← Back to Anaheim, CA

Document Anaheim_doc_e61ca4b069

Full Text

200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax www.anaheim.net/building AUG I 2019 B705 CITY OF ANAHEIM PLANNING DEPARTMENT BUILDING DIVISION ELECTRICAL PERMIT APPLICATION DATE: PROJECT ADDRESS: DESCRIBE WORK TO BE DONE: WORK BEING DONE IN CONJUCTION WITH BUILDING PERMIT PRINT YOUR NAME: I am the:  Property Owner  Contractor* Employee of*:  Owner  Contractor *Verification of Worker’s Comp. Required (including Carrier, Policy # and Expiration Date) PROPERTY OWNER: Name: Address: Phone Number: E-mail: CONTRACTOR: Co. Name: Address: City: Phone Number: E-mail: State License City License WORKER’S COMPENSATION CERTIFICATE: Policy Carrier: Policy Expiration  Exempt, No Employees WRITE QUANTITY In Box Next to the Item(s) To Be Included In Permit. METER/SWITCH GEAR TEMPORARY POWER Fee Quantity SUB PANELS Fee Quantity Sub Total Under 600 V, up to 200 amps $126.00 Under 600 V, up to 200 amps $126.00 Under 600 V, over 200 amps to 500 amps $167.00 Under 600 V, over 200 amps to 500 amps $167.00 Under 600 V, over 500 amps to 1000 amps $251.00 Under 600 V, over 500 amps to 1000 amps $251.00 Under 600 V, over 1000 amps $502.00 Under 600 V, over 1000 amps $502.00 Over 600 V, over 1000 amps to 2500 amps $669.00 Over 600 V, over 1000 amps to 2500 amps $669.00 Over 600 V, over 2500 amps $837.00 Over 600 V, over 2500 amps $837.00 Temp Power pole/pedestal (includes meter) $56.00 Sub – pole (includes outlets) $28.00 (Continued Next Page) ---PAGE BREAK--- 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax www.anaheim.net/building PAGE 2 OF 2 B705 FIXTURES Fee Quantity FIXTURES Fee Quantity Sub Total Receptacles, switches, lights – first 20 (each) $2.00 Pole light with one fixture $13.00 Receptacles, switches, lights – over 20 (each) $1.00 Additional light per pole $5.00 One or two family, new or total rewire – first 100 sq. ft. $23.00 Private street light $28.00 One or two family, new or total rewire per each sq. ft. thereafter. $0.23 Conduit (non-wired) per 50 feet $28.00 Multi-family, new or total rewire – first 100 sq. ft. $20.00 Theatrical type lighting fixture $5.00 Multi-family, new or total rewire per sq. ft. per each sq. ft. thereafter. $0.20 Under floor raceways per 100 ft. $28.00 Garage/carport, new or total rewire – first 100 sq. ft. $11.00 Multi-outlet assemblies each 5’ (Commercial) $8.00 Garage/carport, new or total rewire per sq. ft. per each sq. ft. thereafter. $0.11 Plug-in bus way/trolley per 100 ft. $28.00 Apparatus or equipment not listed $28.00 MOTORS/DISCONNECTS Fee Quantity GENERATORS TRANSFORMERS P.V. INVERTERS Fee Quantity Sub Total Factory Wired Appliance- up to 1 h.p. – first 5 (each) $42.00 Up to 1 hp – up to 1 kva $56.00 Additional Factory Wired Appliance (each) $28.00 Over 1 to 10 hp –1 to 75 kva $126.00 Up to 1 h.p. $56.00 Over 10 h.p. – over 75 kva $167.00 Over 1 to 10 h.p. $126.00 E.V. Charger $126.00 Over 10 h.p. $167.00 Micro-Inverter String of 30 each $126.00 TOTAL Minimum Permit Fee $167.00 Supplemental Permit Fee $53.00 Planning Plan Check Fee assessed when applicable MAXIMUM CREDIT CARD TRANSACTION IS $5,000 The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size. In addition, the Building Official may require a specific amount into a Building Division Depositor's Trust Fund (DTF) account in advance of the Building Division processing a request for regulated activities. These projects will be processed in accordance with procedures outlined in Resolution No. 2018-074. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official and/or as specified in Resolution 2018-074.