Full Text
A. COPIES ( 8.5” X 11”) AND (8.5” X 14”) $0.15/ PAGE B. PRINTS FROM LASER FICHE ( 8.5” X 11”) AND (11” X 17”) $0.75/ PAGE C. COPIES (11” X 17”) $0.25/ PAGE D. COPIES (18” X 24”) AND (24” X 36”) SHEET E. PRINTS FROM LASER FICHE (18” X 24”) AND (24” X 36”) $2.50/ SHEET F. COMPACT DISCS (W/CASE) $10/ EA C.Y. CUBIC YARD EA EACH GSF GROSS SQUARE FOOT HR HOUR LF LINEAR FOOT MIN MINIMUM SF SQUARE FOOT ACRE + LAT ACRE + LATERAL DU DWELLING UNIT KEY A. RIGHT OF WAY CONSTRUCTION 1. PUBLIC AGENCIES/ PUBLIC UTILITIY $101 2. PUBLIC UTILITY ANNUAL BLANKET PERMIT $574 3. SINGLE FAMILY (Residential) $76 4. COMMERCIAL/ INDUSTRIAL/ TRACTS $101 B. GRADING 1. FLATLAND $101 2. HILLSIDE $152 C. TRANSPORTATION 1. ANNUAL PERMIT $93/ EA 2. SINGLE TRIP $17/ EA D. PERMIT TIME EXTENSION (Must be obtained prior to permit expiration - otherwise, full permit fee will apply) 50% OF ORIGINAL PERMIT FEE PERMIT FEES A. TRAFFIC IMPACT FEES 1. CONDOMINIUM $3,702/ DU 2. APARTMENT $5,015/ DU 3. OFFICE $12/ GSF 4. COMMERCIAL $50/ GSF 5. INDUSTRIAL GSF B. STORM DRAIN IMPACT FEES1 1. SINGLE FAMILY $110,868/ NET ACRE 2. MULTIPLE FAMILY $110,868/ NET ACRE 3. MOBILE HOME $110,868/ NET ACRE 4. HOTEL/ MOTEL, COMMERCIAL, RECREATIONAL, AND INDUSTRIAL $110,868/ NET ACRE C. SEWER IMPACT FEES (ALL LAND USES) $640/ 1,000 GSF2 D. ARTERIAL HWY BEAUTIFICATION (ALL LAND USES) $18,619/ GROSS ACRE 1) Applicable to Platinum Triangle Mixed Use overlay zone 2) Gross floor building area development greater than 0.4 floor area ratio SUPPLEMENTAL PLATINUM TRIANGLE FEES Effective 10/28/2022 in better understanding and utilizing the services of the Ana- heim Department of Public Works, we have outlined a listing of the services we provide and their applicable rates. Also listed are the appropriate development impact fees related to various infrastructure improvements that would be required as a result of development. It should be noted that existing fees may be adjusted or new fees added from time to time. Our department is always happy to meet with individuals to discuss any specific needs and requirements. Please do not hesitate to call us at (714) 765-5176 for assistance with any questions or concerns you may have. We look forward to the opportunity of being of service to you! Rudy Emami Director of Public Works Department of Public Works 200 S. Anaheim Blvd. Anaheim, California 92805 (714) 765-5176 Fax: (714) 765-5225 www.anaheim.net To assist you... COPY FEES PUBLIC WORKS PUBLIC WORKS ---PAGE BREAK--- A. PLAN CHECKING & ENGINEERING $163/ HR B. CONSTRUCTION INSPECTION REGULAR $143/ HR OVERTIME $164/ HR C. T.V. SEWER INSPECTION (2 HRS. MIN.) $184/ HR D. SURVEY 2-PERSON CREW $250/HR E. REAL PROPERTY SERVICES $163/ HR F. CONSULTANT SERVICES AT CONTRACT RATE G. CLERICAL $74/ HR H. SIDEWALK WAIVER $302/ EA I. FINAL MAP DOCUMENTS $35/ SHEET J. PLANS AND SPECIFICATIONS ACTUAL COST MAILING FEE $22.99 K. Pavement Cut Fees SERVICE FEE DEPOSITS A. TRAFFIC STUDIES 1. LESS THAN 100 PEAK TRIPS $2,175 2. 100 - 250 PEAK TRIPS $4,350 3. OVER 250 PEAK TRIPS $7,250 B. TRAFFIC SIGNAL (Plan check & inspection) $6,000 C. DESIGN STUDIES 1. SEWER / HYDROLOGY $2,300 2. RIGHT-OF-WAY SKETCHES $500 3. SPECIFIC PLAN REVIEWS $1,000 4. MISCELLANEOUS TECHNICAL REVIEWS $2,300 5. SEWER STUDIES/ REVIEWS MINOR $4,500 MAJOR $8,500 D. PLAN CHECKING& INSPECTION 1. TRACTS (includes Sewer, Street, Grading and Storm Drain Improvement Plans) SINGLE FAMILY ($6,000 MINIMUM) $750/ LOT MULTI– FAMILY ($6,000 MINIMUM) $300/ UNIT 2. TRACT/ PARCEL MAPS (map only) $7,500 3. LOT LINE ADJUSTMENT $3,500 4. IMPROVEMENT PLANS STREET/ STORM DRAIN $13/ LF Minimum Deposit $7,000 SEWER $12/ LF Minimum Deposit $5,000 5. MINOR GRADING (no building pad) $1,400 6. FLATLAND GRADING PLAN $6,000 7. HILLSIDE GRADING PROJECT LESS THAN 100 C.Y. $4,500 100 - 10,000 C.Y. $6,500 10,001 - 100,000 C.Y. $8,500 100,001 - 1,000,000 C.Y. $12,100 OVER 1,000,000 C.Y. $16,500 8. REVERSION TO ACREAGE $1,400 9. CERTIFICATE OF COMPLIANCE $2,000 10. CERTIFICATE OF CORRECTION $1,000 E. TECHNICAL REAL PROPERTY REVIEW $1,500 F. DEED PREP/ PROCESSING $2,500 G. ABANDONMENT $3,000 H. ENCROACHMENT $2,000 I. NPDES WATER QUALITY PLANS $3,000 J. PERMIT INSPECTION DEPOSITS 1. SINGLE FAMILY - Driveway approach/curb drains $163 MIN 2. SINGLE FAMILY- Sidewalk $0 3. COMMERCIAL - Driveway approach $650 MIN 4. COMMERCIAL - Sidewalk $500 MIN 5. INDUSTRIAL - Driveway approach $650 MIN 6. INDUSTRIAL - Sidewalk $500 MIN 7. MISCELLANEOUS COMMERCIAL/ INDUSTRIAL $960 MIN 8. WATER/ ELECTRICAL SERVICE $960 MIN 9. SEWER LATERALS $960 MIN 10. GROUND WATER MONITORING (annual)1 $650 EA 11. GROUND WATER INSTALL/ DESTRUCTION1 $350 EA 12. TELECOMMUNICATION MASTER PLAN $5,000 13. LANE CLOSURE $100/ DAY 1) Fee J10 and J11 - Monitoring requires a 4-hr. min. deposit at regular con- struction inspection rate; installation/destruction requires a 3-hr. min deposit IMPACT FEES A. TRANSPORTATION IMPACT AND IMPROVEMENT FEES 1. SINGLE FAMILY $2,029/ UNIT 2. MULTI FAMILY $1,297/ UNIT 3. HOTEL/ MOTEL ROOM $1,474/ UNIT 4. OFFICE $3.67/ GSF 5. RETAIL/COMMERCIAL $5.50/ GSF 6. INDUSTRIAL $1.42/ GSF 7. PEAK HOUR TRIP END $1,285/ TRIP B. SEWER CONNECTION ($250 min) $350/ ACRE F. SEWER ASSESSMENT AREAS 1. MOHLER DRIVE $1,988/ ACRE+LATERAL 2. MARTELLA LANE $6,913/ ACRE+LATERAL 3. EUCALYPTUS DRIVE (EAST) $21,016/ ACRE+LATERAL 4. EUCALYPTUS DRIVE (WEST) $21,016/ ACRE+LATERAL 5. TIMKEN CANYON $16,715/ ACRE+LATERAL 6. TIMKEN ROAD $7,462/ ACRE+LATERAL 7. PERALTA HILLS DRIVE $1,149/ ACRE+LATERAL 8. COUNTRY HILL ROAD $3,088/ ACRE+LATERAL 9. LINCOLN AVE. - WESTERN ST. $1,911/ LOT 10. CLEMENTINE ST. - ELM ST. $26,105/ ACRE 11. COFFMAN ST. - CYPRESS ST. $12,890/ ACRE G. STORM DRAIN IMPACT FEES (Anaheim Resort Area & South Central Anaheim; not applicable to Platinum Triangle Mixed Use overlay zone) 1. SINGLE FAMILY $19,080/ NET ACRE 2. MULTIPLE FAMILY $24,296/NET ACRE 3. MOBILE HOME $27,812/ NET ACRE 4. HOTEL/ MOTEL, COMMERCIAL/ RECREATIONAL & INDUSTRIAL $34,769 NET ACRE H. STORM DRAIN IMPACT FEES (Drainage District 27; not applicable to Platinum Triangle Mixed Use overlay zone) 1. SINGLE FAMILY $28,599/ NET ACRE 2. MULTIPLE FAMILY $35,161/ NET ACRE 3. MOBILE HOME $41,705/ NET ACRE 4. HOTEL/ MOTEL, COMMERCIAL/ RECREATIONAL & INDUSTRIAL $52,132/ NET ACRE I. STORM DRAIN ASSESSMENT AREAS 1. ANAHEIM CANYON INDUSTRIAL $2,000/ ACRE 2. MONTE VISTA $3,552/ ACRE 3. LAKEVIEW AVENUE $2,436/ ACRE 4. CLEMENTINE STREET $1,200/ ACRE 5. SAVANA STREET $3,575/ ACRE 6. HOWELL AVENUE - SUNCLAIR $3,262/ ACRE 7. WEIR CANYON $6,751/ ACRE 8. ORANGEWOOD AVENUE $2,563/ ACRE 9. ORANGEFAIR LANE - COMMER- $9,230/ ACRE 10. RIVERA M.H. PARK/ FUJISHIGE $6,347/ ACRE 11. LEMON $7,150/ ACRE ZONE A ZONE B ZONE C ZONE D 1. SINGLE FAMILY (per unit) $1,322 $2,222 $1,600 $356 2. MULTI-FAMILY (per unit) $1,322 $2,222 $1,600 $356 3. CORRIDOR RESIDENTIAL (per unit) $1,322 $2,222 $1,600 $356 4. MOBILE HOME (per unit) $1,322 $2,222 $1,600 $356 5. HOTEL/ MOTEL (per room) $444 $747 $537 $119 6. MIXED USE RESIDENTIAL (per unit) $1,322 $2,222 $1,600 $356 7. MIXED USE NON-RESIDENTIAL (per 1,000 sf of gross floor area) $614 $1,033 $745 $164 8. COMMERCIAL (per 1,000 sf of gross floor area) $614 $1,033 $745 $164 9. INDUSTRIAL (per 1,000 sf of gross floor area) $430 $724 $521 $116 10. INSTITUTIONAL (per 1,000 sf of gross floor area) $369 $620 $446 $101 11. QUASI PUBLIC/ RECREATIONAL (per 1,000 sf of gross floor area) $35 $60 $42 $9 D. SEWER IMPACT FEES (East Anaheim) ZONE A ZONE B ZONE C ZONE D 1. SINGLE FAMILY (per unit) ESTATE $787 $1,101 $0 $0 2. MULTI-FAMILY (per unit) LOW-MEDIUM $0 $1,296 $0 $0 3. MOBILE HOME (per unit) $0 $0 $0 $0 4. HOTEL/ MOTEL (per unit) $0 $0 $0 $0 5. COMMERCIAL (per 1,000 sf) $0 $0 $0 $0 6. INDUSTRIAL (per 1,000 sf) $0 $0 $0 $0 7. INSTITUTIONAL (per 1,000 sf) $0 $0 $0 $0 SERVICE FEES C. SEWER IMPACT FEES (West Anaheim) E. SEWER IMPACT FEES (Central Anaheim) ZONE A ZONE B ZONE C ZONE D 1. SINGLE FAMILY (per unit) $2,235 $1,864 $2,130 $2,218 2. MULTI-FAMILY (per unit) $2,235 $1,864 $2,130 $2,218 3. CORRIDOR RESIDENTIAL (per unit) $2,235 $1,864 $2,130 $2,218 4. MOBILE HOME (per unit) $844 $702 $805 $838 5. HOTEL/ MOTEL (per room) $631 $527 $602 $628 6. MIXED USE RESIDENTIAL (per unit) $1,287 $1,073 $1,226 $1,278 7. MIXED USE NON-RESIDENTIAL (per 1,000 sf of gross floor area) $876 $730 $835 $870 8. COMMERCIAL (per 1,000 sf of gross floor area) $876 $730 $835 $870 9. INDUSTRIAL (per 1,000 sf of gross floor area) $613 $511 $584 $613 10. INSTITUTIONAL (per 1,000 sf of gross floor area) $525 $439 $501 $509 11. QUASI PUBLIC/ RECREATIONAL (per 1,000 sf of gross floor area) $50 $41 $47 $50 Unit Cost PCI Range: ≥ 65 65 to 55 ≤ 55 Trench & Borepit Fee $8.40 $11.60 3.60 Pothole Fee: $69.30 $95.70 30.29