← Back to Anaheim, CA

Document Anaheim_doc_ccf495be7f

Full Text

Conditions of Approval for Conditional Use Permit No. 4078 Anaheim GardenWalk Project Approved by City Council Resolution No. 99R-136 (As last amended by Resolution No. 2011-121) NO. CONDITIONS OF APPROVAL REVIEW BY 1. Prior to issuance of each building permit, unless records indicate previous payment, a fee for street lighting purposes shall be paid to the City of Anaheim based on the length of street frontage in an amount as established by City Council resolution with credit against the fee given for city-authorized improvements installed by the property owner/developer. Public Utilities 2. Prior to approval of street improvement plans, pedestrian walkway lighting plans in the public rights-of-way shall be reviewed and approved by the Public Utilities Department, Electrical Services Division, and the Police Department. Public Utilities 3. Prior to issuance of each building permit, whichever occurs first, public utility easements (“PUE’s”) shall be recorded and/or abandonment of PUE’s shall be processed to the satisfaction of the Public Utilities Department for the following circumstances: A. As a result of increases in rights-of-way, where electrical and communication facilities are located adjacent to the existing right-of-way, the facilities shall be either located within the new right-of-way or relocated to new adjacent areas, requiring a PUE. B. The undergrounding of power and communication lines along the major streets will result in the need to obtain PUE’s for placement of pad mounted equipment and related facilities required as a result of the overhead to underground conversion work. C. Alterations to existing private buildings and/or construction of new structures (buildings, signs, landscaping elements, etc.) may require relocation of existing electrical and/or communication facilities. This will require abandonment of existing PUE’s and recordation of new PUE’s to accommodate such relocation. Public Utilities ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 2 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 4. A. Prior to approval of street improvement plans, roadway lighting of all public streets shall be designed in accordance with the Anaheim Resort Identity Program and associated construction specifications to the satisfaction of the Planning Department, Planning Services Division and the Public Works Department. B. Prior to approval of street improvement plans, unless records indicate previous payment, the property owner/developer shall pay or cause to be paid all costs associated with replacing the existing City of Anaheim street light system within the public rights-of-way adjacent to or within The Disneyland Resort Specific Plan Area with street lights designed in accordance with the Anaheim Resort Identity Program to the satisfaction of the Public Utilities Department, Electrical Services Division. Public Utilities 5. That prior to approval of tentative tract or parcel maps, the following street design elements shall be shown on each tentative tract or parcel map to the satisfaction of the Department of Public Works: A. Street cross-sections, including dimensions, labels, General Plan Circulation Element designation Resort Secondary), and whether public or private; B. Street grades and vertical alignment; and C. Horizontal alignment, including centerline radii, and cul-de-sac radii. Public Works 6. Prior to approval of each final tract or parcel map, vehicular access rights to all public streets adjacent to subject tract or parcel, except at approved access points, shall be released and relinquished to the City of Anaheim, to the satisfaction of the Department of Public Works. Public Works 7. Prior to approval of each street improvement plan, the following shall be provided for a one year maintenance period (commencing at completion of final building and zoning inspections), in a manner acceptable to the Department of Public Works: A. Public Realm parkway and median island landscaping and irrigation maintenance. (The “Public Realm” is described in subsection 5.3 “Landscape Concept Plan” of Section 5.0 “Design Plan” of The Disneyland Resort Specific Plan document.) B. Provision for replacement of any tree planted in accordance with landscaping plans in a timely manner in the event that it is removed, damaged, diseased and/or dies. Public Works ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 3 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 8. All engineering requirements of the City of Anaheim, including preparation of improvement plans and installation of all improvements such as curbs and gutters, sidewalks, water facilities, street grading and pavement, sewer and drainage facilities, or other appurtenant work shall be complied with as required by the Department of Public Works and in accordance with specifications on file in the Office of the City Engineer, as may be modified by the Department of Public Works; and that security in an amount and form satisfactory to the Department of Public Works, shall be posted with the City to guarantee the satisfactory completion of said improvements. Said security shall be posted with the City prior to the issuance of building permits or prior to approval of a final subdivision map to guarantee the installation of the related improvements prior to final building and zoning inspections. Public Works 9. Prior to issuance of building permits, the property owner/developer shall ensure to the satisfaction of the Fire Department that an all-weather road/driving surface shall be provided from the roadway system to and on the construction site and to fire hydrants at all times, before building materials are placed on a building site. Such routes shall be paved or, subject to approval of the Fire Department, shall otherwise provide adequate emergency access. Fire 10. Prior to issuance of grading and building permits, the property owner/developer shall ensure that all lockable pedestrian and/or vehicular access gates shall be equipped with “knox box” devices as required and approved by the Fire Department. Fire 11. Prior to approval of on-site water plans, unless each commercial building is initially connected to separate fire services, an unsubordinated covenant satisfactory to the City Attorney’s Office shall be recorded prohibiting any individual sale of buildings until separate fire services are installed in the building(s) subject to the sale. Fire City Attorney 12. Prior to approval of landscape plans for any areas within seven feet of public sidewalks, unless determined unnecessary by the Department of Public Works, root and sidewalk barriers for trees (with the exception of palm trees) shall be shown on said landscape plans. Prior to final building and zoning inspection, root and sidewalk barriers shall be installed to the satisfaction of the Department of Public Works. Public Works 13. Prior to approval of landscaping plans, the property owner/developer shall indicate on said plans, to the satisfaction of the Planning Department, Planning Services Division and Department of Public Works, Resort Services Division, that all trees planted in the Public Realm will be planted in accordance with the standard City specifications. Planning Public Works ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 4 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 14. Prior to final building and zoning inspections, a licensed landscape architect shall certify to the Planning Department, Planning Services Division that all landscaping has been installed in accordance with landscaping plans approved by the City and on file with the Building Division of the Planning Department. Any deviation from the plant palette shown on the approved landscape plans shall be submitted for review and approval by the Planning Department, Planning Services Division. All irrigation equipment within the setback area shall be fully screened so that the equipment is not visible from the public right-of-way. Prior to final building and zoning inspections for the setback area, additional planting may be required for screening purposes to the satisfaction of the Planning Department, Planning Services Division. Planning 15. On-site non-Public Realm landscaping and irrigation systems, and Public Realm landscaping and irrigation systems within areas in which dedication has not been accepted by the City, shall be maintained by the property owner/developer in compliance with City standards. Planning 16. Any tree planted within the Setback Realm shall be replaced in a timely manner in the event that it is removed, damaged, diseased and/or dies. (The “Setback Realm” is described in subsection 5.3 “Landscape Concept Plan” of Section 5.0 “Design Plan” of The Disneyland Resort Specific Plan document.) Planning 17. Prior to approval of landscape plans, plans shall include a note that a licensed arborist shall be responsible for all tree trimming within the Setback Realm. Planning 18. Prior to approval of each Final Site Plan, plans shall show that no less than twenty percent (20%) of the interior courtyards shall be landscaped with a variety of shrubs, groundcover, mature trees and potted plants to create a lush garden environment for the pedestrian (this landscaping is in addition to the required landscaped setback areas, as is measured by shade coverage). Seating areas and decorative features including, but not limited to, interactive and decorative water fountains and works of art, may also be included in this percentage. Adjacent to solid portions of building walls where there are no store-front windows), small grouping of trees or shrubs, raised planters and site furnishings shall be located to minimize views of blank walls. Planning 19. Prior to approval of each Final Site Plan, plans shall show that major project entries shall be enhanced with a more densely planted shrub palette utilizing annual color, perennial color and accent trees, to the satisfaction of the Planning Department. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 5 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 20. Prior to issuance of grading and/or building permits, the property owner/developer shall document on grading and/or building plans that a construction barrier at the construction project perimeter areas (adjacent to public rights-of-way and/or other private property) be installed prior to commencement of construction activity. Subsequent to installation, property owner/developer shall notify the Planning Department, Planning Services Division that said construction barrier has been installed. The construction sound barriers shall be a minimum height of eight feet with a minimum surface weight of one and one-quarter pounds (1.25 lbs.) per square foot or a minimum Sound Transmission Class Rating (STC) of 25. The structure shall be a continuous barrier. Gates and other entry doors shall be constructed with suitable mullions, astragals, seals, or other design techniques to minimize sound leakage when in the closed position. Access doors should be self closing where feasible. Vision ports are permissible providing they are filled with an acceptable solid vision product. Plannin 21. Sweeping operations in the parking facilities and private streets or on-site roadways shall be performed utilizing sweeping/scrubbing equipment which operates at a sound level measuring not greater than 60 dBA at the nearest adjacent property line. Planning 22. Pressure washing operations for purposes of building repair and maintenance due to graffiti or other aesthetic considerations shall be limited to daytime hours of operation between 7:00 a.m. and 8:00 p.m. Planning 23. Prior to issuance of building permits for the parking structures, a note shall be placed on the building plans which states, to the satisfaction of the Planning Department, that, in conjunction with construction of the parking structure, no impact drive piles shall be allowed. Planning 24. Prior to approval of final site plans and issuance of building and grading permits, plans shall be submitted to the Planning Department that document compliance with Specific Plan No. 92-1, as amended. Planning 25. Each Final Site Plan for the Anaheim GardenWalk project shall be prepared in conformance with Chapters 18.114.040 (Disneyland Resort Specific Plan) and 18.116.040 (Anaheim Resort Specific Plan) Final Site Plan submittal requirements. Prior to issuance of building permits, construction plans shall be in substantial conformance with said Final Site Plans. Planning 26. Prior to issuance of building permits, unless records indicate previous payment, a fee for street tree purposes shall be paid or caused to be paid to the City of Anaheim based on the length of street frontage in an amount as established by City Council resolution with credit against the fee given for City-authorized improvements installed by the property owner/developer. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 6 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 27. Prior to issuance of building permits, the property owner/developer shall document on building plans, to the satisfaction of the Planning Department, Planning Services Division, that all air conditioning facilities and other roof and ground mounted equipment shall be shielded from public view as required by The Disneyland Resort Specific Plan and the sound buffered to comply with the City of Anaheim noise ordinances from any adjacent residential or transient-occupied properties. That as part of final building and zoning inspections, compliance shall be verified. Additionally, all exterior appurtenances such as conduits shall be minimized and integrated into the structure; and that any rain gutters and downspouts and vents shall be finished to match the building materials and/or colors. Planning 28. Prior to issuance of building permits, the property owner/developer shall document on said plans, to the satisfaction of the Planning Department, Planning Services Division, that all plumbing or other similar pipes and fixtures located on building exteriors shall be fully screened from view of adjacent public rights-of-way and from adjacent properties by architectural devices and/or appropriate building materials. That as part of final building and zoning inspections, compliance shall be verified. Planning 29. The property owner/developer shall be responsible for removal of any on-site graffiti within twenty-four (24) hours of its application. Planning 30. The conceptual location and configuration of all lighting fixtures including ground-mounted lighting fixtures shall be shown on each Final Site Plan. That prior to issuance of building permits, plans submitted for building permits shall document, to the satisfaction of the Planning Department, Planning Services and Building Divisions, the location and configuration of all lighting fixtures including ground-mounted lighting fixtures utilized to accent buildings and landscape elements, or to illuminate pedestrian areas. All lighting shall be shielded to direct lighting toward the area to be illuminated. That as part of final building and zoning inspections, compliance shall be verified. Planning 31. Prior to approval of each Final Site Plan, the property owner/developer shall document on plans, to the satisfaction of the Planning Department, Planning Services Division, that building elevations shall show that the rear elevations of buildings visible from a five foot high view point from off-site areas shall be architecturally accented to portray a finished look. Planning 32. Prior to recordation of a subdivision map, in the event a parcel is subdivided and there is a need for common on-site circulation and/or parking, an unsubordinated covenant providing for reciprocal access and/or parking, as appropriate, approved by the Department of Public Works and the Planning Department, Planning Services Division, and in a form satisfactory to the City Attorney, shall be recorded with the Office of the Orange County Recorder. Public Works Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 7 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 33. No shuttle/bus/vehicular drop-off areas shall be permitted in hotel/motel or vacation resort front setback areas. Planning 34. In connection with submittal of the first Final Site Plan for Area A the property owner/developer shall submit a comprehensive sign program. Each subsequent Final Site Plan shall include a sign program that shall be in compliance with the comprehensive sign program and the development standards of the Anaheim GardenWalk Overlay. The comprehensive sign program shall at a minimum include the following: A. A sign theme/concept which demonstrates an overall appearance quality and type of sign, banner or other display device; the quality of such signage shall be equivalent to those utilized at Universal City Walk, Fashion Island or Irvine Spectrum. This is a quality standard and is not intended, nor does it provide, additional signage rights or permit any specific type of sign which does not conform with the signage regulations set forth in The Disneyland Resort Specific Plan, as amended per the Anaheim GardenWalk Overlay. B. Sign criteria for interior corporate sponsorship displays (said displays could include “jumbotrons,” banners or placards) which are oriented towards the interior of the Anaheim GardenWalk project. The staff report to the Planning Commission shall include a recommendation by the Planning Director regarding his or her determination as to the orientation of such displays. Such displays shall not be visible from the public right- of-way at an equal elevation as the Anaheim GardenWalk property line (measured at five feet above the grade of the sidewalk on the opposite side of the street from the Anaheim GardenWalk project) except through the limited view corridors set forth in the Anaheim GardenWalk Overlay. C. Sign criteria limiting interior wall signs from projecting more than fifty percent (50 of the vertical height of the sign above the roof parapet or fifty (50%) of the horizontal length of the sign beyond the side of a building. D. Sign Criteria consistent with the adopted sign regulations for the Anaheim GardenWalk Overlay. E. Standards for maintenance and replacement of damaged/broken signs and banners and installation and maintenance of changeable sign copy neon signage or electronic readerboards. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 8 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 35. Prior to issuance of building permits for the retail and parking structure component of Area A, the property owner/developer shall submit final design plans for the icon/themed signage element indicated on Exhibit No 12 of this conditional use permit and that the height of the icon element would be reduced from a maximum height of 120 feet to a maximum height of 75 feet as measured from the grade level of the sidewalk on Disney Way and that lighting on the icon will be limited to subtle lighting that slowly changes colors. If the icon element does not include any signage visible from the public rights-of-way at an equal elevation as the Anaheim GardenWalk property line (measured at five feet above the grade of the sidewalk on the opposite side of the street from the Anaheim GardenWalk project), plans shall be reviewed by the Planning Director for substantial conformance with the Final Site Plans. If the icon includes any signage, a conditional use permit in compliance with Section 18.114.[PHONE REDACTED].02(b) and 18.114.[PHONE REDACTED].05 shall be required, with the maximum height and design of the element subject to the review and approval of the Planning Commission. Preliminary design plans for said icon/ themed element without signage shall be shown on plans submitted as part of Final Site Plans subject to the review and approval of the Planning Commission. Said plans shall include the location, design, height, dimensions, and lighting scheme of the icon/themed structure. Final design plans shall be subject to the review and approval of the Planning Director prior to the issuance of building permits and/or may be recommended for review and approval by the Planning Commission as a report and recommendation item at the sole discretion of the Planning Director Planning 36. Prior to issuance of each sign permit the property owner/developer/tenant shall submit a letter and plans demonstrating that the sign plans conform with the comprehensive sign program approved by the Planning Commission and with the business identification sign locations for Disney Way and Katella Avenue. Planning 37A. Prior to approval of each Final Site Plan, the property owner/developer shall submit the anticipated construction schedule for each of the remaining project components by development phase; and that an updated schedule shall be submitted to the Planning Department every six months until the project is completed, or as deemed necessary by the Planning Department. Planning 37B. The property owner/developer shall be responsible for all costs associated with the review of each Final Site Plan application by an architect, licensed by the State of California and selected by the City, to review the Final Site Plan for conformance with Section 5.0 “Design Plan” of The Disneyland Resort Specific Plan. The property owner/developer shall pay all costs associated with this review prior to each Final Site Plan being scheduled for a Planning Commission meeting. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 9 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 38. Prior to issuance of each building permit for a parking structure, a line-of-sight study shall be submitted for review and approval by the Planning Department which shows that any light poles on the roof-top areas of the parking structure, if proposed, shall not be visible from the adjacent public rights-of-way, as measured from a five foot high view point from adjacent off-site areas. Planning 39. No exterior-mounted air conditioning facilities for individual hotel rooms or vacation ownership rooms shall be permitted in the Anaheim GardenWalk Overlay. Planning 44. Prior to approval of each Final Site Plan, plans shall show how all on-site service and loading area operations shall be screened from the public rights-of- way to the satisfaction of the Planning Department. Planning 41. A comprehensive sign program for Area B shall be submitted in conjunction with the first Final Site Plan in Area B for review and approval by the Planning Commission. The comprehensive sign program shall be in compliance with the sign standards and regulations contained within The Disneyland Resort Specific Plan. Planning 42. The subject property shall be developed in substantial conformance with plans and specifications submitted to the City of Anaheim by the applicant and which plans are on file with the Planning Department marked Exhibit Nos. 1 through 12 of Conditional Use Permit No. 4078 and Exhibit Nos. 1 through 17 of Final Site Plan No. 2006-00002 (which includes Exhibits Nos. 1 through 12 of Conditional Use Permit No. 4078), as amended. The Anaheim GardenWalk project shall be developed in accordance with the quality, design and architectural integrity as shown on the exhibits. Planning 43. Prior to approval of each Final Site Plan and prior to issuance of each building permit, the Anaheim Police Department shall review and approve plans for safety, accessibility, crime prevention, and security provisions during both the construction and operative phases. Police 44. Prior to issuance of the first building permit, the plans which are required to be submitted for the police/security office (to comply with the mitigation measures identified in Modified Mitigation Monitoring Plan No. 004a) shall make provision for the police/security office in accordance with the requirements of Development Agreement No. 99-01, as amended, to the satisfaction of the Police Department. Plans shall also specifically identify the parking spaces designated for such police/security office. Police ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 10 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 45. Prior to issuance of building permits for parking structures, plans submitted for building permits shall be approved by the Police Department to ensure that safety and security measures are incorporated, including the use of bi- directional antennae to insure performance of public safety radio communications equipment (800 Mhz) in eighty-five percent (85%) of any structure or developed area, or in compliance with public safety radio system coverage requirements in effect at the time of the issuance of building permits. Prior to final building and zoning inspections, installation of required antennae shall be verified. Police 46. Prior to issuance of building permits, plans submitted for building permits shall document that trash storage areas be provided and maintained in locations acceptable to the Department of Public Works, Streets and Sanitation Division and in accordance with approved plans on file with said Department. Public Works 47. Prior to issuance of building permits, plans submitted for building permits shall be reviewed to ensure that gates shall not be installed across any driveway or private street in a manner which may adversely affect vehicular traffic in the adjacent public streets and that all parking facilities conform to City standard plans. Installation of any gates shall conform to Standard Plan No. 402-B (“Parking Structure & Ramp Standard Detail”) and Standard Plan No. 475 (”Gate Standard for Residential/Commercial/Industrial”) and shall be subject to the review and approval of the Public Works Department, Traffic Engineering Division and the Planning Department, Planning Services Division prior to issuance of a building permit. Public Works 48. Prior to approval of each Final Site Plan, plans for vehicular and pedestrian circulation shall be submitted to the Department of Public Works, Traffic Engineering Division for review and approval showing conformance with Section 5.0 “Design Plan” of the Specific Plan. Public Works 49. Prior to issuance of building permits for parking structures, internal signage plans shall be designed to enhance smooth traffic flows on each level of the parking structure and shall be submitted to the Planning Department, Planning Services Division and Department of Public Works, Traffic Engineering Division for review and approval. Planning Public Works 50. Prior to issuance of building permits, the property owner/developer shall prepare a plan of operations for review and approval by the Department of Public Works, and shall provide proof of their participation in the Anaheim Transportation Network (“ATN”) to the Department of Public Works, Traffic Engineering Division. Public Works ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 11 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 51. Prior to approval of the Final Site Plan for the area encompassing the driveway for Anaheim GardenWalk adjacent to the driveway for the Super 8 Motel at 415 West Katella Avenue, the Final Site Plan shall show that the driveway has been redesigned to combine the driveways or to meet the distance requirement set forth in The Disneyland Resort Specific Plan minimum forty (40) foot wide distance between driveways serving adjacent parcels). If redesigned to combine the driveways, proof of an agreement with the adjacent property owner shall also be provided to the satisfaction of the City Attorney’s Office. Public Works City Attorney 52. Prior to approval of the first Final Site Plan for Area A, and prior to approval of the first Final Site Plan for Area B, the property owner/developer shall submit conceptual street improvement plan cross-sections (to be shown on the Final Site Plan) to the Department of Public Works, Development Services Division for the installation of the ultimate public right-of-way improvements for adjacent public streets. Prior to the approval of the final subdivision map for Area A, and prior to approval of grading plans if a subdivision map is not proposed for Area B, the property owner/developer shall submit final street improvement plans for review and approval by the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvement plan and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. These improvements shall be completed prior to the first final building and zoning inspections for Area A and Area B. Public Works 53. Prior to approval of the first Final Site Plan for Area A, conceptual street improvement plans shall be prepared for the construction of a free right-turn lane on the south side of Disney Way from the parking garage driveway exit to Clementine Street (thirteen (13) foot lane width) in order to improve outbound parking structure operations. Prior to the approval of the final subdivision map for Area A, the property owner/developer shall submit final street improvement plans for the construction of the free right-turn lane for review and approval by the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvement plan and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. These improvements shall be completed prior to the first final building and zoning inspection for Area A. A portion of the free right-turn lane on Disney Way may be utilized as a bus loading/unloading zone on an interim basis until such time that Area B is developed, subject to the review and approval of striping plans by the Department of Public Works, Traffic Engineering Division. Public Works ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 12 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 54. Prior to approval of the first Final Site Plan for Area A, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works, Development Services Division for intersection improvements, including construction of a driveway on the south side of Disney Way to provide signalized ingress and egress, including a signal plan and a pedestrian cross walk, between Anaheim GardenWalk and westbound and eastbound traffic along Disney Way. Final street improvement plans shall be submitted for review and approval by the Department of Public Works prior to approval of the final subdivision map. The property owner/developer shall be responsible for all costs associated with the preparation and processing of said street improvement plans and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works, Development Services Division. These improvements shall be completed prior to the first final building and zoning inspection for Area A. Public Works 55. Prior to approval of the Final Site Plan for Area B, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works for construction of a right-turn lane on the south side of Disney Way from Harbor Boulevard to the mid-block project entrance. Prior to the approval of the final subdivision map, or prior to approval of grading plans if a subdivision map is not proposed for Area B, the property owner/developer shall submit final street improvement plans for review and approval by the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvements plan and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works. These improvements shall be completed prior to the first final building and zoning inspection for Area B. Public Works 56. Prior to approval of the first Final Site Plan for Area A, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works, Development Services Division for the interim condition to provide a single left turn lane in Disney Way between the mid- block project entrance and Clementine Street. Prior to the approval of the final subdivision map for Area A, the property owner/developer shall submit final street improvement plans for review and approval of the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvements plan and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works. These improvements shall be completed prior to the first final building and zoning inspection for Area A. Public Works ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 13 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 57. Prior to approval of the first Final Site Plan for Area B, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works, Development Services Division for the ultimate condition to provide duel left turn lanes in Disney Way between the mid-block project entrance and Clementine Street. Prior to the approval of the final subdivision map, or prior to approval of grading plans if no subdivision is proposed for Area B, the property owner/developer shall submit final street improvement plans for review and approval of the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvement plans for the duel left turn lanes and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works. These improvements shall be completed prior to the first final building and zoning inspection for Area B. Public Works 58. In connection with submittal of each Final Site Plan application, the property owner/developer shall provide information regarding the ownership and/or long term lease status of each of the underlying parcels, including any airspace or vertical subdivision, of the 29.1 acre Anaheim GardenWalk project whether the parcels are owned, leased, under negotiation, etc.). Planning 59. Prior to Planning Commission review of each Final Site Plan, a notice shall be mailed to the property owners within a three hundred (300) foot radius of Anaheim GardenWalk advising them of the Planning Commission meeting. Planning 60. Prior to issuance of the first grading permit, and updated on a basis during construction, the property owner/developer shall submit a plan, for review and approval by the Department of Public Works, identifying (and updating) the sequence and timing of all street improvements along Disney Way, Clementine Street, Katella Avenue and Harbor Boulevard. Said street improvement plans shall include all driveways, traffic signals, pedestrian cross walks, etc. The phasing and timing for commencing and completing any or all of the street improvements shall be as required by Department of Public Works. Public Works 61. Prior to issuance of building permits, building plans shall document that water backflow equipment and any other large water system equipment shall be installed behind the Setback Realm area in a manner fully screened from all public streets and alleys. Prior to final building and zoning inspections, compliance with this condition shall be verified by the Public Utilities Department, Water Utility Division. Public Utilities 62. Prior to issuance of water improvement plans, the property owner/developer shall document on water improvement plans, to the satisfaction of the Public Utilities Department, Water Engineering Division, that water service is available. Public Utilities ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 14 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 63. The property owner/developer shall be held responsible for compliance with the mitigation measures and for implementation of the project design features identified in Modified Mitigation Monitoring Program No. 004a in compliance with Section 21081.6 of the Public Resources Code. Furthermore, the Anaheim GardenWalk property owner/developer shall be responsible for any direct costs associated with the monitoring and reporting required to ensure implementation of those mitigation measures and project design features identified in Modified Mitigation Monitoring Program No. 004a. Modified Mitigation Monitoring Program No. 004a, which includes mitigation measures and project design features, is attached and made a part of these conditions of approval. Planning 64. Prior to approval of each Final Site Plan, the following plans/materials/information shall be provided for review and approval by the Planning Department: A. A site plan showing all proposed project components of the development phase including, but not limited to, all buildings, landscape areas, parking areas, and the adjacent street improvements. Conceptual hardscape areas, fountains/water features and works of art will also be shown. B. Preliminary Mass Grading Plans. C. Conceptual elevation plans showing all views of each proposed building. D. Roof-top plans for each building showing all roof-top equipment (roof-top equipment is required to be fully-screened by the architecture of the building and painted in a color to match the color of the roof). E. Preliminary floor plans for each level of the parking garage (all parking spaces shall be dimensioned and the total number of spaces on each level shall be shown on the plan). F. Preliminary landscape plans showing all proposed planting materials and the proposed landscape plant/tree palette, including color photographs, to show the proposed trees, shrubs and groundcover. G. Above- and below-ground utility equipment shall be shown on each site plan and landscape plan. Plans must indicate how any above-ground equipment is fully screened by landscaping from any public view. H. Conceptual colored renderings of the site improvements to show the building elevations from Harbor Boulevard, Katella Avenue, Clementine Street, and Disney Way, and views of the interior portions of the site. Additionally, where a development phase adjoins a future development phase (as yet undeveloped), a colored rendering shall be provided to illustrate the building elevation(s) facing that future phase. I. Preliminary material and color boards for each building, including the parking structure, which show that all building colors, textures and materials shall be compatible between on-site uses. The preliminary color boards shall show the proposed decorative paving materials for the interior courtyard areas of the site and pedestrian gathering areas will be compatible Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 15 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY with on-site uses. The design and location of the walkways shall not impact the placement of trees in the public right-of-way parkways. In addition, the walkways shall not preclude the planting of the number of trees required for the setback area by The Disneyland Resort Specific Plan Design Plan. J. Letter from the property owner/developer indicating how the Final Site Plan is in compliance with The Disneyland Resort Specific Plan requirements and Conditional Use Permit No. 4078, as amended. K. That the lighting fixture plan shall include the style of the fixtures which shall be compatible with the project theme. L. That any existing adjacent development on the 29.1-acre Anaheim GardenWalk site shall be shown on the site plan or other appropriate plan(s) to clearly illustrate the relationship between the proposed construction on each development phase and existing development/uses on adjoining development phase(s). Such additional information is intended to illustrate vehicle and pedestrian circulation between development phases, access to public rights-of-way, shared parking spaces, continuity of building design and placement (including the parking structure), etc. M. That the developer shall provide information regarding the development status of the other development phases vacant, pre-existing use, construction underway in accordance with Anaheim GardenWalk uses, construction completed in accordance with Anaheim GardenWalk uses, etc.) for the entire 29.1-acre Anaheim GardenWalk site. N. That in connection with development in the Anaheim GardenWalk Overlay, submittal of any Final Site Plan adjacent to a development phase which is vacant or which is not developed in accordance with Anaheim GardenWalk Overlay shall show that a minimum ten (10) foot setback, fully landscaped, shall be provided and maintained along the property line 65. Number not used N/a 66. If Area B is not developed in accordance with the Anaheim GardenWalk Overlay, it may be developed in accordance with The Disneyland Resort Specific Plan No. 92-1, District A provisions. Planning 67. If Area B is developed in accordance with the Anaheim GardenWalk Overlay, prior to approval of a Final Site Plan, the property owner shall demonstrate on plans and show that development of Area B shall be fully integrated with Area A and that Areas A and B will be operated as a single integrated project. Planning 68. Prior to advertising for any special event which will draw visitors to the Anaheim GardenWalk project, a special events permit shall be obtained. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 16 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 69. Granting of the parking waiver is contingent upon operation of the use in conformance with the assumptions and/or conclusions relating to the operation and intensity of use as contained in the Transportation Analysis Update prepared by Iteris, Inc for the Addendum to the Pointe Anaheim Initial Study/Mitigated Negative Declaration Anaheim GardenWalk Project, dated March 17, 2011, that formed the basis for approval of said waiver. Exceeding, violating, intensifying or otherwise deviating from any of said assumptions and/or conclusions, as contained in the Transportation Analysis Update prepared by Iteris, Inc for the Addendum to the Pointe Anaheim Initial Study/Mitigated Negative Declaration Anaheim GardenWalk Project, dated March 17, 2011 shall be deemed a violation of the expressed conditions imposed upon said waiver which shall subject this conditional use permit to termination or modification pursuant to the provisions of the Anaheim Municipal Code. Planning 70. Following completion of construction of the 3,050 space parking structure in Area A, and on-going during project operation, the property owner/developer shall provide overflow parking to the Anaheim Convention Center in accordance with the “Parking Facilities Operating Lease”, as may be amended, as part of the Disposition and Development Agreement by and between Anaheim GW, LLC and the City of Anaheim. Community Development Convention, Sports and Entertainment 71. Prior to approval of the first Final Site Plan for Area B, the property owner/developer shall submit a parking analysis to the Planning Department for review and approval, showing that the proposed number of parking spaces (1,600 spaces in Area B) will be adequate for Area B the proposed land uses and building areas). Further, because the parking for the Anaheim GardenWalk project may be shared between multiple land uses in Areas A and B, said analysis shall include information regarding the number of parking spaces, the land uses and the building areas in the previously approved portions of the project. If the parking analysis concludes that additional parking spaces are necessary to accommodate the parking demands of Areas A and B, as well as the overflow parking for the Anaheim Convention Center, as prescribed in the “Parking Facilities Operating Lease”, as may be amended, as part of the Disposition and Development Agreement by and between Anaheim GW, LLC and the City of Anaheim, said spaces shall be shown on plans submitted for Final Site Plan approval. Planning Community Development Convention, Sports and Entertainment 72. The Anaheim GardenWalk project shall be developed in accordance with Development Agreement No. 99-01, as amended. Planning 73. Aapproval of this conditional use permit is contingent upon the approval and adoption of General Plan Amendment No. 2010-00481 and Amendment No. 8 to The Disneyland Resort Specific Plan No. 92-1. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 17 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 74. The property owner/developer shall construct the Anaheim GardenWalk project in accordance with the following limitations: A. The property owner/developer will not seek to change the entitlements for the one thousand six hundred twenty eight (1,628) hotel rooms/suites to any other use; provided, however, that the owner/developer may elect to construct up to 400 Vacation Ownership Units in lieu of 400 Hotel Rooms in Area A and up to 100 Vacation Ownership Units in lieu of 100 Hotel Rooms in Area B of the project, and provided further, that the property owner/developer may elect to construct the remaining hotel rooms as Condominium Hotels as defined in Code Section No. 18.[PHONE REDACTED] of The Disneyland Resort Specific Plan No 92-1, Anaheim GardenWalk Overlay and as defined in Development Agreement No. 99-01, as amended. As a condition of such election, the property owner/developer shall enter into subsequent agreements with the City that provide the City with “in-lieu” payments to be made at a mutually acceptable time(s), and in amounts not in excess of the equivalent Transient Occupancy Taxes to which the City would be entitled if such Vacation Ownership Units and Condominium Hotel units were occupied as traditional hotel rooms. B. The design of the Anaheim GardenWalk project shall incorporate the hotels as integral components of the site plan, and the Anaheim GardenWalk project’s construction shall be consistent with said plan. Planning 75. A public art program shall be installed within the boundaries of the Anaheim GardenWalk project. Prior to approval of the first Final Site Plan, the public art element concept (including location, description and budget), shall be submitted to the City of Anaheim for review and approval. The public art element shall be installed prior to the first final building and zoning inspections for the structures or components in the development phase in which it is proposed to be located, excluding the parking structure. Planning 76. Deleted by Resolution No. 2011-121. Planning 77. The land uses permitted in each development phase shall comply with The Disneyland Resort Specific Plan No. 92-1 document, as amended. Planning 78. The project development density shall not exceed that which is specified in the City of Anaheim General Plan, Land Use Element, Table LU-4 “General Plan Density Provisions for Specific Areas of the City”, and The Disneyland Resort Specific Plan No. 92-1, as amended for the Anaheim GardenWalk Overlay. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 18 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 79. Prior to issuance of the first building permit or approval of the first grading permit, whichever occurs first, for development that incorporates all or a portion of the following parcel(s), the property owner(s) shall submit a letter to the Planning Department requesting termination of the zoning petitions associated with said underlying parcel(s) (which zoning entitlements are not associated with the Anaheim GardenWalk project), as follows: Pyrovest (Anaheim Plaza Hotel and Suites) parcel Variance No. 1021: Approved by the Planning Commission under Resolution No. 40, Series, 1958-1959, to establish a motor hotel and appurtenant uses at 1660-1720 South Harbor Boulevard; and by the City Council on September 2, 1958 under Resolution No. 4733 regarding only the “appurtenant uses”) Variance No. 3433: Approved on October 29, 1984 under Resolution No. PC84-225 for waiver of permitted number and type of flags to retain 25 roof- mounted flags in the CR Zone at 1700 South Harbor Boulevard) Planning 80. Prior to approval of final site plans for any vacation ownership resort units within the Anaheim GardenWalk Overlay, the property owner/developer shall submit information to the Planning Department indicating the provision of facilities, amenities, or design features usually associated with hotels (for example, lobbies, check-in areas, registration desks, service closets, laundry facilities, etc) in compliance with Code Section 18.114.[PHONE REDACTED], and further, whether any kitchen facilities suitable for visitors are proposed, in compliance with Code Section 18.114.[PHONE REDACTED]. Plans and information submitted for final site plan approval shall be in compliance with Code Section 18.114.070, excepting Subsection .0712 (required parking demand study). Planning 81. A. Prior to approval of each final site plan for a condominium hotel, CC&R’s and a Master Lease shall be submitted to the Planning Department and the City Attorney’s Office for review and approval. The final CC&Rs and Master Lease shall be consistent with Conditional Use Permit No. 4078, as amended, on file in the Planning Department, The Disneyland Resort Specific Plan and the City of Anaheim General Plan. The CC&Rs and Master Lease shall not be amended or terminated without the prior written approval of the Planning Director and modification of land use permits as may be required to authorize and reflect the changes in the CC&Rs and/or the Master Lease. B. Prior to approval of each final site plan for a condominium hotel, the property owner/developer shall have a title company review the airspace condominium map and certify that the airspace condominium map has created insurable units for sale as commercial condominium units. C. On-going during project operation, any non-residential condominium hotel developed as part of this project shall be maintained and operated as a hotel (with the exception of the proposed financing structure), as approved by Conditional Use Permit No. 4078 and in accordance with approved final site plans. Planning ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 19 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY D. On-going during project operation, Transient Occupancy Tax shall be collected for all non-residential condominium hotel rooms as set forth in Chapter 2.12 (Transient Occupancy Tax) of the Anaheim Municipal Code. E. On-going during project operation, for any non-residential condominium hotel, owners use of airspace condominium units shall be limited to fourteen (14) days per calendar year, and shall be subject to the payment of Transient Occupancy Tax based upon the hotel room rate of a comparable hotel room. F. On-going during project operations, any non-residential condominium hotel developed as part of this project shall be managed, maintained and operated by a single qualified professional entity. G. On-going during project operations, at no time shall any hotel rooms developed as part of this project be occupied as residential dwelling units. 82. Approval of this application constitutes approval of the proposed request only to the extent that it complies with the Anaheim Municipal Zoning Code and any other applicable City, State and Federal regulations. Approval does not include any action or findings as to compliance or approval of the request regarding any other applicable ordinance, regulation or requirement. Planning 83. The owner/manager for any ABC licensed location or Entertainment business shall submit a detailed security plan for approval of the Chief of Police or his/her designee that includes security measures including the number of security personnel. Security personnel will comply with Business and Professions code 7574. Any amendments to the plan shall be approved by the Chief of Police or his/her designee and shall also be filed with the Police Department, Vice Detail and the Planning Department. Planning Police 84. Within sixty (60) days of the approval of Conditional Use Permit No. 4078E, the property owner or his/her designee shall submit a detailed security plan to address the additional security needs created by the changing tenant mix. This plan should included minimum staffing levels by day and time. Once approved, a copy of the security plan shall be maintained with the Police Department, Vice Detail and the Planning Department. Any amendments to the plan shall be approved by the Chief of Police or his/her designee and shall also be filed with the Police Department, Vice Detail and the Planning Department. Security measures shall be reviewed and discussed with the Chief of Police or his/her designee by the business and property owners on an on- going basis. Planning Police ---PAGE BREAK--- Conditions of Approval for CUP 4078 - Anaheim GardenWalk Project Page 20 of 20 NO. CONDITIONS OF APPROVAL REVIEW BY 85. Within sixty (60) days of the approval of Conditional Use Permit No. 4078E, the property owner or his/her designee shall submit an updated Parking Maintenance and Operation Plan as required by Mitigation Monitoring Program No. 004a. In addition to review and approval by the Planning Department, the plan shall also be submitted for review and approval by the Chief of Police or his/her designee. The plan shall promote a safe environment for the circulation of persons and vehicles, and the prevention of crime in the parking facilities. This plan shall include measures to ensure reasonable egress times for vehicles out of the parking lot. Any amendments to the plan shall be filed with the Police Department, Vice Detail and the Planning Department. Planning Police 86. Following the issuance of a Certificate of Occupancy for both hotels in Area A, project ownership will implement a valet program during peak demand periods that will create sufficient additional parking supply to satisfy such demand. The valet program shall be implemented in accordance with the Parking Maintenance and Operations Plan. Planning