← Back to Anaheim, CA

Document Anaheim_doc_ce38c588f7

Full Text

FILENAME: REVISION KEYS: ADDED / REVISED TEXT NEW SHEET CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT - - COMMERCIAL SERVICES METHODS AND REQUIREMENTS CU1500-5 REV2 2 01-14 1 4 CU 1500-5 SCOPE: THIS STANDARD SHOWS THE METHODS AND REQUIREMENTS FOR INSTALLATION OF UNDERGROUND AND OVERHEAD SERVICES IN COMMERCIAL/INDUSTRIAL, AS WELL AS MULTI-UNIT RESIDENTIAL BUILDINGS, UNLESS OTHERWISE SPECIFIED ON THE WORK ORDER DRAWINGS. GENERAL NOTES: A. THIS CONSTRUCTION STANDARD COVERS THE INSTALLATION, CABLE AND CONDUIT REQUIREMENTS FOR COMMERCIAL/INDUSTRIAL, AS WELL AS MULTI-UNIT RESIDENTIAL BUILDINGS, REQUIRING SINGLE PHASE 120/240 VOLTS SERVICE UP TO 600 AMP AND THREE PHASE COMMERCIAL/INDUSTRIAL SERVICES, 120/240, 120/208 & 277/480 FROM 400 AMP TO 4000 AMP. B. FOR ALL UNDERGROUND SERVICES: B.1. CONTRACTOR SHALL FURNISH AND INSTALL ALL TRENCHING, BACKFILL, COMPACTING, CONDUIT AND CABLES FROM ELECTRICAL SERVICE PANEL UP TO THE SECONDARY LEVEL. THE SECONDARY LEVEL COULD BE EITHER TO THE SECONDARY PULL BOX, PAD MOUNTED TRANSFORMER AND/OR SECONDARY RISER POLE. B.2. FOR RISER POLE INSTALLATION THE CITY WILL PROVIDE THE CABLE GRIP, THE STAND OFF BRACKET AND ASSOCIATED HARDWARE. B.3. THE RISER SHALL BE AFFIXED TO STAND OFF BRACKETS ON THE POWER POLE AWAY FROM TRAFFIC. ELECTRICAL ENGINEERING OR ELECTRICAL UTILITIES INSPECTOR WILL DESIGNATE THE EXACT QUADRANT AT THE TIME OF INSTALLATION. B.4. ALL CONDUITS AND CABLES SHALL BE PER TABLES I AND II, AND WORK ORDER DRAWINGS, AND SHALL BE APPROVED BY ELECTRIC UTILITIES INSPECTORS. B.5. ALL CONDUIT RUNS PASSING BENEATH ANY BUILDING SLAB WILL BE OF THE MATERIAL SHOWN IN TABLE I. A MINIMUM OF ONE SPARE CONDUIT WILL BE REQUIRED. SHALL BE IN THE CONDUIT MATERIAL TYPE 1 OR 5 . B.7. THE SWEEPS ARE TO BE ANCHORED AND SECURED TO WITHSTAND THE PULLING TENSIONS REQUIRED FOR INSTALLATION OF CONDUCTORS. B.8. BORING AND INSTALLATION OF GALVANIZED STEEL CONDUIT OR PVC SCHEDULE 80 IS ACCEPTABLE FOR LOCATIONS UNDER CONCRETE SLABS OR LANDSCAPE AREAS. (CHECK WORK ORDER DRAWINGS FOR DIRECTION). C. FOR ALL OVERHEAD SERVICES: C.1. CONTRACTOR SHALL PROVIDE AND INSTALL ALL WIRES, CABLES, AND MATERIAL REQUIRED FROM SERVICE PANEL TO THE POINT OF DELIVERY, DESIGNATED BY THE ELECTRICAL ENGINEERING AND WORK ORDER DRAWING. D. ELECTRICAL DIVISION FIELD CREWS: D.1. ON OVERHEAD SERVICES: WILL SUPPLY AND PULL SERVICE CONDUCTOR FROM SECONDARY POWER POLE TO THE POINT OF DELIVERY AND CONNECTION. D.2. ON UNDERGROUND SERVICES: WILL COORDINATE AND MAY ASSIST THE CONTRACTOR IN PULLING CONDUCTOR FROM THE TRANSFORMER OR SECONDARY PULL BOX TO SERVICE PANEL AND CONNECTION. E. CONTRACTOR SHALL FURNISH ALL GROUNDING MATERIAL FOR THE UNDERGROUND AND OVERHEAD SERVICE, PER CONSTRUCTION STANDARDS CO 782 AND CO 784. F. FOR ALL CONSTRUCTION DETAILS AND INSTRUCTIONS SEE WORK ORDER DRAWINGS AND CONSULT WITH PUBLIC UTILITIES INSPECTOR. ---PAGE BREAK--- NEW TRANSFORMER BANK TYPICAL SIZE = 3-50 KVA PROVIDED BY THE CITY TYPICAL DISTANCE = 75' POINT OF DELIVERY MAX. 6'-3" MIN. 4'-0" EXISTING POLE WITH PRIMARY SUPPLY NOTES: 1. CITY ELECTRICAL CREW WILL PROVIDE AND CONNECT SERVICE WIRES/CABLES AT CUSTOMER OVERHEAD TO THE POINT OF DELIVERY. 2. CUSTOMER IS RESPONSIBLE FOR ALL CONNECTION AND MAINTENANCE BEYOND POINT OF DELIVERY. 3. ELECTRICAL SYSTEMS DESIGNER IS RESPONSIBLE FOR METER LOCATION. CUSTOMER TO SUPPLY AND INSTALL APPROVED PANELS, SERVICE RISER, GROUNDING MATERIAL, ETC. 4. MAXIMUM OVERHEAD 3 PHASE SERVICE IS 400 AMP, 120/240V, 120/208 AND 277/480. 5. FOR 480V, 120/240V & 277/480V, CONSULT T&D ENGINEERING. OVERHEAD SERVICE 36" MAX. 24" MIN. TYPICAL MAIN 400 AMP TYPICAL 1/0 QUAD AL PROVIDED BY THE CITY FILENAME: REVISION KEYS: ADDED / REVISED TEXT NEW SHEET CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT - - COMMERCIAL SERVICES METHODS AND REQUIREMENTS CU1500-5 REV2 2 01-14 2 4 CU 1500-5 ---PAGE BREAK--- FILENAME: REVISION KEYS: ADDED / REVISED TEXT NEW SHEET CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT - - COMMERCIAL SERVICES METHODS AND REQUIREMENTS CU1500-5 REV2 2 01-14 3 4 CU 1500-5 36" MIN. 5 4 5 5 36" MIN. OR 1 5 1 POWER POLE WITH RISER TO SECONDARY LEVEL MINIMUM 8' ABOVE GRADE SWEEP (SEE NOTE B.7) SPARE CONDUIT STUB OUT APPROX. 5' FROM BUILDING (SEE NOTE 4) INTERIOR PULL BOX/SECTION - (SEE NOTE 3(b)) PULL BOX/SECTION MOUNTED OUTSIDE OR INSIDE EXTERIOR WALL EXTERIOR WALL PADMOUNT TRANSFORMER VAULT SPLICE BOX OR SECONDARY PULL BOX SPLICE BOX OR PULL BOX UNDERGROUND SERVICES FROM TRANSFORMER FROM RISER 1 1 PMT NOTE: IN SOME CASES, THE SERVICE MAY RUN DIRECTLY FROM THE PANEL TO THE RISER POLE OR DIRECTLY TO THE TRANSFORMER PULL BOX. 3 OR 3 OR 5 OR 3 5 3 OR 5 3 OR ---PAGE BREAK--- FILENAME: REVISION KEYS: ADDED / REVISED TEXT NEW SHEET CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT - - COMMERCIAL SERVICES METHODS AND REQUIREMENTS CU1500-5 REV2 2 01-14 4 4 CU 1500-5 TYPE SPECIFICATION APPLICATION PVC (CONCRETE ENCASED) PVC SCHEDULE 40 PVC SCHEDULE 80 FROM TRANSFORMER VAULT TO SECONDARY PULL BOX & FROM SECONDARY PULL BOX TO SERVICE PULL BOX 8' ABOVE GRADE FROM GRADE TO PULL BOX OR METER PANEL, UNDER SLABS AND LANDSCAPE AREAS. POWER POLE WITH RISERS FROM 8' ABOVE GROUND 8' ABOVE GRADE FROM GRADE TO PULL BOX OR METER PANEL, UNDER SLABS AND LANDSCAPE AREAS. ASTM F12 DB 100 ANSI SPEC C80.1 UL APPROVED 90C UL APPROVED 90C HOT DIPPED GALVANIZED TABLE I MINIMUM SERVICE CONDUITS TYPES AND APPLICATIONS TABLE II CABLES AND CONDUITS REQUIRED FOR COMMERCIAL SERVICES MAIN SERVICE PANEL RATING CONDUIT SIZE PHASE NEUTRAL CABLE SIZES (ALL ALUMINUM) UNLESS NOTED WITH XHHW-2 INSULATION 100-125 200 400 600 3" 4/0 NOTES: 1. NUMBER OF RUNS FOR CONDUIT AND CABLES SHALL BE AS SHOWN IN WORK ORDER DRAWINGS. 2. FOR SERVICE PULL BOX REQUIREMENTS SEE CITY OF ANAHEIM CONSTRUCTION STANDARD CU1500-1B AND WORK ORDER DRAWINGS. 3. FOR INSTALLATION OF COPPER CABLE AND/OR ANY CABLE LARGER THAN 750 ALUMINUM CABLE, CONSULT T&D ENGINEERING. 4. INSTALL APPROVED CONDUIT LOCATOR BALL IN CONDUIT STUBOUTS AND CAP. MARK WHEN POSSIBLE. NO. 1 3 4 5 1000 2000 3000 4000 3" 4" 4" 4 4" CONSULT T&D ENGINEERING 1/0 750 750 4/0 1/0 750 750 750 750 CONSULT T&D ENGINEERING 750 750 FROM SERVICE PULL BOX TO METER PANEL ASTM F12 DB 100 2 PVC (CONCRETE ENCASED) 1600 4" [PHONE REDACTED] 4" 750 750