SEIR No. 339 City of Anaheim• Page 3-1 3. Project Description 3.1 PROJECT LOCATION The Platinum Triangle consists of approximately 820 acres and is located at the confluence of Interstate 5 (I-5) and State Route 57 (SR-57), in the City of Anaheim (“City”) in Orange County, California. As shown in Figure 3-1, Regional Location, it is located within the south-central portion of the City. As shown in Figure 3-2, Local Vicinity Map, the Platinum Triangle is located generally east of I-5, west of the Santa Ana River channel and SR-57, south of the Southern California Edison easement, and north of the City limit. The Platinum Triangle encompasses the Angel Stadium of Anaheim, the Honda Center, the Grove of Anaheim, the Anaheim Amtrak/Metrolink Station, and surrounding residential and mixed use development, light industrial buildings, industrial parks, distribution facilities, offices, hotels, restaurants, and retail development. An aerial photograph of the project area is shown in Figure 3-3, Aerial Photograph. 3.2 STATEMENT OF OBJECTIVES The following objectives have been established for the Platinum Triangle project and will aid decision makers in their review of the project and associated environmental impacts: • Provide for a wide range of housing opportunities in close proximity to jobs and a regional transportation center. • Provide a mix of quality, high-density urban housing that is integrated into the area through carefully maintained pedestrian streets, transit connections, and arterial access. • Create a development plan that encourages residents of Anaheim to work and shop in close proximity to their homes, minimizing use of their automobiles. • Encourage extensive office development along the highly visible periphery of the area to provide a quality employment center. • Foster mixed-use development that serves to reduce vehicle miles traveled by promoting alternatives to driving, such as walking, biking, and use of mass transit. • Provide on-site open space and recreation amenities that further enhance the mixed-use environment of the area for both residents and employees working in the Platinum Triangle. • Encourage high density mixed use development that is synergistic with the entertainment and employment uses already established in the Platinum Triangle. • Maximize opportunities to increase tax increment received from the Redevelopment Project Area. ---PAGE BREAK--- 3. Project Description Page 3-2 • The Planning Center August 2010 • Allow for the continued development of the Platinum Triangle and accommodate future market demand through amendments to the General Plan and Platinum Triangle Master Land Use Plan. 3.3 PROJECT CHARACTERISTICS 3.3.2 Project Background Since 1996, the Anaheim City Council has approved several actions relating to the area encompassed by the Platinum Triangle. On May 30, 1996, the Anaheim Planning Commission certified Final Environmental Impact Report (FEIR) No. 320 (State Clearinghouse No. 95041029) and adopted Area Development Plan No. 120 for the portion of the Stadium property associated with the Sportstown Development. Area Development Plan No. 120 entitled a total of 119,543 seats for new and/or renovated stadiums, 750,000 square feet of urban entertainment/retail uses, a 500-room hotel (550,000 square feet), a 150,000-square-foot exhibition center, 250,000 square feet of office development and 15,570 on-site parking spaces. The Grove of Anaheim, the renovated Angel Stadium of Anaheim, and the Stadium Gateway Office Building were developed/renovated under this plan. On March 2, 1999, the Anaheim City Council adopted the Anaheim Stadium Area Master Land Use Plan (MLUP). The boundaries for this MLUP were generally the same as those for the Platinum Triangle, with the exception that this MLUP included 15 acres adjacent to I-5 that are not a part of the current Platinum Triangle boundaries. As part of the approval process for the Anaheim Stadium Area MLUP, the City Council also certified FEIR No. 321 (State Clearinghouse No. 9611041) and adopted Mitigation Monitoring Program No. 106. Development within the Anaheim Stadium Area was implemented through the Sports Entertainment (SE) Overlay Zone, which permitted current uses to continue or expand within the provisions of the existing zoning, while providing those who may want to develop sports, entertainment, retail, and office uses with standards appropriate to those uses, including increased land use intensity. Implementation of this Overlay Zone was projected to result in a net loss of 491,303 square feet of industrial space and increases of 1,871,285 square feet of new office space, 452,026 square feet of new retail space, and 991,603 square feet of new hotel space. Projects that were developed under the SE Overlay Zone included the Ayers Hotel, the Arena Corporate Center, and the Westwood School of Technology. On May 25, 2004, the Anaheim City Council approved a comprehensive citywide General Plan and Zoning Code Update, which included a new vision for the Platinum Triangle. The General Plan Update changed the General Plan designations within the project area from Commercial Recreation and Business Office/Mixed Use/Industrial to Mixed-Use, Office-High, Office-Low, Industrial, Open Space and Institutional to provide opportunities for existing uses to transition to mixed-use, residential, office, and commercial uses. The General Plan Update also established the overall maximum development intensity for the Platinum Triangle to be up to 9,175 dwelling units, 5,000,000 square feet of office space, 2,044,300 square feet of commercial uses, industrial development at a maximum floor area ratio (FAR) of 0.50, and institutional development at a maximum FAR of 3.0. In addition, the square footage/seats allocated to the existing Honda Center and all of the development intensity entitled by Area Development Plan No. 120 were incorporated into the Platinum Triangle Mixed-Use land use designation. Final EIR No. 330 (State Clearinghouse No. [PHONE REDACTED]), which was prepared for the General Plan and Zoning Code Update and associated actions, analyzed the above development intensities on a citywide impact ---PAGE BREAK--- 3. Project Description SEIR No. 339 The Planning Center • Figure 3-1 Regional Location Orange County Line* Orange County Metrolink Routes * Amtrak Pacific Surfliner shares this route. Inland Empire-Orange County Line 91 Line (Riverside/Fullerton/Downtown LA) 405 405 5 10 15 15 10 605 * SITE 60 60 91 91 91 57 90 241 241 71 55 5 73 1 1 22 74 261 133 19 39 Anaheim Fullerton Orange Placentia 0 7 Scale (Miles) ---PAGE BREAK--- 3. Project Description Page 3-4 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- 3. Project Description SEIR No. 339 The Planning Center • Figure 3-2 Local Vicinity Map 5 57 22 Orange Anaheim Garden Grove Santa Ana Orangewood Av Katella Av Gene Autry Way Ball Rd Chapman Av Lampson Av Garden Grove Bl Cerritos Av Harbor Bl Lewis St State College Bl Sunkist St Anaheim Bl East St Batavia St Glassell St Main St Angel Stadium of Anaheim Santa Ana River SCE Easement The Platinum Triangle The Platinum Triangle Honda Center 0 3,100 Scale (Feet) ---PAGE BREAK--- 3. Project Description Page 3-6 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- Source: Google Earth Pro 2009 3. Project Description SEIR No. 339 The Planning Center • Figure 3-3 Aerial Photograph 57 22 Orange Orange Garden Grove Garden Grove Anaheim Anaheim Orangewood Av Orangewood Av Katella Av Katella Av Cerritos Av Cerritos Av Ball Rd Ball Rd Chapman Av Chapman Av Harbor Bl Harbor Bl Lewis St Lewis St State College Bl State College Bl Sunkist St Sunkist St Anaheim Bl Anaheim Bl East St East St Batavia St Batavia St Main St Main St Gene Autry Way Gene Autry Way Angel Stadium of Anaheim Angel Stadium of Anaheim The Platinum Triangle The Platinum Triangle Honda Center Honda Center Santa Ana River Santa Ana River 5 57 0 2,600 Scale (Feet) The Block The Block ---PAGE BREAK--- 3. Project Description Page 3-8 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- 3. Project Description SEIR No. 339 City of Anaheim• Page 3-9 level and adopted mitigation monitoring programs, including an Updated and Modified Mitigation Monitoring Plan No. 106 for the Platinum Triangle. In order to provide the implementation tools necessary to realize the City’s new vision for the Platinum Triangle, on August 17, 2004, the City Council replaced the Anaheim Stadium Area MLUP with the Platinum Triangle MLUP (PTMLUP), replaced the SE Overlay Zone with the Platinum Triangle Mixed Use (PTMU) Overlay Zone, approved the form of the Standardized Platinum Triangle Development Agreement and approved associated zoning reclassifications. Under these updated zoning regulations, property owners desiring to develop under the PTMU Overlay Zone provisions are required to enter into a standardized Development Agreement with the City of Anaheim. Ordinances associated with the PTMU Overlay Zone and the approved zoning reclassifications became effective September 23, 2004. On October 25, 2005, the Anaheim City Council adopted and certified the Final Subsequent EIR (FSEIR) No. 332 (State Clearinghouse No. [PHONE REDACTED]) including an Updated and Modified Mitigation Monitoring Plan No. 106A for the PTMLUP and associated actions, which utilized the certified FEIR No. 321 (adopted for the Anaheim Stadium MLUP, as discussed above) and Mitigation Monitoring Program No. 106. At the present time, FSEIR No. 332 serves as the primary environmental document for subsequent land use actions within the Platinum Triangle, including necessary infrastructure improvements and all local discretionary approvals requested to implement the PTMLUP, consistent with Section 15162 of the CEQA Guidelines. The General Plan Amendment associated with FSEIR No. 332 increased the allowable development intensity within the Platinum Triangle to 9,500 residential units; 5,000,000 square feet of office uses; and 2,254,400 square feet of commercial uses. Since the approval and certification of FSEIR No. 332, the majority of the permitted development intensity on private properties analyzed by the SEIR has been either developed, is under construction or has been designated for development under approved Development Agreements. In addition, City Council has approved two addendums to FSEIR No. 332 in conjunction with requests to increase the Platinum Triangle intensity by 67 residential units; 55,550 square feet of office development; and, 10,000 square feet of commercial uses. A project EIR has also been approved to increase the allowable development intensity by an additional 699 residential units to bring the total allowable development intensity within the Platinum Triangle to up to 10,266 residential units; 5,055,550 square feet of office uses; and 2,264,400 square feet of commercial uses. In order to increase the overall densities within the Platinum Triangle to accommodate market demands for increased densities, and to further the project objectives outlines above, in 2007, the City embarked upon a process to adopt a General Plan Amendment; amendments to the PTMLUP, PTMU Overlay Zone, and the Platinum Triangle Standardized Development; and related zoning reclassifications to increase the development intensities within the Platinum Triangle to up to 18,363 residential units; 5,657,847 square feet of commercial uses; 16,819,015 square feet of office uses; and 1,500,000 square feet of institutional uses (hereafter, the “Platinum Triangle Expansion Project”). As required by law, the City prepared an environmental impact report in connection with the Platinum Triangle Expansion Project. The Draft Subsequent Environmental Impact Report (DSEIR) for the Platinum Triangle Expansion Project, known as DSEIR No. 334 and was first circulated for a 45-day public review period from July 12, 2007 to August 27, 2007. On October 4, 2007, the City released the DSEIR No. 334 for an additional 45-day public review. The recirculated DSEIR No. 334 contained minor revisions to the Project Description and additional traffic information based on comments received from the City of Orange and California Department of Transportation (Caltrans). Other minor revisions to the DSEIR were made based on other comments received on the previously circulated DSEIR No. 334. The recirculated FSEIR No. 334 was approved in December 2007 and reapproved in April 2008. ---PAGE BREAK--- 3. Project Description Page 3-10 • The Planning Center August 2010 However, following the approval of the FSEIR No. 334, a lawsuit was filed by Citizens for Responsible Equitable Environmental Development (CREED) and Orange County Communities Organized for Responsible Development (OCCORD) challenging the adequacy of FSEIR No. 334. In consideration of the City’s exemplary historical record in avoiding CEQA litigation and its commitment to proper environmental review, the City Council repealed the approval of the Platinum Triangle Expansion Project FSEIR No. 334 and various related actions and directed staff to prepare a new subsequent EIR for the project. The City took this direction because the City has very rarely been challenged based on alleged non compliance with CEQA, and because the City desired to assuage any concerns held by the public concerning the adequacy of the previous document. 3.3.2 Description of the Project The City of Anaheim proposes to increase the amount of residential, commercial, office, and institutional development intensities permitted in the Platinum Triangle as shown in Table 3-1. The Proposed Project has reduced the amount of office and commercial square footage and increased the amount of residential units being requested as compared to the previous Platinum Triangle Expansion Project analyzed in FSEIR No. 334. These modifications were made in an effort to improve the overall jobs/housing balance in the Platinum Triangle at build-out, encourage a full range of transit oriented development opportunities for ARTIC, and reduce traffic impacts to the City of Orange. Table 3-1 Proposed Platinum Triangle Development Intensities Land Use Adopted Proposed Increase Residential Units 10,266 18,909 8,643 Commercial Square Feet 2,264,400 4,909,682 2,645,282 Office Square Feet 5,055,550 14,340,522 9,284,972 Institutional Square Feet 0 1,500,000 1,500,000 The Proposed Project would expand the General Plan Mixed Use land use designation within the Platinum Triangle as shown in Figure 3-4 and create two new mixed use districts and expand two existing mixed use districts within PTMU Overlay Zone as shown in Figure 3-5. District development intensity maps that further break down the allocated development in the Platinum Triangle Mixed-Use Districts by sub-areas have also been developed and are included in Appendix I of the SEIR No. 339. Development that occurs within the Platinum Triangle is implemented through the processing of subdivision maps and the submittal of plans for building permits unless a conditional use permit or a variance are required. Development in the PTMU Overlay Zone also requires approval of a Master Site Plan and/or a Final Site Plan and a Development Agreement. Specifically, the Proposed Project includes technical refinements and clarifications to the documents that govern and regulate development within the Platinum Triangle—the General Plan, the PTMLUP, and the PTMU Overlay Zone. ---PAGE BREAK--- Source: City of Anaheim 3. Project Description SEIR No. 339 The Planning Center • Figure 3-4 Platinum Triangle General Plan Land Use 0 2,400 Scale (Feet) ---PAGE BREAK--- 3. Project Description Page 3-12 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- Source: City of Anaheim 3. Project Description SEIR No. 339 The Planning Center • Figure 3-5 PTMU Overlay Zone Mixed Use Districts 0’ 2,400’ Scale Note: The new Mixed Use boundaries include expansion of the Katella and Orangewood Districts and the addition of the ARTIC and Office Districts. ---PAGE BREAK--- 3. Project Description Page 3-14 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- 3. Project Description SEIR No. 339 City of Anaheim• Page 3-15 Below is a description of the proposed amendments to each of these documents. General Plan A. Amend the Land Use Element (Figure LU-4: Land Use Plan) as shown in Figure 3-4, Platinum Triangle General Plan Land Use, to: a. Redesignate approximately 191 acres from the Office High land use designation to the Mixed Use designation; and b. Redesignate approximately 17 acres from the Institutional land use designation to the Mixed Use designation. c. Reflect a recently constructed park and parks required by approved development agreements. B. Amend the Land Use Element (Table LU-4: General Plan Density Provisions for Specific Areas of the City) as shown in Table 3-2, Existing and Proposed General Plan Density Provisions, to: a. Increase the permitted development intensities in the Platinum Triangle; and b. Remove the FAR (Floor Area Ratio) requirement for Mixed Use development in the Platinum Triangle. Table 3-2 Existing and Proposed General Plan Density Provisions (Table LU-4) Existing Description in Table LU-4 Proposed Description in Table LU-4 Location General Plan Land Use Designation Permitted Density Location General Plan Land Use Designation Permitted Density Mixed Use Residential 18,909 Dwelling Units Commercial 4,909,682 Square Feet Office 9,862,166 Square Feet Mixed Use Up to 10,266 dwelling units at densities up to 100 dwelling units per acre; up to 3,265,000 s.f. of office development; up to 2,254,400 s.f. of commercial development at a maximum FAR of 0.40. Institutional 1,500,000 Square Feet Office-High and Office-Low 4,478,356 Square Feet* Institutional 3.0 FAR Industrial 0.5 FAR Open Space 0.1 FAR The Platinum Triangle Area Office High and Office Low Up to 1,790,550 s.f. of office development and up to 10,000 s.f. of commercial development and a maximum FAR of 0.50 for properties designated Office-Low The Platinum Triangle *The maximum FAR for properties designated Office-Low is 0.5; the maximum FAR for properties designated Office-High is 2.0. C. Amend the Circulation Element (Figure C-1: Planned Roadway Network) to modify the designations of streets within the Platinum Triangle (see Figure 3-6, Existing Planned Roadway Network and Figure 3-7, Proposed Planned Roadway Network) : ---PAGE BREAK--- 3. Project Description Page 3-16 • The Planning Center August 2010 a. Katella Avenue between Manchester Avenue and Anaheim Way from 6-lane Major Arterial to 8-lane Stadium b. Douglass Road between Katella Avenue and Cerritos Avenue from Secondary Arterial to 4-lane Primary Arterial; c. Douglass Road between Katella Avenue and SR-57 overpass from Interior Street to Secondary Arterial; d. Rampart Street between Orangewood Avenue and the South City Limits adjacent to the City of Orange from Interior Street to Secondary Arterial; e. West Dupont Drive between Orangewood Avenue and South Dupont Drive from Interior Street to Collector Street; f. South Dupont Drive between West Dupont Drive and West Towne Centre Place from Interior Street to Collector Street; g. South Towne Centre Place between West Towne Centre Place and Rampart Street from Interior Street to Secondary Arterial; h. Lewis Street between Katella Avenue and Cerritos Avenue from Secondary Arterial to 4- lane Primary Arterial; and, i. Cerritos Avenue between State College Boulevard and Douglass Road from Secondary Arterial to 4-lane Primary Arterial. D. Amend the Circulation Element (Figure C-5: Existing and Proposed Bicycle Facilities) to (see Figure 3-8, Existing Bicycle Facilities and Figure 3-9, Proposed Bicycle Facilities) : a. Extend the Class II Bikeway on Orangewood Avenue from east of State College Boulevard to West Dupont Drive; b. Add the Class II Bikeway to West Dupont Drive, South Dupont Drive and West Towne Centre Place to Rampart Street; c. Add the Class II Bikeway to Lewis Street between Katella Avenue and Ball Road; and d. Add the Class II Bikeway to Cerritos Avenue between Anaheim Boulevard and Douglass Road. E. Amend the Green Element (Figure G-1: Green Plan) to reflect a recently constructed park and parks required by approved development agreements (see Figure 3-10, Existing Green Plan and Figure 3-11, Proposed Green Plan). F. Amend the Public Services and Facilities Element (Figure PSF-1: Fire and Police Facilities Map) to reflect the three fire stations proposed for the Platinum Triangle. ---PAGE BREAK--- The Planning Center • Figure 3-6 Existing Planned Roadway Network SEIR No. 339 Source: City of Anaheim 0 1,600 Scale (Feet) 5 57 3. Project Description ---PAGE BREAK--- 3. Project Description Page 3-18 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- The Planning Center • Figure 3-7 Proposed Planned Roadway Network SEIR No. 339 Source: City of Anaheim 0 1,600 Scale (Feet) 5 57 3. Project Description ---PAGE BREAK--- 3. Project Description Page 3-20 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- The Planning Center • Figure 3-8 Existing Bicycle Facilities SEIR No. 339 Source: City of Anaheim 0 1,600 Scale (Feet) 5 57 3. Project Description ---PAGE BREAK--- 3. Project Description Page 3-22 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- The Planning Center • Figure 3-9 Proposed Bicycle Facilities SEIR No. 339 Source: City of Anaheim 0 1,700 Scale (Feet) 5 57 3. Project Description ---PAGE BREAK--- 3. Project Description Page 3-24 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- 3. Project Description The Planning Center • Figure 3-10 Existing Green Plan SEIR No. 339 Source: City of Anaheim 0 1,600 Scale (Feet) 5 57 ---PAGE BREAK--- 3. Project Description Page 3-26 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- The Planning Center • Figure 3-11 Proposed Green Plan SEIR No. 339 Source: City of Anaheim 0 2,000 Scale (Feet) 5 57 3. Project Description ---PAGE BREAK--- 3. Project Description Page 3-28 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- 3. Project Description SEIR No. 339 City of Anaheim• Page 3-29 Platinum Triangle Master Land Use Plan Amend the Platinum Triangle Master Land Use Plan (PTMLUP) as shown in further detail in Appendix I, Proposed Amendments to the Platinum Triangle Master Land Use Plan, to: A. Reflect the proposed General Plan amendments; B. Adjust the boundaries of the PTMU Overlay Zone to create the ARTIC and Office Districts and expand the Katella and Orangewood Districts; C. Distribute the proposed increased development intensities as shown in Table 3-3 and further detailed in Appendix I, Proposed Amendments to the Platinum Triangle Master Land Use Plan. Table 3-3 Proposed PTMU Overlay Zone Development Intensities Acres Residential Units Commercial Square Feet Office Square Feet3 Platinum Triangle District Adopted Proposed Adopted Proposed Adopted Proposed Adopted Proposed Arena 41 41 425 425 100,000 100,000 100,000 100,000 ARTIC1 0 17 0 520 0 358,000 0 2,202,803 Gateway 53 50 2,142 2,949 50,000 64,000 530,000 562,250 Gene Autry 33 33 1,699 2,362 174,100 304,700 100,000 338,200 Katella 99 141 4,250 5,707 630,300 832,614 775,000 2,131,058 Orangewood 4 35 0 1,771 10,000 130,000 590,000 1,402,855 Stadium2 153 153 1,750 5,175 1,300,000 3,120,368 1,760,000 3,125,000 Total Mixed Use 383 470 10,266 18,909 2,264,400 4,909,682 3,855,000 9,862,166 Office 0 121 0 0 0 0 0 4,478,356 Total PTMU Overlay 383 591 10,266 18,909 2,264,400 4,909,682 3,855,000 14,340,522 1 The proposed development intensity includes 1,500,000 square feet of institutional uses. 2 The adopted and proposed development intensities for the Stadium District include 119,543 seats for existing (49,043 seats) and potential (70,500 seats) stadiums. 3 The adopted General Plan allows an additional 1,200,550 square feet of office development within the Platinum Triangle on properties outside of the PTMU Overlay Zone. The Proposed Project expands the PTMU Overlay Zone to encompass these properties. D. Replace Updated and Modified Mitigation Monitoring Program No. 106A with Updated and Modified Mitigation Monitoring Program No. 106C, and, E. Reflect technical refinements and clarifications including, but not limited to, refinements to street cross-sections, density descriptions and exhibits. PTMU Overlay Zone Amend Chapter 18.20 PTMU Overlay Zone of Title 18 of the Anaheim Municipal Code, as shown in further detail in Appendix I, Proposed Amendments to the Platinum Triangle Master Land Use Plan, to: A. Reflect the proposed General Plan and PTMLUP amendments; B. Provide development standards for the ARTIC, Stadium, Arena, and Office Districts; and, ---PAGE BREAK--- 3. Project Description Page 3-30 • The Planning Center August 2010 C. Modify zoning standards, including, but not limited to, vacant lots and setbacks and parking structure requirements for hotels and offices. Zoning Reclassification The Proposed Project includes a request to add the PTMU Overlay Zone to the properties within the new ARTIC and Office Districts and the expanded areas of the Katella and Orangewood Districts. Related Infrastructure Upgrades The Proposed Project also includes upgrades to existing infrastructure to serve the proposed increased intensity of land uses. These upgrades include roadway improvements, including a railroad grade separation project along State College Boulevard, between Katella Avenue and Howell Avenue; sewer upgrades; a new water well; a new electrical substation; natural gas infrastructure improvements; and an additional fire station. These improvements are further discussed in Sections 5.9 and 5.10 and Appendix J. More specific design and location of infrastructure facilities as related to specific development projects would be reviewed as part of subsequent plan approvals tentative tract maps, street improvement plans, storm drain improvement plans, and Caltrans encroachment permits). The necessary on-site infrastructure that would be provided as part of future projects would be constructed by future property owner/developers, the City of Anaheim, and/or the utility provider, as determined by the City of Anaheim and/or other responsible agencies. State College Boulevard Railroad Undercrossing: The AT&SF railroad currently crosses State College Boulevard approximately 250 feet north of Wright Circle within the Platinum Triangle. In order to improve traffic flow and safety, the City of Anaheim is working with the Orange County Transportation Authority (OCTA) on an underpass concept at this location. To accommodate this concept, the State College Boulevard profile requires depression from about 950 feet north to 750 feet south of the railroad crossing. The profiles of Wright Circle and Howell Avenue will need to be adjusted to meet the proposed grade of State College Boulevard. In anticipation of a future railroad grade separation project along State College Boulevard between Katella Avenue and Howell Avenue, a retaining wall was constructed along the southerly right-of-way of Wright Circle and the westerly right-of-way of State College Boulevard adjacent to the Stadium Lofts building. The retaining wall has a maximum height of 14 feet and was designed to be buried during the interim condition until such time that the grade separation project is constructed. The retaining wall design took into consideration the preliminary road profile of the undercrossing from a previous OCTA study and also accounted for a 3:1 landscaped slope from the back of the sidewalk to the face of wall. Portions of the retaining wall adjacent to Wright Circle and State College Boulevard that will be visible from the right-of-way upon completion of the railroad grade separation project were constructed with a decorative brick finish. The location and concept illustration of the grade separation are shown in Figure 3-12. Utilities along State College Boulevard need to be relocated due to the depressed profile of the undercrossing. Existing utilities include a water line, two sewer lines, a storm drain pipe, a gas line, and two underground power conduits. A pump station will be required for pumping stormwater at the sag point. The City has indicated that the pump station for the sewer line is not allowed along State College Boulevard, and that sewer lines need to be relocated within a sewer easement. ---PAGE BREAK--- Source: JMD 2009 3. Project Description SEIR No. 339 The Planning Center • Figure 3-12 State College Boulevard Undercrossing 0 525 Scale (Feet) ---PAGE BREAK--- 3. Project Description Page 3-32 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- 3. Project Description SEIR No. 339 City of Anaheim• Page 3-33 Water Well: A new water well is proposed adjacent to the proposed Fire Station No. 12 between Anaheim Way and Santa Cruz Street south of Stanford Court, as shown on Figure 3-13. The new well will have a capacity between 3,000 and 4,000 gallons per minute (gpm), and equipped at an initial production rate of 1,500 gpm. Discharge piping for the new well will connect to the existing 12-inch diameter main in Anaheim Way and the existing 10-inch diameter main in Santa Cruz Street. The building setback requirements and architectural treatments for the new well facility will blend with proposed Fire Station No. 12. Additional information regarding the water well is provided in Section 5.3. Electrical Substation: An electrical substation is proposed adjacent to the new water well at the corner of Orangewood Avenue and Anaheim Way. Construction of the substation will be by the electrical utility provider. Natural Gas: The Southern California Gas Company has indicated that alterations to the existing system and infrastructure improvements would be required. Future street and infrastructure improvements would be coordinated with the appropriate service providers. 3.4 INTENDED USES OF THIS SUBSEQUENT EIR This DSEIR examines the environmental impacts of the implementation of the Platinum Triangle, which includes, but is not limited to, the approval of subdivision maps, grading permits, street improvement plans, final site plans, development agreements, and other related actions. It is the intent of this DSEIR to enable the City of Anaheim, other responsible agencies, and interested parties to evaluate the environmental impacts of the Proposed Project, thereby enabling them to make informed decisions with respect to the requested actions. The anticipated approvals required for this project are: Lead Agency Action City of Anaheim City Council • Certify Subsequent Environmental Impact Report No. 339 and adopt Updated and Modified Mitigation Monitoring Program No. 106C. • Approve General Plan Amendment No. 2008-00471. • Approve Miscellaneous Case No. 2008-00283 (Amendments to the Platinum Triangle MLUP). • Approve Zoning Code Amendment No. 2008-00074. • Approve Zoning Reclassification No. 2008-00222. • Approve Miscellaneous Case No. 2008-00284 (Water Supply Assessment). • Implementation of the Platinum Triangle Master Land Use Plan subdivision maps, grading permits, street improvement plans, final site plans, development agreement, financial mechanisms including but not limited to assessment districts, etc.). Responsible Agencies Action South Coast Air Quality Management District • Issue necessary air quality permits to implement the project. Regional Water Quality Control Board (Santa Ana Region) • Issue a National Pollutant Discharge Elimination System Permit to allow for the implementation of the project. Orange County Sanitation District • Approval of necessary sewer upgrades to OCSD facilities. City of Orange • Provide necessary street intersection improvements Caltrans • Provide necessary freeway improvements OCTA • Provide necessary freeway improvements ---PAGE BREAK--- 3. Project Description Page 3-34 • The Planning Center August 2010 This page intentionally left blank. ---PAGE BREAK--- Source: City of Anaheim 3. Project Description SEIR No. 339 The Planning Center • Figure 3-13 Fire Station No. 12 and Water Well Location 0 60 Scale (Feet) ---PAGE BREAK--- 3. Project Description Page 3-36 • The Planning Center August 2010 This page intentionally left blank.