/W Movements 0.34 0.52 Rt. Turn Component 0.05 0.06 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.53 0.81 LEVEL OF SERVICE (LOS) A D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 171 Sportstown / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 395 0.12 * 902 0.27 * NBT 0.5 850 1 0.00 15 0.02 NBR 1.5 2550 78 0.03 205 0.08 SBL 1 1700 97 0.06 * 131 0.08 * SBT 1 1700 9 0.01 10 0.01 SBR 1 1700 67 0.04 67 0.04 EBL 2 3400 113 0.03 * 189 0.06 * EBT 3 5100 1216 0.24 1716 0.34 EBR 1 1700 756 0.44 * 699 0.41 WBL 2 3400 406 0.12 423 0.12 WBT 3 5100 1715 0.34 * 2223 0.44 * WBR 1 1700 161 0.09 67 0.04 split phasing N/S Movements 0.17 0.34 E/W Movements 0.37 0.49 Rt. Turn Component 0.09 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.68 0.88 LEVEL OF SERVICE (LOS) B D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 172 Rampart / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 82 0.05 150 0.09 NBT 1 1700 121 0.07 * 180 0.11 * NBR 1 1700 465 0.27 * 568 0.33 * SBL 1 1700 157 0.09 * 399 0.23 * SBT 1 1700 51 0.05 152 0.13 SBR 0 29 71 EBL 1 1700 60 0.04 53 0.03 * EBT 3 5100 1004 0.20 * 898 0.18 EBR 1 1700 140 0.08 61 0.04 WBL 1 1700 100 0.06 * 33 0.02 WBT 3 5100 862 0.17 1147 0.22 * WBR 1 1700 230 0.14 212 0.12 N/S Movements 0.16 0.34 E/W Movements 0.26 0.26 Rt. Turn Component 0.17 0.23 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.64 0.87 LEVEL OF SERVICE (LOS) B D ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 177 SR-57 SB Ramps / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 507 0.30 * 192 0.11 * SBT 0 0 0.00 0 0.00 SBR 2 3400 1261 0.37 * 792 0.23 * EBL 0 0 * 0 * EBT 3 5100 1144 0.22 1457 0.29 EBR (free) 10 17000 334 0.02 341 0.02 WBL 0 0 0 WBT 3 5100 1372 0.27 * 1569 0.31 * WBR (free) 10 17000 232 0.01 576 0.03 N/S Movements 0.30 0.11 E/W Movements 0.27 0.31 Rt. Turn Component 0.07 0.12 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.69 0.59 LEVEL OF SERVICE (LOS) B A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 178 SR-57 NB Ramps / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1.5 2550 628 0.25 * 771 0.30 * NBT 0 0 0.00 0 0.00 NBR 1.5 2550 392 0.15 568 0.22 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 * 0 * EBT 3 5100 1128 0.22 1117 0.22 EBR (free) 10 17000 477 0.03 483 0.03 WBL 0 0 0 WBT 3 5100 1155 0.23 * 1366 0.27 * WBR (free) 10 17000 371 0.02 736 0.04 N/S Movements 0.25 0.30 E/W Movements 0.23 0.27 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.52 0.62 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 179 SR-57 SB Ramps / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 0 0 0 NBT 0 0 0.00 * 0 0.00 * NBR 0 0 0 SBL 1 1700 405 0.24 * 305 0.18 * SBT 0 15 0.00 0 0.00 SBR 2 3400 592 0.17 667 0.20 * EBL 0 0 0 EBT 2 3400 930 0.27 * 1104 0.32 * EBR (free) 1 1700 129 0.08 278 0.16 WBL 1 1700 206 0.12 * 354 0.21 * WBT 2 3400 717 0.21 1449 0.43 WBR (free) 0 0 0 N/S Movements 0.24 0.18 E/W Movements 0.39 0.53 Rt. Turn Component 0.00 0.02 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.68 0.78 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 180 SR-57 NB Ramps / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 157 0.09 * 104 0.06 * NBT 0 0 0.00 0 0.00 NBR 2 3400 496 0.15 * 108 0.03 SBL 0 0 0 SBT 0 0 0.00 * 0 0.00 * SBR 0 0 0 EBL 0 0 0 * EBT 2 3400 1143 0.34 * 883 0.26 EBR 2 3400 241 0.07 439 0.13 WBL 0 0 * 0 WBT 2 3400 620 0.18 1366 0.40 * WBR (free) 10 17000 141 0.01 422 0.02 N/S Movements 0.09 0.06 E/W Movements 0.34 0.40 Rt. Turn Component 0.05 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.53 0.51 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 183 Douglass / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 185 0.05 644 0.19 * NBT 0.5 850 40 0.05 * 123 0.14 NBR 1.5 2550 225 0.09 676 0.27 SBL 2 3400 349 0.10 * 283 0.08 SBT 0.5 850 58 0.07 65 0.08 * SBR 1.5 2550 131 0.05 295 0.12 EBL 2 3400 195 0.06 293 0.09 EBT 3 5100 1241 0.24 * 1045 0.20 * EBR 1 1700 87 0.05 78 0.05 WBL 2 3400 467 0.14 * 526 0.15 * WBT 4 6800 877 0.14 1334 0.25 WBR 0 106 343 split phasing N/S Movements 0.16 0.27 E/W Movements 0.38 0.36 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.59 0.68 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 257 Market / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 382 0.22 * 315 0.19 * NBT 1 1700 22 0.05 26 0.07 NBR 0 61 85 SBL 1 1700 51 0.03 173 0.10 SBT 1 1700 9 0.02 * 28 0.07 * SBR 0 29 88 EBL 1 1700 153 0.09 150 0.09 EBT 4 6800 1925 0.31 * 1638 0.29 * EBR 0 194 367 WBL 1 1700 77 0.05 * 225 0.13 * WBT 4 6800 1107 0.17 2161 0.33 WBR 0 48 70 N/S Movements 0.25 0.25 E/W Movements 0.36 0.43 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.65 0.73 LEVEL OF SERVICE (LOS) B C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 258 Gene Autry / Market Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 49 0.03 * 99 0.06 * NBT 1 1700 32 0.04 53 0.05 NBR 0 33 27 SBL 1 1700 90 0.05 54 0.03 SBT 1 1700 41 0.08 * 53 0.13 * SBR 0 101 172 EBL 1 1700 127 0.07 206 0.12 * EBT 3 5100 453 0.10 * 504 0.12 EBR 0 47 86 WBL 1 1700 12 0.01 * 24 0.01 WBT 3 5100 121 0.03 605 0.13 * WBR 0 32 71 N/S Movements 0.11 0.19 E/W Movements 0.11 0.25 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.27 0.49 LEVEL OF SERVICE (LOS) A A ICU LOS 0.01 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 259 State College / Connector Street Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 33 0.02 * 46 0.03 NBT 4 6800 784 0.12 1929 0.28 * NBR 0 11 8 SBL 1 1700 59 0.03 61 0.04 * SBT 4 6800 2235 0.33 * 1330 0.21 SBR 0 40 115 EBL 1 1700 75 0.04 * 81 0.05 * EBT 1 1700 2 0.03 1 0.02 EBR 0 56 37 WBL 1 1700 7 0.00 25 0.01 WBT 1 1700 1 0.02 * 2 0.05 * WBR 0 30 90 N/S Movements 0.35 0.32 E/W Movements 0.06 0.10 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.47 0.47 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 261 Orangewood / Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 77 0.05 * 115 0.07 * NBT 1 1700 1 0.03 1 0.06 NBR 0 54 94 SBL 1 1700 17 0.01 59 0.03 SBT 1 1700 1 0.02 * 2 0.05 * SBR 0 27 83 EBL 1 1700 44 0.03 48 0.03 * EBT 3 5100 1141 0.23 * 782 0.17 EBR 0 47 78 WBL 1 1700 79 0.05 * 76 0.04 WBT 3 5100 1048 0.21 1804 0.36 * WBR 0 44 37 N/S Movements 0.06 0.12 E/W Movements 0.28 0.39 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.39 0.56 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 262 State College / Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 126 0.04 * 94 0.03 * NBT 4 6800 706 0.12 1596 0.25 NBR 0 132 134 SBL 2 3400 18 0.01 24 0.01 SBT 4 6800 2429 0.36 * 1597 0.24 * SBR 0 24 18 EBL 2 3400 18 0.01 48 0.01 EBT 1 1700 2 0.00 * 4 0.00 * EBR 1 1700 103 0.06 * 182 0.11 * WBL 1 1700 105 0.06 * 174 0.10 * WBT 1 1700 4 0.00 3 0.00 WBR 1 1700 25 0.01 * 49 0.03 * N/S Movements 0.40 0.27 E/W Movements 0.06 0.10 Rt. Turn Component 0.03 0.10 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.54 0.52 LEVEL OF SERVICE (LOS) A A ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 301 Main / Katella Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 70 0.02 * 276 0.08 NBT 2 3400 247 0.07 551 0.16 * NBR 1 1700 187 0.11 250 0.15 SBL 2 3400 92 0.03 194 0.06 * SBT 2 3400 577 0.17 * 303 0.09 SBR 1 1700 254 0.15 183 0.11 EBL 2 3400 101 0.03 223 0.07 EBT 3 5100 920 0.18 * 1606 0.31 * EBR 1 1700 236 0.14 138 0.08 WBL 2 3400 239 0.07 * 171 0.05 * WBT 3 5100 918 0.18 1377 0.27 WBR 1 1700 224 0.13 182 0.11 N/S Movements 0.19 0.22 E/W Movements 0.25 0.37 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.49 0.63 LEVEL OF SERVICE (LOS) A B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 302 Eckhoff / Orangewood Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 66 0.04 * 94 0.06 NBT 2 3400 69 0.02 73 0.02 * NBR 1 1700 36 0.02 45 0.03 SBL 1 1700 16 0.01 134 0.08 * SBT 2 3400 62 0.02 * 116 0.03 SBR 1 1700 312 0.18 717 0.42 * EBL 1 1700 521 0.31 * 249 0.15 * EBT 2 3400 922 0.27 714 0.21 EBR 1 1700 74 0.04 159 0.09 WBL 1 1700 17 0.01 31 0.02 WBT 2 3400 436 0.13 * 845 0.25 * WBR 1 1700 79 0.05 52 0.03 N/S Movements 0.06 0.10 E/W Movements 0.43 0.40 Rt. Turn Component 0.00 0.24 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.54 0.79 LEVEL OF SERVICE (LOS) A C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 303 The City Drive / Chapman Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 2 3400 125 0.04 * 241 0.07 NBT 4 6800 592 0.09 1875 0.28 * NBR 1 1700 51 0.03 407 0.24 SBL 2 3400 32 0.01 21 0.01 * SBT 4 6800 1480 0.22 * 1246 0.18 SBR 1 1700 572 0.34 * 318 0.19 EBL 2 3400 126 0.04 * 527 0.15 * EBT 3 5100 633 0.12 1501 0.29 EBR 1 1700 361 0.21 * 362 0.21 WBL 2 3400 183 0.05 235 0.07 WBT 3 5100 837 0.16 * 1109 0.22 * WBR 1 1700 187 0.11 360 0.21 N/S Movements 0.25 0.28 E/W Movements 0.20 0.37 Rt. Turn Component 0.13 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.64 0.70 LEVEL OF SERVICE (LOS) B B ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 304 Santiago / Meats Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 209 0.12 488 0.29 * NBT 2 3400 586 0.23 * 364 0.23 NBR 0 212 409 SBL 1 1700 400 0.24 * 37 0.02 SBT 2 3400 594 0.25 332 0.13 * SBR 0 257 96 EBL 1 1700 94 0.06 * 118 0.07 EBT 2 3400 106 0.20 798 0.45 * EBR 0 558 743 WBL 1 1700 145 0.09 141 0.08 * WBT 2 3400 951 0.32 * 275 0.08 WBR 0 121 13 N/S Movements 0.47 0.41 E/W Movements 0.37 0.54 Rt. Turn Component 0.00 0.00 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.89 1.00 LEVEL OF SERVICE (LOS) D E ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F ---PAGE BREAK--- INTERSECTION CAPACITY UTILIZATION CALCULATION WORKSHEET PROJECT: Platinum Triangle III ANALYSIS CONDITION: Proposed MLUP w/ Future General Plan Lane Geometrics INTERSECTION: 305 Chapman / Rampart Date 4/5/2005 AM PEAK HOUR PM PEAK HOUR MOVEMENT LANES* CAPACITY VOLUME V/C VOLUME V/C NBL 1 1700 36 0.02 21 0.01 NBT 2 3400 309 0.09 * 140 0.04 * NBR 1 1700 351 0.21 * 574 0.34 * SBL 1 1700 29 0.02 * 74 0.04 * SBT 2 3400 51 0.01 136 0.04 SBR 1 1700 17 0.01 75 0.04 EBL 2 3400 67 0.02 61 0.02 * EBT 3 5100 1246 0.24 * 1310 0.26 EBR 1 1700 2 0.00 35 0.02 WBL 2 3400 284 0.08 * 185 0.05 WBT 3 5100 1484 0.29 2005 0.39 * WBR 1 1700 158 0.09 207 0.12 N/S Movements 0.11 0.08 E/W Movements 0.33 0.41 Rt. Turn Component 0.03 0.24 Yellow Clearance 0.05 0.05 TOTAL CAPACITY UTILIZATION 0.52 0.79 LEVEL OF SERVICE (LOS) A C ICU LOS 0.10 - 0.6 A 0.61 - 0.7 B 0.71 - 0.8 C 0.81 - 0.9 D 0.91 - 1.00 E 1.01 - UP F