Full Text
Page 1 of 2 ELECTRICAL PERMIT FEES EXHIBIT C NEW RESIDENTIAL BUILDINGS: FEE 1. New multi-family residential buildings (apartments, motels, hotels & condominiums) first 100 square foot $ 20.00 per each square foot thereafter $ 0.20 2. New single and two family buildings per first 100 square foot $ 23.00 per each square foot thereafter $ 0.23 3. Garages, carports (attached or detached) parking structures. Other types of residential alterations, additions and modifications to existing buildings refer to the UNIT FEE SCHEDULE below first 1 0 0 square foot. $ 11.00 per each square foot thereafter $ 0.11 TEMPORARY POWER: 1. Temporary service pole or pedestal including meters $ 56.00 2. Temporary sub poles including switches and outlets $ 28.00 UNIT FEE SCHEDULE: RECEPTACLE, SWITCH, AND LIGHTING OUTLETS: 1. First 20 outlets, switches, fixtures, each $ 2.00 2. Additional outlets, each $ 1.00 3. Multi-outlet assemblies each 5, or fraction $ 8.00 4. Pole light and fixture $ 13.00 5. Each additional fixture $ 5.00 6. Theatrical type lighting fixtures, each $ 5.00 RESIDENTIAL APPLIANCES: For fixed residential appliances or receptacle outlets including wall mounted electric ovens; counter mounted cooking tops; electric ranges; self-contained room, console or through wall air conditioners; space heaters; food waste grinders; dishwashers, washing machines; water heaters; clothes dryers; or other motor operated appliances not exceeding one HP in rating, each. (Up to 5) $ 42 .00 Additional residential appliances $ 28.00 NOTE: For other types of air conditioners and motor driven appliances having larger electrical ratings, see Power Apparatus. NON-RESIDENTIAL APPLIANCES: For non-residential appliances and self-contained factory wired appliances not exceeding one horsepower (HP), kilowatt (KW), or Kilovaoltampre (KVA) in rating including medical and dental devices, food, beverage and ice cream cabinets, illuminated show cases, drinking fountains, vending machines, laundry machines, or other similar types of equipment, each. (Up to 5) $ 42 .00 Additional non-residential appliances $ 38.00 POWER APPARATUS (AS LISTED) For motors, generators transformers, rectifiers, converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus. Up to and including1HP $ 56.00 Over 1 HP and not over 10 HP each $ 126.00 Over 10 HP each $ 167.00 BUS WAYS For trolley and plug-in bus ways, each 100 feet or fraction thereof. $ 28.00 NOTE: An additional fee will be required for lighting futures, motors and other appliances that are connected to trolley and plug-in bus ways. ---PAGE BREAK--- Page 2 of 2 FEE $ 220.00 $ 42.00 $ 387.00 $ 84.00 $ 440.00 $ 56.00 $ 56.00 $ 126.00 $ 167.00 $ 251.00 $ 502.00 $ 669.00 $ 837.00 $ 28.00 $ 28.00 $ 28.00 $ 28.00 $ 167.00 $ 42.00 $ 211.00 $ 167.00 SERVICE/METERS/PANELS/DISCONNECT SWITCHES: 1. 600 volt or less and not over 200 amps each 2. 600 volt or less and over 200 amps and up to 500 amps each 3. 600 volts or less and over 500 amps and up to 1000 amps each 4. 600 volts or less and over I 000 amps each 5. 600 volts or over and I 000 amps to 2,500 amps each 6. 600 volts or over and over 2 500 amps each MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS, ELECTRICAL COMPONENTS FOR WHICH A PERMIT IS REQUIRED BUT FOR WHICH NO FEE IS HERE IN SET FORTH: 1. Apparatus or equipment each 2. Conduits and conductors for each 50 feet or fraction thereof 3. Private street lights 4. Under floor raceways - each I 00 feet or fraction thereof NOTE: 1. Minimum permit fee 2. Supplement permit fee 3. Additional electrical plan check service (per hour) 4. Additional electrical inspection service (per hour) ELECTRICAL PERMIT FEES EXHIBIT C (CONTINUED) SIGNS, OUTLINE LIGHTING AND MARQUES: 1. Signs: Channel Letter Wall (non-ilium) Additional signs 2. Signs: Channel Letter Wall (ilium) Additional signs 3. Monument, Pole, Freestanding 4. Alterations to existing signs 5. Relocation of existing signs 5. The above schedule covers most common and straightforward permit types. Fees for project outside of the listed items shall be estimated by the Building Official or Planning and Building Director based on degree of complexity and size. In addition, the Building Official or Planning Director may require a specific amount into a Building Division Depositor's Trust Fund (DTF) account in advance of the Building Division processing a request for regulated activities. These projects will be processed in accordance with procedures outlined in Resolution N o . 20 18- 074 6. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official or Planning and Building Director and/or as specified in Resolution No. 2018-074, Exhibit C. ---PAGE BREAK--- Page 1 of 1 FEE $ 84.00 $ 28.00 $ 20.00 $ 56.00 $ 28.00 $ 42.00 $ 28.00 $ 42.00 $ 84.00 $ 167.00 $ 84.00 $ 56.00 $ 42.00 $ 97.00 $ 167.00 $ 42.00 $ 84.00 $ 97.00 $ 28.00 $ 97.00 $ 54.00 $ 42.00 $ 97.00 $ 84.00 $ 84.00 $ 167.00 $ 42.00 $ 211.00 $ 167.00 NOTE: 1. Minimum permit fee 2. Supplement permit fee 3. Additional mechanical plan check service (per hour) 4. Additional mechanical inspection service (per hour) MECHANICAL PERMIT FEES EXHIBIT D UNIT FEE SCHEDULE 1. Heating appliances, including vent each 2. Residential air circulation outlets (heating or cooling) each (Up to 5) Additional outlet 3. Commercial air distribution system (heating, cooling or ventilation per 1, 000 square feet each 4. Combustion products vent (other than chimney and not included in appliance permit) each 5. Factory built or metal chimney each Additional chimney 6. Compressor or boiler up to 15 HP (includes built-in window types air conditioners) each Over 15 HP 7. Absorption unit each 8 . Air handling unit (heating, cooling or ventilation supply) each 9 . Evaporative cooler (other than portable) each 1 0. Ventilation fans to 300 CFM on single duct (including dryer exhaust duct) each 11. Ventilation fans 30 I CFM and over each 12 Commercial hood (including ducts) each 13 Heating or cooling coils (not part of factory assembled unit) each (V.A.V unit, Cooling Tower, evaporative or air cooled condenser) 14 Appliance or piece of equipment regulated by this code but not specifically classed or listed: minimum fee each 15 Gas system 1 to 5 outlets each Gas system each additional outlet over 5 16. Fire dampers, smoke dampers, fire/smoke dampers, each (up to 10) Additional damper 17. Central Vacuum Systems each 18. Yard gas piping 19. Processing, special, or hydronic piping per 1 square feet 20. Miscellaneous Appliance each 5. The above schedule covers most common and straightforward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official or Planning and Building Director based on degree of complexity and size. In addition, the Building Official or Planning Director may require a specific amount into a Building Division Depositor's Trust Fund (DTF) account in advance of the Building Division processing a request for regulated activities. These projects will be processed in accordance with procedures outlined in Resolution No, 2018-074. 6. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official or Planning and Building Director and/or as specified in Resolution 2018-074ꞏ, Exhibit D. ---PAGE BREAK--- Page 1 of 1 FEE $ 42.00 $ 42.00 $ 28.00 $ 56.00 $ 42.00 $ 139.00 $ 69.00 $ 97.00 $ 28.00 $ 251.00 $ 42.00 $ 56.00 $ 97.00 $ 56.00 $ 42.00 $ 5.00 $ 42.00 $ 56.00 $ 42.00 $ 97.00 $ 42.00 $ 84.00 $ 84.00 $ 167.00 $ 167.00 $ 167.00 $ 334.00 $ 502.00 $ 669.00 $ 167.00 $ 334.00 $ 167.00 $ 167.00 $ 167.00 $ 251.00 $ 167.00 $ 167.00 $ 42.00 $ 211.00 $ 167.00 MISCELLANEOUS FIXTURES l EACH): 1. Includes solar panels and solar tanks, water softener/water treatment equipment 2. For each gray water system 3. For initial installation and testing for a reclaimed water system per hour POOL/SPA FEES 1. STRUCTURAL Less than 1 00 square feet. 101 square feet. - 500 square feet. 501 square feet- 1000 square feet. Greater than 1000 square feet. 2. PLAN CHECK (Not required for fiberglass spa): Less than 500 square feet. Greater than 500 square feet. 3. Pool/Spa Pre-Site Inspection 4. PLUMBING (includes all pool piping, except solar) One gas outlet, backwash lines, backwash receptor/p-trap, pool fill line and back flow protection 5. ELECTRICAL Residential Commercial 6. DEMOLITION Including combo utility canning NOTE: 1. Minimum permit fee 2. supplement permit fee 3. Additional plumbing plan check services (per hour) 4. Additional plumbing inspection services (per hour) PLUMBING PERMIT FEES EXHIBIT E UNIT FEE SCHEDULE 1. Each plumbing fixture including water, sump pump, drainage, piping and backwater valve 2. Each building SEWER and each trailer space sewer: 1st 100 square feet Each additional 1 00 square feet 3. Abandonment/close sewer (including private sewage disposal system) 4. Rainwater system - (per drain inside building) 5. Each private sewage disposal system 6. Each water heater and/or vent 7. Each gas-piping system of 1 to 5 outlets 8. Each additional gas piping system outlet, per outlet 9. Each medical gas system of 1 to 5 inlets/outlets 1 0. Each additional medical gas inlets/outlets 11 Each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as a fixture traps. 12. For each installation, alteration or repair of water piping and/or water treating equipment each 13. For each repair or alteration of drainage or vent piping each fixture 14. For atmospheric type vacuum breakers (Lawn Sprinklers): 1 to 5 Over 5, each 15_ For each backflow protective device other than atmospheric type vacuum breakers: 2 inch diameter and smaller Over 2 inch diameter 16. Building piping water service per 100 feet I 7 Gas yard piping 18 Boiler up to 15 hp Boiler over 15 hp 5. The above schedule covers most common and straightf o r w a r d permit types. Fees for projects outside of the listed i tems shall be estimated by the Building Official or Planning and Building Director based on degree of complexity and size. In addition, the Building Official or Planning and Building Director may require a specific amount into a Building Division Depositor’s Trust Fund (DTF) account in advance of the Building Division processing a request for regulated activities. These projects will be processed in accordance with procedures outlined in Resolution N o . 2018-074 6. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official or Planning and Building Director and/or as specified in Resolution 2018ꞏ074 , Exhibit E .